Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 50 of 192
Applied filters:
Built Environment
Operations and Logistics
Public Sector Management
Show teaching notes
Clear all
Case study
Publication date: 2 December 2024

Aditya Kumar Sahu

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces analysis for understanding the situation of any company; to understand various demand forecasting techniques with the case example of Kaspians Café; to analyse different factors that influence the demand with the case example of Kaspians Café; and to learn how to choose the best time-series forecasting method based on the available dataset.

Case overview/synopsis

This case study focuses on operations strategy, specifically analysing the issues encountered by the Kaspians Café, a food joint establishment located within the Kaspians Institute of Management. Kaspians Café, due to its large student clientele, encountered operational inefficiencies such as inadequate inventory management, stockouts and wastage. These issues resulted in financial losses and customer dissatisfaction. This case study focuses on forecasting the demand for different food items at different times to get a better understanding of the stock to be maintained at Kaspians Café. Furthermore, Shyam Manral, the owner of Kaspians Café, was confronted with the difficulties arising from the surging popularity of neighbouring Dhabas and the escalating impact of food delivery platforms such as Zomato and Swiggy. The formerly prosperous Kaspians Café establishment, known for its uniform offers, was now encountering strong competition from the quaint ambience and varied menus of the Dhabas situated in close proximity to the campus entrance. These conventional establishments not only accommodated the changing preferences of students but also functioned as convenient centres for social meetings. The emergence of Zomato and Swiggy had revolutionised the eating patterns of students by providing a wide range of choices that were conveniently delivered to their residences, thereby diminishing the attractiveness of Kaspians Café. Manral was struggling to revive his business in light of these shifting circumstances. He pondered how to keep consumers loyal in the middle of changing cuisine preferences and the convenience provided by contemporary food delivery services.

Complexity academic level

This case study can be used in the operations management course at the MBA/postgraduate level.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 November 2024

Pratik Rajendra Satpute, Gautam Surendra Bapat and Shefali Joshi

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the…

Abstract

Learning outcomes

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the various operational procedures used to enhance a smooth group check-in in hotels; use the steps defined in group check-in procedure to improve service efficiency in hotel operations; and examine and evaluate the optimal solution for a smooth group check-in for hotels.

Case overview/synopsis

“The Big Fat Indian Wedding” delves into the challenges faced by Hotel Plaza Blu, a business hotel in Pune, Maharashtra, in 2023. A big wedding group was arriving at the hotel, which comprised almost 350 adults and 120 children. Mr Parag Patil, the front office manager, had done all the preparations for group arrival but just one hour before the arrival Mr Suresh Menon, the group coordinator, came and informed that 150 additional guests would be arriving, as the other hotel, where arrangements for these guests were made, had a major electricity generator breakdown and the hotel was in complete blackout. Patil had the challenge of formulating an action plan to achieve a smooth group check-in with the last-minute changes.

Complexity academic level

Executive development programmes and graduate-level courses in non-profit hospitality and tourism management might benefit from this case study. The operational management courses in the BBA, UG management programmes might all benefit from using this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 October 2024

Niaz Ahmed Bhutto, Abdul Rehman Shaikh and Sanober Shaikh

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the…

Abstract

Learning outcomes

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the procurement of services; evaluate the potential risks and challenges associated with relying on a single vendor for critical services; apply the four-stage model of crisis management to the breach of contract by Fresh Bites Catering; examine how adopting sustainable procurement practices, such as diversifying suppliers and establishing contingency plans, can mitigate these risks and ensure business continuity; and analyze the dynamics, roles and potential conflicts between the principal (Multan University) and agent (Fresh Bites Catering) using the principal–agent theory (PAT).

Case overview/synopsis

This case study explores the challenges and implications of sustainable procurement within the context of Multan University’s cafeteria services. It delves into the sudden contract breach by Fresh Bites Catering, a long-time partner responsible for providing central cafeteria services, and examines the resulting operational crisis faced by the university. This case study highlights key procurement processes, including vendor selection, contract management and adherence to sustainability principles, as well as the risks associated with single-vendor dependency. By applying frameworks such as the PAT, the four-stage model of crisis management and sustainable procurement practices, this case study encourages students to critically assess the failures in contract enforcement, risk mitigation and service continuity. Additionally, it stimulates discussion on the benefits of robust risk management strategies, multi-vendor approaches and clear contract terms to prevent future disruptions in essential services. This case study serves as a valuable tool for understanding how procurement strategies influence organizational performance and long-term sustainability in higher education institutions.

Complexity academic level

This is a decision-making case and can be taught in Master of Business Administration courses in purchase and supply management and operations management. This case study is mainly written to make students understand and analyze the potential risks of a single vendor, the benefits of diversifying suppliers and sustainable procurement.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 September 2024

Rajkumari Mittal, Parul Sinha and Bikramjit Rishi

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions…

Abstract

Learning outcomes

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions, the students will be able to:▪ Understand the transformation of rural retail from traditional models to organized modern retail;▪ Understand the opportunities and challenges of rural markets with specific reference to automobile products;▪ Identify and evaluate the various distribution channels available for rural markets; and▪ Devise a suitable rural-centric distribution model for automobile products following an appropriate logistics system.

Case overview/synopsis

Manan Motors, a dealership of Honda Motorcycle & Scooter India (HMSI) Private Limited in Hathras City of Uttar Pradesh province in India, has been operating successfully for the past two decades. Mr Manoj Bansal, the director at Manan Motors, was primarily targeting the urban markets with 60% dependency on the scooter portfolio of HMSI. But multiple pressures like stringent vehicle emission norms, price rise of two-wheelers and the impact of the pandemic took a toll upon the urban business of Honda Motorcycle and Scooter India Limited and subsequently upon Manan Motors. The sales for HMSI dipped from 15,121 million units in 2020–2021 to 13,466 million units in 2021–2022. Consequently, Bansal decided to alter the business strategy of Manan Motors and shift its focus from the urban to the rural territory of Hathras, where it could foresee demand for entry-level two-wheelers (engine capacity between 75 and 110 cc). Rural markets were developing, so Bansal realized that supplying a low-cost, low-end model to the rural Indian market was an opportunity for his dealership. Bansal’s decision to focus on the rural vertical of its two-wheeler business stirred several questions that floated in his mind. Should they manage distribution on their own, or through some channel members, or should they follow a rural-specific modern retail model?

Complexity academic level

The case study is designed for use by a postgraduate or executive-level audience for subjects such as sales and distribution management, distribution management and rural marketing. Students will understand the concept of distribution management and associated keywords specific to rural markets. The case study provides an opportunity to discuss and decide how a company can penetrate the rural market and also discusses the opportunities and challenges of rural distribution.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 18 July 2024

Abdul Rehman Shaikh, Manzoor Ali Mirani and Saqib Ali

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee training and supplier relationships when analyzing shrink and developing solutions, evaluate how technology improves production inventory control and visibility and recognize the importance of fostering a culture of employee accountability and ownership to minimize inventory loss and improve overall operational efficiency.

Case overview/synopsis

On June 2, 2023, sitting in his office in Karachi, Pakistan, Khan Aamir, the manager of store and inventory at Euro Manufacturing, found himself immersed in a cloud of confusion. The incessant loss of inventory items, particularly the nut bolts and small accessories, had become a perplexing challenge. To address these losses and provide a cycle count report to the director of supply chain, Aamir, manager of store and inventory, was given the responsibility to take action. He was looking for a comprehensive approach to address the current problems and prevent further losses in the future. This case study examines the various reasons for the losses, including theft, inadequate inventory control methods, human error and problems with suppliers. It highlights the importance of established procedures, the use of technology (such as barcode scanning, radio-frequency identification tagging and inventory management software) and the cultivation of a culture of accountability among employees.

Complexity academic level

This case study is developed for class discussion in the course of operations management or supply chain management. This case study is suitable for use with undergrad students. This case study can be taught in a module on operations management or supply chain management, as part of a broader course in business management or industrial engineering.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 June 2024

Sumanth Pramod Desai, Sushil Pare, Sanjay Hanji and M.M. Munshi

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load…

Abstract

Learning outcomes

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load distance values for warehouse location and choose the optimum location based on the load distance analysis.

Case overview/synopsis

DB Builders, a prominent Indian construction company, faced a crucial decision in selecting an ideal storage warehouse for a project involving 100 flats spread across five locations. Mr Vijay Kumar, an experienced material handling expert, was entrusted with this task as part of transitioning the company’s material allocation system toward centralization. Using practical travel distances, Kumar meticulously scouted four potential warehouse locations. The selection process hinged on three primary factors: load, distance to apartment sites, safety and cost of the premises, each carrying specific weightage. The project planning department provided scores for safety and cost, helping evaluate the options. This unique challenge arises due to varying material requirements across the apartment locations, demanding an efficient warehouse planning. The selection of the optimal storage warehouse holds paramount importance in facilitating the smooth execution of these larger projects. Kumar’s expertise and strategic decision-making are pivotal in ensuring a seamless transition toward centralized material handling, which is essential for the company’s future success.

Complexity academic level

This teaching activity is aimed at introductory/basic courses in Bachelors and Masters of Business administration.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 15 April 2024

Irfan Saleem, Muhammad Ashfaq and Shajara Ul-Durar

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict management styles of a female leader; and comprehend the organizational change process to devise an effective communication strategy.

Case overview/synopsis

Ever-changing business demands managers adopt organizational change in leadership styles, business processes, updated skill sets and minds. One must be ready to understand influential nurtured corporate culture and human resource resistance towards the inevitable change. This case study attempted to discuss the female protagonist dealing with an organizational conflict. The case study introduces one such protagonist from a century-old woman’s educational institution. Subsequently, this case study presents organizational change under the leadership of a female protagonist. This teaching case study gives the reader an insight into situational leadership, conflict management styles and the corporate change process by implementing an appropriate communication strategy. This case study describes the change process through the various decision-making scenarios that an academic institute over a century old faced during the post-pandemic crisis after adding a crucial protagonist. The employee union, followed by students and administrative employees, has challenged the dominating leadership position held by the college principal. Protests occurred due to the college administrator’s refusal to adjust her approach to leadership. This teaching case then provided different leadership styles of the current and old leaders. Finally, the case study lists the challenges a leader faces during turbulent times and the lessons a leader should learn from such situations while transforming the institute.

Complexity academic level

The teaching case benefits undergraduate students in business management subjects such as conflict management, leadership and organizational behaviour. Nevertheless, trainers can use this case study to teach seasoned managers and emerging leaders the significance of adopting and implementing change while understanding situational leadership.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 11 December 2023

Bishal Dey Sarkar, Prasad Vasant Joshi and Nisarg Shah

After completion of the case study, students will be able to understand the concept of clustering and identify clusters for improving capacity utilization, analyse transport…

Abstract

Learning outcomes

After completion of the case study, students will be able to understand the concept of clustering and identify clusters for improving capacity utilization, analyse transport routes to optimize logistics resources, analyse the impact of a full truckload on resource optimization, evaluate unused capacity and ascertain the impact of reverse milk run to reduce the same and apply clustering and reverse milk run to optimize the logistics resources.

Case overview/synopsis

The case study is about a freight forwarding company that offered end-to-end logistics solutions for the exporters based in India. Within a short time span, the company became one of the sought-after service providers for its clients. However, when the company planned to expand its business by expanding its client base, the efficiencies reduced and hurt the profitability of the company. It was all excellent with the limited number of clients, but as the number of distantly located clients surged, the operating costs increased. Trucks were running with partial loads, thus reducing efficiency. The rate of increase in cost surpassed the rate of revenue every time. The cost per mile of transportation was on the rise. The surging fuel prices were adding to the heat. In spite of being one of the first choices for clients, the company could not generate good profit margins. If they chose to increase prices, the company would have lost customers to the cheaper unorganized players in the market. It was time to choose between growth and survival. The company could not sustain itself without devising a mechanism to reduce costs. The company would not have sustained itself without devising a mechanism to reduce costs. To sustain in the business, the company had to device a mechanism to reduce costs. Whether to continue operating the conventional way or to transform? Was there a logistics strategy that would have improved transportation efficiency and reduced the costs for the company?

Complexity academic level

The case study is suitable for teaching post-graduate management courses in operations and logistics, supply chain management and supply chain analytics, as well as entrepreneurship-related courses.

Supplementary material

Teaching notes are available for educators only.

Subject code

CCS 9: Operations and logistics.

Case study
Publication date: 24 November 2023

Eduardo Russo and Ariane Roder Figueira

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of…

Abstract

Learning outcomes

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of the main biases that affect making decisions in environments of high uncertainty; and build and apply judgment models to support decision-making processes.

Case overview/synopsis

Motivated by recent international events responsible for causing supply shock and great volatility in the price of imported fertilizers, Brazil, which in 2022 was responsible for producing only 15% of all the fertilizer consumed by its agribusiness, ran against time by launching a new national fertilizer plan (PNF). The plan proposed to boost Brazil’s national fertilizer industry to fulfil a long-term vision of reducing the country’s external dependence by 2050. While awaiting the first results of the PNF, this case study casts the student participants in the role of Breno Castelães, chief advisor of the special secretariat for strategic affairs of the presidency of the republic, whose role is to recommend the country’s position in the face of external pressures to adopt international embargoes of Russian fertilizers because of its war with Ukraine.

Complexity academic level

This case study is suitable for undergraduate and graduate students of business administration and public management courses who want to deal with topics such as public policy, judgment and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 10: Public sector management.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 13 November 2023

Ann Mary Varghese, R. Sai Shiva Jayanth, Remya Tressa Jacob, Abhishek Srivastava and Rudra Prakash Pradhan

The learning outcomes of this case study are to understand the business model canvas and value propositions and apply advanced business innovation tools in electric vehicle…

Abstract

Learning outcomes

The learning outcomes of this case study are to understand the business model canvas and value propositions and apply advanced business innovation tools in electric vehicle business models; evaluate the current cargo vehicle scenarios at national and global levels and draw out the possibilities and costs for a new player; extrapolate the future scenario of the cargo economy, its electrification and positioning in a business-to-business (B2B) and business-to-customer (B2C) segment, especially for a developing economy; and improve the student’s ability to get organisational buy-in and execute new business models.

Case overview/synopsis

LoadExx is a fully electrified electric cargo service focusing on logistics in Kolkata, a metropolitan city in the eastern part of the country. The service of LoadExx commenced in January 2021 in the B2B segment after overcoming its then issues of driver hesitancy and customer anxiety and financial issues to adopt electrified cargo systems. The conundrum faced by LoadExx in its commencement thus had been solved under the able guidance of its owner Amit Arora. The case study was positioned four months after the commencement of LoadExx. To gain market power and traction, Arora and his team came up with the idea of market expansion. However, the current conundrum was whether LoadExx would enter the B2C segment in its current location or expand with the same business model to other parts of the country. The expansion was to be implemented in the immediate future to retain its rarity and reduce the imitability of the business model of LoadExx. This case study details the logistics and market operations of the cargo sector, especially electric cargo, in a developing economy, especially India. A teaching note supplementing the “Cracking the conundrum of e-cargo logistics: curious case of LoadExx” case study has been provided.

Complexity academic level

This case study is designed for undergraduate and postgraduate students and senior management professionals in executive education programmes undertaking courses in logistics management and supply chain operations and related cargo logistics courses. This case study denotes integrating key processes from end-users and gaining the trust of drivers, thereby showing the perspective of the plight and conundrums of a cargo aggregator working in the B2C segment. This case study could be used to discuss concepts related to not-for-profit firms, aggregators, policymakers and think tanks.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 31 October 2023

Vardhan Mahesh Choubey, Prasad Vasant Joshi and Yashomandira Pravin Kharde

This case study would help students in understanding the dynamics of logistics and logistics vendor roles and contributions to overall business operations. The case study covers…

Abstract

Learning outcomes

This case study would help students in understanding the dynamics of logistics and logistics vendor roles and contributions to overall business operations. The case study covers real-time information for applying the theoretical knowledge students gain related to the selection of logistics vendor. It would help students to understand and evaluate the dynamics of a new start-up related to cost, profits and dependency; understand and analyze the importance of third-party logistics (3PL) service providers in the supply chain; become aware of the key performance indicators (KPIs) important in the selection of logistics vendor; and develop and create measures for selecting logistics vendors on the basis of KPIs.

Case overview/synopsis

This case study was about an innovative start-up operating in the field of organic edible oils. The company catered to end consumers with its indigenous technology and processes. The innovative and healthy products were appreciated by the consumers, as was reflected in the surging demand figures. With the increasing popularity of organic products, the orders were surging. At the same time, issues such as damaged product delivery, increased cost per delivery of small packages and failure to deliver because of unserved pin codes by their logistics partners were being faced by the company. The case discusses the dilemma faced by the protagonist regarding the selection of the right 3PL partner. The case study is suitable for teaching courses in operations and logistics, supply chain management and entrepreneurship-related courses.

Complexity academic level

This case study is appropriate for postgraduate courses in entrepreneurship, operations management, logistics and supply chain management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS9: Operations and logistics.

Case study
Publication date: 14 September 2023

Prasad Vasant Joshi, Vardhan Mahesh Choubey and Harshal Gangadhar Desale

The learning outcomes of this study are to understand the theory of constraints and related concepts, to evaluate constraints impeding organizational growth and to develop a…

Abstract

Learning outcomes

The learning outcomes of this study are to understand the theory of constraints and related concepts, to evaluate constraints impeding organizational growth and to develop a solution addressing the constraints in the best possible way.

Case overview/synopsis

Bottlenecks or constraints impede an organization from reaching its full potential, thus having implications for the internal and external functionalities of the organization. Internally, many resources remain idle or deteriorate, as constraints always hamper the overall capacity. Externally, the organization might lose the customer for not fulfilling their demands. The organization may be unable to procure the raw material at economical prices from the suppliers, as large-quantity orders may not be placed. This case was designed to make students understand the theory of constraints (TOC) and related concepts. The TOC framework was a management philosophy developed by Dr Eliyahu Goldratt and popularly mentioned in his book The Goal. This case study considered a dairy plant as its central focus. The protagonist was challenged by the existing constraints in his dairy plant, and his dilemmas were introduced. The dairy processes were discussed, followed by details of supplies made to the dairy plant regularly. The capacity constraints at different levels were mentioned. The case also discussed the quick fixes adopted by the dairy to overcome the constraints. Finally, this case ended with a dilemma presented before the protagonist and a dire need for a solution thereafter.

Complexity academic level

This case was appropriate for introducing TOC to undergraduate and postgraduate courses in operations management, logistics and supply chain management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 14 September 2023

Arpita Agnihotri and Saurabh Bhattacharya

Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for…

Abstract

Social implications

Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for resolving the digital divide in Africa and offered a collaborative solution. The case also suggests how female CEOs invest in strategic corporate social responsibility (CSR) that could create a competitive advantage for firms. The case also discusses gender diversity issues in the science, technology, engineering and math (STEM) field and how Vodafone Ghana’s CEO tried to enhance gender diversity in the telecommunication sector and Vodafone. Obo-Nai did not emphasize gender diversity from a CSR perspective but believed in a business case for gender diversity, as an increase in participation of women in the STEM workforce could help the telecommunication sector innovate faster and resolve the digital divide challenge while also empowering women working from the informal sector.

Learning outcomes

What is the significance of a digital divide and the societal role of the telecommunication sector; Why female CEOs are more concerned about CSR and how CSR makes not charity but business case; Why female CEOs are more inclined toward collaborative strategies and how stakeholders are involved in collaborative strategies for reducing the digital divide; Exploring various strategies for enhancing gender diversity in the STEM field and the significance of gender diversity in the STEM field.

Case overview/synopsis

The case is about the challenges faced by Patricia Obo-Nai, the first female CEO of Vodafone Ghana, to bridge the digital divide in Africa while doing so in a profitable manner. Obo-Nai was an engineer by profession and won several awards as she rose to the post of CEO in Vodafone Ghana in 2019. During the COVID-19 pandemic, she took several corporate social responsibility (CSR) initiatives, such as making internet service freely available in certain schools and universities so that education could continue. Obo-Nai also emphasized gender diversity within Vodafone and urged other telecommunication players to focus on gender diversity from a social responsibility perspective because it was essential for innovation. Under Obo-Nai’s leadership, Vodafone itself launched several new products. She called for a multistakeholder collaborative approach to bridge the digital divide and to make 4G internet affordable in Africa. Obo-Nai collaborated with competitors like MTN Ghana to enhance Vodafone Ghana’s roaming services.

Complexity academic level

This case is intended for undergraduate or graduate-level business and management courses, especially international business and society, CSR and leadership courses. Graduate students in public policy may also find the case compelling.

Supplementary materials

Teaching notes are available for educators only.

Subject codes

CCS5: International Business; CCS10: Public Sector Management

Details

The Case For Women, vol. no.
Type: Case Study
ISSN: 2732-4443

Keywords

Case study
Publication date: 13 September 2023

Amrinder Kaur

The learning outcomes are as follows: understanding the impact on company growth through identification and alignment of stakeholder priorities in a project for SME in an emerging…

Abstract

Learning outcomes

The learning outcomes are as follows: understanding the impact on company growth through identification and alignment of stakeholder priorities in a project for SME in an emerging market; analyzing the impact of stakeholder alignment and relationship management on the project outcome; and evaluating the importance of Stakeholder Management for effective Project Management.

Case overview/synopsis

The case of ‘Hospedia Medicare,’ a medical device manufacturing company based in India, was started by a family involved in the medical devices business for over two decades. The company began operations in a new avatar and focused on one medical device or product by 2013. The product was designed with quality features to solve customer problems, making the cost relatively high compared to other domestic peers. Creating new product lines or updating the existing product attributes was imperative for the company to attain its growth objectives. The protagonist was dealing with a dilemma involving managing various stakeholders, aligning the project scope to create a growth story for the company in line with its vision and managing the stakeholders by understanding and analyzing their needs, expectations and interest, thus influencing the project outcome. The case can be used by instructors to identify, understand and evaluate the importance of different stakeholders on project outcome or success. Furthermore, it can be used to analyze and critique the impact of stakeholders on project scope, which can affect the long-term sustainability of the company, as different stakeholders have different expectations and needs. The case also details how regular communication, collaboration and awareness became essential for the project's success. Lack of an effective engagement strategy at the project planning stage can have risks concerning cost and achieving the overall vision, which creates a positive outcome for all the stakeholders.

Complexity academic level

The case study can be introduced to graduate and undergraduate students to reflect on and critique the importance of Stakeholder Management in Project Management. It can be used for, entrepreneurship, project management, operations and strategy, particularly emphasizing for small and medium enterprises (SMEs).

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 22 August 2023

Ranit Sinha, Sidhartha S. Padhi and Amol S. Dhaigude

The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change…

Abstract

Learning outcomes

The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change management and cost-benefit analysis concepts. The study aims to encourage them to use the data given in the case and exhibits to compare and contrast physical and digital supply chains (SC); design the digitized version of the traditional SC; examine the nitty-gritty of technology adoption in the SC context; develop the change management plans for the successful adoption and implementation of SC digitization; design the risk register and Explore the business process management; and conduct the return on investment analysis.

Case overview/synopsis

Amber Yen, Chief Operating Officer Apparel Sourcing at Ransys Partners Ltd (RSL), was presented with the task of reducing physical sample production cost and time without impeding order pipeline. RSL was experiencing significant capacity constrain during the COVID-19 crisis, failing to deliver physical samples to international brands. To win large export orders, RSL had to adopt a new innovative way to reduce the sample approval process while meeting customer requirements. Ms Yen wanted to convert the entire sample approval process into a digital mode. She was facing multiple challenges related to the design, implementation and adoption of the digital sample approval process to coordinate the entire SC. She had limited time and was grappling with other impending constraints such as increasing cost, intense competition, demanding customers, shortage of labor due to COVID-19, reducing the bottom line. It was her time to test the idiom “necessity is the mother of innovation”.

Complexity academic level

The target audience for this case is management or business school students. This case can be used to teach digitization of SC, operations management, organization behavior, digitization of enterprises, IT for business, new service development, supplier management technology adoption, and change management in management or business schools.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 26 June 2023

Ramkrishna Dikkatwar, Tanmoy De and Mohammed Laeequddin

To understand a firm’s service concept and process; to explain the service design that differentiates itself by making trade-offs in operations and service offering; to identify…

Abstract

Learning outcomes

To understand a firm’s service concept and process; to explain the service design that differentiates itself by making trade-offs in operations and service offering; to identify the importance of deliberately designed interrelated systems and resources to achieve growth in services and to evaluate the fit of new design elements in the service offering.

Case overview/synopsis

Ajay Takeaway Foods LLP (Ajay Foods) is a food venture founded by Mr Jaideep Solanki and Mr Ajay Solanki and operates as a chain of quick service restaurants with a simple mission to sell food that is good, affordable and accessible to all. Ajay Foods serves only pure vegetarian and limited variants of burger, pizza and cold coffee. Ajay Foods rolled out 75 stores in just 18 months during the COVID 19 pandemic. Ajay Foods’ founders were contemplating on expanding menu. There was growing demand for food items such as samosa, wraps, sandwiches and French fries. One of the founders got into dilemma: How many items? and Which item(s) to add to the menu?

Complexity academic level

This case can be used at post-graduate level to teach basic frameworks of service concept and design. The case covers a range of topics such as service processes, service elements and product offerings in a service setting. It can be used effectively with MBAs and Hospitality Management program in courses that focus on Service Management, Service Operations or Service Marketing Strategy.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 15 May 2023

Rajiv Aserkar

Supply Chain Management, Technology, Procurement, Supply Chain Finance

Abstract

Subject area

Supply Chain Management, Technology, Procurement, Supply Chain Finance

Learning outcomes

The key learning objectives are as follows: to gain critical insights into e-commerce supply chains of fashion garments; understand the importance of digitization to manage the risks due to supply chain disruptions; evaluate the role of digitization to improve supply chain performance; understand the importance of supply chain finance in maintaining a healthy buyer–supplier relationship; and appreciate the role of supply chain digitization to transform a regional supply chain into a global supply chain.

Case overview/synopsis

This case highlights the challenges faced by fashion garments industry due to fragmented nature of their supply chains, where the manufacturing base was in the east and most of the consumers in the west. Digitization can create a bridge to integrate these supply chains to drive out their inefficiency, fragility and vulnerability to disruptions.

Complexity academic level

The case could be discussed in 90 min of an Operations Management, Supply Chain Management and Technology Management class at MBA or Executive MBA level.

Supplementary Material

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 16 December 2022

Peeyush Pandey, Patel Jinil Ashvinbhai, Yushmita Singh, Tania Mittal, Ishank Goel, Bharat Kumar Mehta and Sayali Tapas

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants…

Abstract

Learning outcomes

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants will learn the application of the factor loading method and aggregate planning.

Case overview/synopsis

This case revolves around the Modi Agro Pvt. Ltd, a mango procurement and distribution business established in 1994 by Mr Dhanush Modi in Mumbai, India. Mr Mahendra Modi, son of the company owner, observed that the different seasons of cultivation and varied customer demands lead to changing workforce requirements during the procurement process. In addition, the production quality, variety, available resources, procurement location and cost play a significant role in establishing a long-term relationship with the customers. This case highlights the problem faced by Mahendra in determining an appropriate location among all available options for mango procurement and the optimal workforce for each month to meet the varying customers’ demands.

Complexity academic level

The case can be used as teaching material for participants of the course Service Operations Management, Operations Management, Decision Analysis and Quantitative Techniques

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Case study
Publication date: 12 December 2022

Archit Vinod Tapar, Deepika Jain and Archana Patro

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with…

Abstract

Learning outcomes

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with various stakeholders in the supply chain in increasing efficiency and effectiveness; and to comprehend the challenges in the implementation of technology in SCM.

Case overview/synopsis

This case study presents Haryana’s challenges in implementing the digitization of the supply of food grains to the public. Mr Srinivas, a consultant to the Department of Food and Public Distribution, is required to suggest the future roadmap while accounting for the challenges faced in the digitization of the distribution of grains to the public in the state of Haryana. The students are expected to use the information given in the case and exhibits to discuss and critically think about the various stakeholders involved when change initiatives are implemented on an organizational level and recommend solutions based on the voices of various internal stakeholders.

Complexity academic level

Postgraduate/Masters in Business Administration/Masters in Management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 24 November 2022

Swapnil Garg

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish…

Abstract

Learning outcomes

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish between operational and strategic levers of a turnaround strategy; ■ analyze and evaluate past and present turnarounds from a sustainability perspective; and ■ formulate managerial actions to make turnaround sustainable.

Case overview/synopsis

Braithwaite Company Ltd. (Braithwaite) was a specialized engineering firm headquartered in Kolkatta, India. It primarily undertook structural steel fabrication to make railway wagons and bridge structures. It was incorporated as a private enterprise almost a century back. However, since its nationalization five decades ago, it has been operating as a public sector undertaking (PSU) under the aegis of Indian Railways, a department of the Government of India. The case documents the past three decades of the firm’s journey, during which it experienced three episodic turnarounds. Details of the first two turnarounds are presented as the background, in light of which sustainability of the third turnaround is to be examined. The case explores the sustainability of organizational turnarounds from the perspective of the current Chairman and Managing Director (CMD), the case protagonist. Braithwaite underwent financial and operational distress in 1992, 2005 and 2015 and negotiated them under different leaders. These leaders from diverse backgrounds used distinct tactics and strategies to bring about organizational turnarounds. The case provides data and information to assess the sustainability of the third turnaround. Hence, it allows a class to explore the paradoxical observation that while “turnaround” inherently implies sustenance of good performance over time, turnaround sustainability is not spontaneous in the real world. The case deals with the performance issues of PSUs, which make significant contributions to the national economy in the case of emerging economies (for example, 5%–8% of the Indian National gross domestic product is contributed by PSUs; https://swarajyamag.com/ideas/psus-are-crucial-for-indias-growth-but-only-if-they-play-a-strategic-role). Under government ownership and management, the poor performance of PSUs is often attributed to bad decision-making by its top management. In contrast, Braithwaite’s top management’s sound contextual decision-making resulted in a jump in its performance during each turnaround phase, but unsound fundamentals resulted in the unsustainability of the turnarounds. Hence, the case enables an exploration of the unique challenges faced by PSU that emanate from legacy roles, monopolistic markets and dual purpose – the concurrent pursuit of profits and social welfare. Consequently, the case allows an examination of the reasons for the distress of PSUs and the viability of turnaround strategies in the context of the broader Business–Government–Society landscape in emerging economies.

Complexity academic level

The case is written for use in the MBA elective course covering “Strategic Revival and Turnaround Strategies.” It can be used at the beginning of the course to identify reasons for organizational failure/distress or in the later part of the course to discuss the implementation of operational and strategic turnaround strategies.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 15 November 2022

Anupam Saxena, Shalini Nath Tripathi and Swadesh Kumar Singh

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an…

Abstract

Learning outcomes

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an opportunity;▪ importance of service excellence and customer satisfaction through customer delight and customer feedback; and▪ utilisation of resources and excellent time management strategies.

Case overview/synopsis

This case discusses how vital teamwork and motivated leadership can convert a crisis such as Covid-19 into an opportunity. This case study talks about Uttar Pradesh Metro Rail Corporation (UPMRC), a metro rail corporation working to develop metro trains in the Indian state of Uttar Pradesh. The case discusses how challenging it was for the metro rail corporation to transform its processes in a short period and deal with the crisis on major fronts such as facilities maintenance, human resource management, ensuring safety and security of its staff and riders, motivation of staff, service quality and maintaining all operational aspects. The case discusses how UPMRC is a leader on all fronts and has excelled in its operational work. It talks about what challenges the lockdown and unlocking phase posed in front of the leadership and how teamwork, dedication to exemplary service quality and customer satisfaction gave the team the strength to make changes that improved their processes and helped them overcome the crisis.The case starts with a discussion of metro rail inception and incorporation of UPMRC and then how this newly formed metro has to face the challenges of pre-lockdown period where the team worked very hard for sanitisation and safety. The lockdown created a completely different set of challenges related to the facilities and the entire metro train systems, which was a difficult situation to deal because of restrictions and other challenges. However, the team dealt with situations with strength and strategic planning, leading to better managed processes and staff. The unlocking phase also gave many challenges that the team handled with a lot of care and efficiency.

Complexity academic level

This case is suitable for post-graduate-level courses on services marketing, service operations management, general management, crisis management and strategic management. Participants can use the case to develop an understanding of strategic planning and management.This case can also be used in the executive education program for managers to encourage them to think through challenges faced by metro rail corporations.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

Case study
Publication date: 6 September 2022

Işık Özge Yumurtacı Hüseyinoğlu, Deniz Kurtay, İrem Aşar and Serra Dilmaç

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics…

Abstract

Learning outcomes

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics requirements almost halved the annual number of shipments and the time needed for operation and documentation activities. In addition, reduced carbon emissions made this an environmentally friendly transportation model, in line with trends in society.

Case overview/synopsis

The basis for this case study was the analysis of Whirlpool Turkey’s transportation system for materials used in the production of white goods. Data obtained through fieldwork and cooperation with company consultants showed that some suppliers have high annual logistics costs. This inefficiency causes time loss and increases the total distance traveled and thus carbon emissions. In the case study, the current application created inefficiency in cost and time management, and therefore, after determining the factors that increase costs, different transportation solutions were developed accordingly.

Complexity academic level

This case is particularly designed for undergraduates in the final semester of management courses that specialize in supply chain and operation management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 5 September 2022

Aasha Jayant Sharma and Swapnil Samant

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of…

Abstract

Learning outcomes

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of contingency planning and create what-if scenarios, to step by step guide students how to build a network contingency planning tool and to enable students to use tools such as solver to build up a dashboard with given information.

Case overview/synopsis

The case is about Godrej Commercial, a vertical of Godrej and Boyce that handles warehousing and transportation support to five verticals under the banner of Godrej operating pan India. How Godrej is trying to deal with COVID pandemic, what were their coping strategies and how contingency planning is done is what this case is all about. The main focus of this case is understanding how network contingency planning is done and what parameters should be considered. How a dashboard can be developed that can be used as a base for taking strategic decisions related to networking given the uncertainties due to COVID. The case gives hands on to students to use solver and build a dash board, plus gives a peep into Godrej and its operations.

Complexity academic level

This study is suitable for students of undergraduate or first year MBA level. Specifically, the case can be used in business strategies, operations and supply chain management courses.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 9 May 2022

Burcu Keskin

The case would be relevant to undergraduate level or an introductory master's level course in operations management (OM), supply chain management and production.

Abstract

Study level/applicability

The case would be relevant to undergraduate level or an introductory master's level course in operations management (OM), supply chain management and production.

Subject area

The case can be used as part of a core OM course in the MBA curriculum or any OM or supply chain elective.

Case overview

As a highly diversified manufacturing services company, Jabil's S&OP solution supports customers across many industries such as automotive, cloud computing, consumer packaging, healthcare, mobile, retail and telecommunications. Jabil's customers expect a rapid and accurate response to their demand within hours. Previously, Jabil used a series of legacy disconnected planning tools, unsynchronized data required time-consuming manipulation with Excel. Processes were conducted in siloes leading to a “load and chase” approach, which resulted in excess inventory, component shortages and inadequate capacity. The case focuses on one of the Jabil executives, Lizet Tymon (she). Struggling with the issues caused by the disconnected planning tools, Lizet champions implementing a fully integrated suite of services (built on top of the Kinaxis' RapidResponse software platform). The technology solution proposed by Lizet was ultimately implemented across the company, and the project received high marks, and it opened up career opportunities for her. However, it was not a smooth ride at the very beginning. The case focuses on the issues experienced by Lizet, as she is introducing a new technological solution approach and trying to earn support from her team, her peers, her immediate supervisor, her customers and her higher-level executives.

Expected learning outcomes

The teaching objectives include: understanding and appreciating the supply chain complexities experienced by a global contract manufacturer; helping students think critically regarding the issues around the sales and ops planning; identifying the data needs for the operation and management of a worldwide, connected supply chain; investigating agile solution approaches for information sharing, decision-making and decision-sharing; and exposing the challenges associated with a large-scale technology adaptation.

Social Implications

This case study describes the supply chain challenges experienced by a global manufacturing solutions provider and illustrates the technology adaptation led by a female executive.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and Logistics

Case study
Publication date: 28 March 2022

Arvind Shroff and Bhavin J. Shah

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its…

Abstract

Learning outcomes

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its initiative is an apt example of the wonder which preventive care can bring in the context of rural health. Community participation: The case can be instrumental in showing the pathway to encourage community involvement in mainstream health by promoting the holistic model of SSSSH that understands mothers and children's health profile and needs, especially in the unreached rural segments of an emerging economy like India. Importance of healthy childhood: World Health Organization (WHO) promotes the school health programme to prevent health risks among children by inculcating healthy behaviours during childhood. The successful SSSSH model proves that it is implementable by integrating comprehensive health education modules in the existing institutions for medical care.

Case overview/synopsis

The challenge of a healthy childhood is inadequate availability and accessibility of quality care. Non-awareness of the parents is also a significant reason for the children who miss the benefit of a happy childhood. While much is planned by the Government and some part of it being executed, this case highlights the effectiveness of the maternal and child health programme executed by the Sri Sathya Sai Sanjeevani Hospital (SSSSH). This initiative fulfills the dire need of ensuring the preventive healthcare component leading to safe motherhood and safe birth of healthy children. Further, the case is also the culmination of pin-pointed innovative awareness activities such as school health screening and the Divine Mother and Child Health Program (DMCHP). It opens up the discussion on the current model of health care followed by SSSSH, Raipur, and its impact in the local areas to decide on its expansion across the country for nationwide implementation.

Complexity academic level

Bachelors in Business Administration, MBA, Executive MBA, Post Graduate Diploma in Healthcare Management

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 23 March 2022

Manuel De Vera, Donn David Ramos, Junica Soriano and Tristan Piosang

At the end of the course, the participants are expected to be able to: understand and explain what is bridging leadership (BL); understand stakeholder, stakeholder engagement and…

Abstract

Learning outcomes

At the end of the course, the participants are expected to be able to: understand and explain what is bridging leadership (BL); understand stakeholder, stakeholder engagement and stakeholder management; conduct a stakeholder analysis based on the details of the case; evaluate the BL processes based on the details of the case; and communicate how BL was used in Dumingag.

Case overview/synopsis

Mayor Nacianceno “Jun” Pacalioga’s journey towards the transformation of the municipality of Dumingag, Zamboanga del Sur in Mindanao, Philippines has been rooted in his daily interaction with its residents by way of morning walks around the town. He has always been involved in organizing people in his youth and as a public servant, improving the plight of the people of the 4th class landlocked and agriculture-dependent municipality has always been his primary concern. There are currently an estimated 50,000 people from forty-four (44) barangays (communities/villages) in the Municipality of Dumingag. In 2007, most farming households of the municipality earned US$ 60 monthly. By 2016, after Pacalioga’s 9-year stint as local chief executive or as mayor, the percentage of households with income below the poverty threshold have significantly decreased to 38%. Local health indicators have also become exemplary with only 0.77% of children between 0-5 years old recorded as malnourished, with maternal mortality death rate. When it comes to food, only 0.25% of households experience food shortage.

This case highlights the Bridging Leadership Framework as a paradigm to help address social divides and inequities in complex environments such as Dumingag. In realizing bridging leadership as a community of practice, Pacalioga employed participatory processes to develop the Genuine People’s Agenda, and the integrated Transformative Education to build the capacity of different stakeholders in the municipality. These processes mobilized different stakeholders to move towards the common goal of improving the plight of the Duminganogs. Now Dumingag is enjoying the broad-based benefits of the program; including recognition by numerous local and international organizations and civic groups on the efforts of Pacalioga and the people of Dumingag in transforming their once poverty-stricken town in Zamboanga del Sur, Mindanao, Philippines.

Complexity academic level

Masters Level/Executive Education.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 21 March 2022

Saad Tahir, Asher Ramish and Talha Mehmood

This case study aims to be taught at an MBA level. Students who are majoring in the supply chain would benefit the most from this case study. This case study has elements of…

Abstract

Learning outcomes

This case study aims to be taught at an MBA level. Students who are majoring in the supply chain would benefit the most from this case study. This case study has elements of logistics management, supply chain management, supply chain strategies, warehouse and logistics and responsible supply chain. The learning outcome of this case study could be seen if the students identify the gaps in the real market setting and come up with strategies that would connect and/or fill the areas missing. Teaching objective 1: students should be able to identify unstable demand scenarios and learn how demand collaboration could be implemented in that setting. Teaching objective 2: students should identify how a transparent and interconnected supply chain, both upstream and downstream, can be created. Teaching objective 3: students should be able to understand the role of a responsible supply chain and to define the role and responsibility of each party. Teaching objective 4: students should be able to learn the dynamics of safety stocks, reorder points and incorporate that in warehouse management decisions.

Case overview/synopsis

Based in Lahore, Pakistan, Total Technologies (Pvt.) Ltd is a company that supplies medical equipment and provides solutions in the health-care industry. This case explores the supply chain issues faced by Tallat Mehmood, who is the Managing Director of the company, during the third wave of the COVID-19 pandemic in April 2021. Oxygen cylinders have become the need of the hour as more and more patients need oxygen. The supply of medical gases across Pakistan has become a logistical issue, causing hospital reserves to be drained without timely replenishment. Increasing the number of beds in hospitals, with limited oxygen outlets, has increased the demand for oxygen cylinders. Operating under unstable demand and not being able to meet it has caused Tallat to realize that the company is out of its comfort zone and is not responding well to the environment. The company needs to redesign the supply chain as well as collaborate with the supplier and buyer to provide better levels of service.

Complexity academic level

Masters level supply chain courses.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Case study
Publication date: 15 February 2022

Saad Tahir and Asher Ramish

This case study aims to be taught at an MBA level. Specifically, those students who are majoring in supply chain would benefit the most from this case study. This case study has…

Abstract

Learning outcomes

This case study aims to be taught at an MBA level. Specifically, those students who are majoring in supply chain would benefit the most from this case study. This case study has elements of supply chain management, supply chain strategy, warehousing and logistics, and a digital supply chain for Industry 4.0. The learning outcome of this case study could be seen if the students are able to identify the challenges and opportunities of a digital supply chain for Industry 4.0 and how it could be implemented methodically. Teaching Objective 1: Students should be able to identify what challenges organizations face if they implement a digital supply chain for Industry 4.0. Teaching Objective 2: Students should be able to identify what opportunities can be tapped if Big Data Analytics are used in a supply chain teaching. Objective 3: Students should layout a methodical plan of how an analogue company can gradually achieve the objective of implementing a digital supply chain for Industry 4.0 in procurement function.

Case overview/Synopsis

Based in the Lahore region of Pakistan, Xarasoft is a footwear manufacturing company which has undertaken a decision to transcend to a digital supply chain for Industry 4.0 by 2027. Asif, who is the Head of the Department of Supply Chain, has to come up with a plan to present in the next meeting with the CEO. Xarasoft is a company that preferred to work in an analogue routine. The company set production targets and sold goods through marketing. With no forecast or exact demand, the company had decided to procure 140 million units of raw material and carrying a huge inventory, a percentage of which had to be thrown away as it started to degrade. While the company did have machinery on the production floor, they were operated manually and were a generation behind. Asif faced the question of what challenges he would face and exactly how would a digital supply chain for Industry 4.0 be implemented in the company.

Complexity academic level

Masters level supply chain courses

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 12 January 2022

Soumyajyoti Datta

Familiarize with the retail operations of handicrafts, facility location problem, apply multi-criteria decision through the goal programming approach and solving the same with MS…

Abstract

Learning outcomes

Familiarize with the retail operations of handicrafts, facility location problem, apply multi-criteria decision through the goal programming approach and solving the same with MS Excel.

Case overview / synopsis

The case portrays a dilemma in the context of retail operations of a small-scale handicraft company known as Odisha Craft. Located in Odisha, Susanta Mohanty, the owner, was finding it a challenge to decide on the most promising location for his new retail outlet in the neighbouring city of Kolkata. He had five choices for the locations. Odisha craft was established by his father-in-law in 2009 with an objective to preserve and promote the rich culture of the handicrafts designed by the local artisans and ensure sustainable rural livelihood. The company had been facing numerous challenges and the pandemic has given a very formidable blow to the monthly revenues. The case brings out the multi-faceted dilemma of deciding on the facility location in 2020, involving a set of conflicting criteria. The case unfolds a systematic solution approach resolving the dilemma using MS Excel.

Complexity academic level

Courses such as operations research, operations management, service operations and retail operations for MBA students and trainings for junior-middle level executives.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 09: Operations and Logistics

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 1 December 2021

Roula Al Daia and Hala Khayr Yaacoub

The blast at Beirut Port on the 4th of August was the cherry on the cake in a series of disastrous governmental failures manifested in the of lack of trust, an unprecedented…

Abstract

Complexity academic level

The blast at Beirut Port on the 4th of August was the cherry on the cake in a series of disastrous governmental failures manifested in the of lack of trust, an unprecedented economic crisis, hyperinflation, financial fallout, political bottle necks, toxic environmental situation and a vertical cleavage between the government and the people. The blast resulted in billions of dollars in losses both at the port and the surrounding Beirut area, destroyed more than 300,000 housing units, displaced their residents, ruined many artifacts of cultural heritage, injured thousands of people and killed hundreds. Definitely, it was a case of negligence in the storage of the Ammonium Nitrate, corruption, irresponsible leadership or all of these together. However, investigations are still underway to pinpoint the responsible individuals and to bring them to justice. This case looks at potential ways that could have prevented the blast, by questioning the reasons behind the non-voicing out of objections against the nature of the material stored unsafely for several years in Container 12 at the Port. Through the lens of Hadi Karim, a fictional character, the authors lead the readers to consider the disaster’s characterization, as well as applicable disaster management frameworks. The case also emphasizes the role of public leadership and leads the readers to consider measures and processes that could have been abided by to prevent the disaster.

Case overview

Against the backdrop of the recent Beirut Port explosion, this case examines how events unfolded leading up to the tragedy, highlighting how it could have been avoided, as well as the managerial and ethical dimensions involved.

Leaning objectives

At the end of the case, students will be able to: 1. Characterize the disaster in terms of type and nature. 2. Analyze the blast by referring to the relevant disaster management frameworks. 3. Analyze the critical role of ethical and transformational leaders pre and post disaster. 4. Reflect on the role of employees in preventing disasters mainly through whistleblowing.

Social implications

Shedding the light on an avoidable disaster, drawing lessons to avoid the occurrence of such events in the future, and raising awareness on disaster management and on whistleblowing as a tool in the ethical leader’s toolbox.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 1 December 2021

Asad Ali Qazi, Abdul Rehman Shaikh and Andrea Appolloni

Mr Qazi was sitting in his office in the Multan branch, reviewing his past month’s key performance indicators when he got a call from his Town Operations Supervisor, Mr Ahmed…

Abstract

Case overview

Mr Qazi was sitting in his office in the Multan branch, reviewing his past month’s key performance indicators when he got a call from his Town Operations Supervisor, Mr Ahmed, based in Bahawalpur. Ahmed was recently promoted and transferred to Bahawalpur, from Multan branch. He informed Qazi about the huge inventory variances, which were not earlier reported by the previous Town Operations Supervisor, Mr Sagheer. Qazi was informed that differences were around 2.37% of total sales vs the allowable company limit of Zero inventory variance. Qazi was worried about whether to report these differences to higher management or not. He was very well aware that reporting might even cost him his job, and that of Sagheer too. He could not see any solution to the recovery of the inventory or cash against the same. Should Qazi take a risk and let go of Sagheer? Should he report the differences?

Expected learning outcome

1. Demonstrate the fraud and integrity-related issues. Why and how happened? 2. Analyzed the role of organizational policies in the decision of blow the whistle. 3. Identify the behaviors that helped a whistle-blower. 4. Assess the ethical dilemmas in which professional duties may conflict with personal ethics. 5. Propose organizational policies to encourage whistle-blowing and to discourage the fraud or integrity-related issues.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Study level/applicability

BBA.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Abstract

Subject area

Macro-Economics.

Study level/applicability

Undergraduate and MBA.

Case overview

The COVID 19 pandemic-related restrictions devastated South Africa’s economy in 2020 and although the restrictions were generally less damaging than in 2020, the government had to budget for vaccinations and rebuild the economy. Public service unions had just announced that they were demanding an increase of 4% above inflation for their members and that they were preparing for a strike. They were bitter about the fact that the South African Government had withdrawn from the last year of a three-year wage agreement in February 2020 and their members had not received an increase for the two years. These demands and Finance Minister Mboweni’s response to them had to consider the structural and cyclical impact on the fiscus and economy.

Expected learning outcomes

The learning outcomes are as follows: understand the general objectives of fiscal policy and stakeholders’ interests; understand the tradeoffs in fiscal policy and the implications of taking a position; and make recommendations based on reasoned judgements about those recommendations.

Complexity academic level

Undergraduate and MBA level courses on Macro Economics.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 29 October 2021

Vanita Bhoola, Vineeta Dwivedi and Ayalur Vedpuriswar

Project Management, Entrepreneurship, Risk Management, Communication.

Abstract

Subject area

Project Management, Entrepreneurship, Risk Management, Communication.

Study level/applicability

Study level: MBA and Executive Education.

Applicability: This case can be taught in the project management course. It will cover the project-planning phase, which is an iterative or progressive elaboration for the entire project lifecycle. The case will help in discussing how project management is an important discipline to manage projects and stakeholders effectively.

Case overview

The case depicts the dilemma of a passionate entrepreneur who is setting up an ambitious dairy business but project execution goes awry. The case discusses the challenges related to project planning and execution.

It captures the essence of proactive risk management, measures that can mitigate risks and create opportunities. The case also discusses the entire project lifecycle from project initiation to closure and the challenges a manager has to face in terms of stakeholder engagement, risk management, stakeholder communication and scope change.

Expected learning outcomes

To understand the alignment of the project with the organisation strategy; to learn to create a project plan and monitor and control the scope, schedule, resources and costs; to accurately estimate project costs, timelines, and quality and schedule, using tools like MS Project; to learn the risk management techniques for managing projects, teams and stakeholders; and to manage stakeholder communication effectively.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 31 August 2021

Aasha Jayant Sharma and Shashank Bhat

It enables students to understand and design a business model canvas, design standard operating procedure (SOP) for very unorganized business operations and also devise base…

Abstract

Learning outcomes

It enables students to understand and design a business model canvas, design standard operating procedure (SOP) for very unorganized business operations and also devise base pricing for vendor negotiation.

Case overview/synopsis

Mr Gaurav Chaudhary, chief executive officer and Founder of Pashushala.com, established a first-ever Livestock online marketplace in India, leveraging the penetration of internet users in 2019. Pashsuhala.com evolved as an all-inclusive ecosystem that offered an innovative business model by bundling financial aid, logistics, veterinary and insurance solutions to its buyers and sellers. While every other aspect seemed to have had fallen in place, Gaurav was not convinced with the everyday handling of the cattle especially during transportation. Transporting cattle was the most challenging task tempered with issues such as changing weather conditions, stock density, lack of training on handling cattle while loading and unloading, long journey hours, feeding and watering procedures and many more for which Gaurav had to depend on the logistics partners. Gaurav was in a dilemma whether to have his own fleet armed with trained personnel for transporting the cattle or to streamline the existing operating procedures into SOP to be followed by logistics partners. If he continued with logistics partners he also had to work on standard costs i.e. fixed and variable costs incurred during the transportation of livestock. The case deals with business concepts such as supply chain risk management in the livestock sector, SOPs for a very unstructured and unpredictable ecosystem, pricing strategies and business model canvas.

Complexity academic level

Masters in business administration (MBA) and Executive MBA level.

Supplementary materials

Teaching Notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 31 August 2021

Subrat Kumar and Asha Bhandarker

Abelha et al. (2018). “Transformational Leadership and Job Satisfaction: Assessing the influence of Organizational Contextual factors and Individual Characteristics” Review of

Abstract

Supplementary materials

Abelha et al. (2018). “Transformational Leadership and Job Satisfaction: Assessing the influence of Organizational Contextual factors and Individual Characteristics” Review of Business Management, Volume 20 No 4, pp. 516–532. Avolio, B. J., Zhu, W., Koh, W. and Bhatia, P. (2004). Transformational leadership and organizational commitment: Mediating role of psychological empowerment and moderating role of structural distance. Journal of Organizational Behavior: The International Journal of Industrial, Occupational and Organizational Psychology and Behavior, 25(8), pp. 951–968. John M Alexander and Jane Buckingham, “Common good leadership in Business Management: an ethical model from Indian tradition”, Blackwell Publishing, 2011, UK and USA. Angus Corbett (2016). A systems approach to regulatory excellence (pp. 255–270), Achieving Regulatory Excellence, Brookings Institution Press, retrieved from http://onlinepubs.trb.org/onlinepubs/PBRLit/Corbett.pdf. Cary Coglianese (2015), Listening, Learning, Leading- a framework for regulatory excellence, Penn Program on Regulation, sourced from https://kleinmanenergy.upenn.edu/wp-content/uploads/2020/08/Listening-Learning-Leading_Coglianese-1.pdf

Learning outcomes

First, skills: to help students to apply their knowledge in transformational leadership; to help students to apply their understanding of impact of transformational leadership on organizational excellence in not-for-profit organizations. Second, knowledge enhancement: to understand the various components of transformational leadership; to enable the students to understand the different components of organizational excellence with a special focus on not-for-profit organizations and government regulators; to enable the students to understand the process of impact of transformational leadership on organizational excellence and its relevance in emerging markets context. Third, attitude development: students should understand the importance of leadership and its impact in emerging markets.

Case overview / synopsis

The case elucidates the transformational leadership style of AICTE Chairman and his key attributes of humility, high ethical standards, openness to ideas and suggestions and problem-solving attitude. The case also highlights how the transformational leadership style of AICTE Chairman heralded the journey of Organizational Excellence of AICTE – an Indian Technical Education regulator. The case maps the change of AICTE from an inward-looking, controlling, opaque organization to a forward-looking, enabling, transparent organization.

Complexity academic level

This case can be used in leadership classes for Management in Business Administration (MBA) students and participants in executive development programs. The case focuses on transformational leadership and its impact on organizational excellence in context of emerging markets The case also outlines the various components of organizational excellence in not-for-profit organizations and government regulators and hence provides a fresh perspective for measuring organizational excellence.

Subject code

CSS: 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 16 August 2021

Raj V. Amonkar, Tuhin Sengupta and Debasis Patnaik

The learning outcomes of this paper are as follows: to understand the context of seaport logistics and supply chain design structure, to apply Monte Carlo simulation in the…

Abstract

Learning outcomes

The learning outcomes of this paper are as follows: to understand the context of seaport logistics and supply chain design structure, to apply Monte Carlo simulation in the interface of the supply chain and to analyze the Monte Carlo simulation algorithm and statistical techniques for identifying the key seaport logistics factors.

Case overview/synopsis

It was 9:00 p.m. on November 10, 2020, and Nishadh Amonkar, the CEO of OCTO supply chain management (SCM) was glued to the television watching the final cricket match of the Indian Premier League, 2020. Amonkar’s mobile phone rang and it was a call from Vinod Nair, a member Logistics Panel of Ranji Industries Federation. Nair informed Amonkar that it was related to the rejection of several export consignments of agricultural products from Ranji (in the western part of India). The rejection was due to the deterioration in the quality of the exported agricultural products during transit from Ranji to various locations in Europe.

Complexity academic level

This course is suitable at the MBA level for the following courses: Operations research (Focus/Session: Applications on Monte Carlo Simulation). SCM (Focus/Session: Global SCM, Logistics Planning, Distribution Network). Logistics management (Focus/Session: Transportation Planning). Business statistics (Focus/Session: Application of Hypothesis Testing).

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 16 August 2021

Akhil Damodaran, Tarun Dhingra and Prasoom Dwivedi

The case study helps students to understand how public-private partnership (PPP) airports runs their business, how regulatory policies impact their business. The case also…

Abstract

Learning outcomes

The case study helps students to understand how public-private partnership (PPP) airports runs their business, how regulatory policies impact their business. The case also explains why the Cochin International Airport business model is so unique compared to any airport in India.

Case overview/synopsis

In 2016, Airport Economic Regulatory Authority released a new tariff regime for Cochin International Airport Limited (CIAL).CIAL has undergone challenges because of the tariff changes (changes every five years), which were implemented in 2017. This has impacted their business model. The CFO of CIAL was under pressure to share the impacts with the shareholders and to provide a way forward for the business. Cochin International was known to be one of the cheapest aeronautical tariff charging airports. The case discusses the issues of a public utility when it is under a regulatory price regime. The case explains different regulatory mechanisms (single till: the whole commercial revenue is cross-subsidized). The case discusses issues regarding Cochin International Airport, which is a public utility under PPP mode. Since 2016, regulator has changed the price regulatory regime from light touch (no price regulation only monitoring) to hybrid till regulation (a percentage of commercial revenue is cross-subsidized). The case explains what made Cochin International Airport so unique. It explores the challenges because of the regulatory regime, how it affects Cochin airport’s strategy for business. How should the management of CIAL to act on the above issue? What will be the impact? Will they need to change their business models?

Complexity academic level

The case is basically focused on MBA level students who are in their final year. There are various MBA courses in which this can be taught, which can be infrastructure management, infrastructure regulation, domain courses such as airport management. The student should have basic knowledge of economics, public utility and business strategy. The case helps them understand the impact of regulation, the role of the regulator and its impact on business strategy.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 10 Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 16 August 2021

Jawaher Majdi Al Ahbabi and Syed Zamberi Ahmad

The teaching objectives of the case study will enable the students as follows: to recognise the challenges of information technology (IT) implementation in the health-care sector…

Abstract

Learning outcomes

The teaching objectives of the case study will enable the students as follows: to recognise the challenges of information technology (IT) implementation in the health-care sector associated with employee resistance, to apply the technology acceptance model for analysing the degree of employee resistance, to relate the utilisation of Kotter’s 8-step change management approach in successful IT implementation in the health-care sector and maintenance of employee productivity and to classify the leadership traits reflected by the leaders in training the 600 diverse employee population of Al-Ain hospital.

Case overview/synopsis

The case highlighted the predicament the government-owned Al-Ain City Hospital, United Arab Emirates, faced following the surge in the incidences of COVID-19 in the country in March 2020. The hospital management decided to initiate the work-from-home arrangement as a non-pharmaceutical intervention of handling the spread of the disease amongst its employees. Fatima Almur, the Information Technology Director in Al-Ain Hospital, asked the Application Support Manager, Aysha Shahwan, to deploy some IT tools significant for remote support to patient care within two weeks. Shahwan faced significant challenges in deploying the IT tools in two weeks given the diverse workforce, with the majority of them having limited knowledge in operating the tools, and hence, their apprehension in the usefulness of the tools. Besides, Shahwan had to deploy some advanced tools for easy and secured access to the electronic health record, telemedicine and telecommuting using mobile phones, tablets or PCs. The deployment of these advanced tools would be jeopardised by employee acceptance and consequent dwindling productivity. Considering the issue of employee acceptance of the change and their limited knowledge, Shahwan had, therefore, to develop training frameworks to boost the former’s perceived usefulness and ease-of-use of the IT tools. Will Shahwan successfully deploy the advanced IT tools to enable the hospital staff, including medical staff and departments, to ensure efficient patient care from a remote location? Will she be able to train the 600 employees across genders, ages and knowledge, use the IT tools and safeguard them from common software threats like email phishing and ransomware? Will the hospital be able to sustain its vision of quality patient care using advanced technologies through this new arrangement of remote support amidst the pandemic when patients are more?

Complexity academic level

Undergraduate business management.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 10: Public sector management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 16 August 2021

Raj V. Amonkar, Tuhin Sengupta and Debasis Patnaik

This case introduces the context of seaport logistics supply chain management with a focus on the issues of risk management in handling and transportation of dangerous goods (DG)…

Abstract

Learning outcomes

This case introduces the context of seaport logistics supply chain management with a focus on the issues of risk management in handling and transportation of dangerous goods (DG). The authors present the following learning objectives under the overarching framework of Bloom’s Taxonomy as follows: To understand the severity of handling and transportation of DG in the export supply chain context. To understand the relevance of multi-criteria decision-making in risk assessment. To apply Delphi Technique to appropriately explain the process of risk assessment in a supply-chain context.

Case overview/synopsis

It was midnight on December 21, 2020, and Nishadh Amonkar, Chief Executive Officer, Yorokobi, was still awake recollecting his telecon with Tushar Rane, the Head-Materials, Western Maharashtra site of Crop Life Pvt Ltd. The organization was developing and manufacturing pesticides and other specialty chemicals for its clients worldwide. As new and diverse products were being manufactured in the organization, transportation of the products was becoming challenging. The case highlights the need for a data driven risk assessment approach to manage supply chains that were prone to product driven risks such as the handling and transportation of DG.

Complexity academic level

This course is suitable at the Master of Business Administration level for the following courses: Supply Chain Management (Focus/Session: Supply Chain Risk Management), Logistics Management (Focus/Session: Risks in Logistics and Supply Chain), Research Methodology (Focus/Session: Application of Delphi Technique).

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 23 June 2021

Rima Mondal and Nivisha Singh

The learning outcomes of this paper are as follows: to understand the characteristics of a natural monopoly such as telecommunications sector and impact of “network externality”;…

Abstract

Learning outcomes

The learning outcomes of this paper are as follows: to understand the characteristics of a natural monopoly such as telecommunications sector and impact of “network externality”; to understand the role of a regulator in maintaining a balance between competition and consolidation of telecom sector; to understand the importance of first-mover advantage in telecom sector and coping mechanism of late entrants; to understand different pricing mechanisms of “natural monopolies” that can be adopted to remain profitable; to understand social cost of price floor in telecommunications sector.

Case overview/synopsis

Indian telecom sector is going through a downturn where most of the private sector telecom service providers have reported huge losses, failed to pay adjusted gross revenue (AGR) dues and reported decline in average revenue per user over a period of 3–4 years. Fierce competition in the sector leads to rock bottom calling and data charges. Bharti Airtel benefitted for being the first mover in terms of market share but with entry of JIO in 2016, the service providers have entered a price war. As a result, service providers have requested Mr. R.S. Sharma, Chairman of Telecom Regulatory Authority of India (TRAI) to come up with a floor on calling charges and requested the government for a bailout package. Currently, Mr. R.S. Sharma, Chairman TRAI is facing a dilemma whether to regulate and come up with a floor on calling and data charges or leave the sector for market correction. Mr. Sharma can also recommend to amend the definition of AGR. Telecommunications sector exhibit the characteristics of a natural monopoly where there is a need of a regulator to introduce “competition for the sector” and “competition in the sector.” In India, TRAI is the regulatory body responsible for introducing “competition for the sector” by auction and “competition in the sector” by deregulating calling and data charges, maintaining at least three private and one public service provider, decreasing “switching cost” of the customers, etc. The case deals with the issues of why there is a need of a regulator in natural monopolies, how different chairmen of TRAI have successfully introduced competition “for” and “in” the sector, and how Indian telecom sector went through a downturn? What should TRAI do to maintain competition in the sector?

Complexity academic level

The case deals with the issue of managing telecommunications sector (a natural monopoly) by a regulator in the context of India. The regulator had successfully introduced “competition in the sector” and “competition for the sector.” This led to sharp increase in subscriber base and decrease in calling and data charges. Presently, fierce competition in the sector has left the service providers cash crunched. The case deals with the dilemma faced by the chairman of the regulatory body in India on whether the regulator should come up with a price floor or market correction. Study level: MBA, Executive MBA.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 10: Public sector management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 21 May 2021

Abdul Rehman Shaikh and Asad Ali Qazi

To understand the strategic importance of location selection within the organization. To analyze the constraints in decision-making for selection of location. To analyze the…

Abstract

Learning outcomes

To understand the strategic importance of location selection within the organization. To analyze the constraints in decision-making for selection of location. To analyze the alternate options for a location selection. To understand the usage of the factor rating method.

Case overview/synopsis

Due to a countrywide anti-encroachment drive, Mr Mughal loses his shop. He had just received a notice that his shop including those of others near him was established on one of the amenity plots. The structure was declared as illegal and was to be demolished in 24 h. He had to vacate the shop and his display center to avoid the loss of his items. He along with other shop owners approached to Supreme Court of Pakistan (SCP) to stop this demolishing act and to prove that these shops belonged to them for decades and that they had already paid the price of shops at that time. However, the SCP rejected their appeal straightforward and the anti-encroachment drive was carried out. Now, Mr Mughal had to find out an alternate location to establish his display center and to resume his business operations.

Complexity academic level

Undergraduate.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 29 April 2021

María Elizabeth Arteaga

This case teaches participants to: identify evaluation feasibility criteria for project alternatives according to their typology (market, techniques, finances, environmental and…

Abstract

Learning outcomes

This case teaches participants to: identify evaluation feasibility criteria for project alternatives according to their typology (market, techniques, finances, environmental and social), starting from the analysis of the information available about them. Prepare a comparative project alternative evaluation table, applying good business analysis practices promoted by PMI® and other authors for selecting the most viable project option that will add the most value to the organization.

Case overview/synopsis

At the start of 2013, Acería Ecuatoriana, because of a million-dollar investment that had been started by its general manager, Pérez, increased its melting and steel production capacity from 100,000 tons per year to 220,000 tons per year. This implied a greater demand for industrial gases and require its main additional supplier to deliver. Demand increase caused Grupo Lindo Ecuador´s plant saturation, unit separation air 1. For this reason, Grupo Lindo Ecuador had to import considerable oxygen amounts and this increased its cost of production. This caused Cadena to seek the establishment of a strategic alliance with Acería Ecuatoriana, for the purpose of developing a project for gas production (oxygen, nitrogen and argon). In September of the same year, Nelson became interested but required to know the Grupo Lindo Ecuador project proposal before signing the strategic alliance.

Complexity academic level

The case is addressed to an audience made up of graduate students (graduation and Master’s Degree) who have managerial experience and would like to improve their project management empirical practices.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 16 March 2021

Rajkumari Mittal and Parul Sinha

Following are the learning outcomes: recognize the significance of project management as an integrated approach for managing projects in an unprecedented situation. Identify the…

Abstract

Learning outcomes

Following are the learning outcomes: recognize the significance of project management as an integrated approach for managing projects in an unprecedented situation. Identify the issues related to managing contemporary projects such as shorter product life cycles, changing customer preferences and last-minute risks. Evaluate the role of sub-domains of project management such as project prioritization, project negotiation, project portfolio system, project risk assessment and management and project stakeholder management.

Case overview/synopsis

It is the year 2020, and the entire world is struggling to cope up with the crisis caused by the corona virus (COVID-19) pandemic. Normal life has come to a standstill. All industries have realized the significance of developing innovative strategies to move to the new normal situation. This case describes the plight of TVR Cinemas, a business vertical of Tiya Group, which caters to the business of production and distribution of Bollywood and Hollywood movies in India. With the lock-down of the Indian subcontinent, the multiplex business is badly hurt. With new norms of sanitation, social distancing, and a ‘stay home stay safe policy’ the company has to devise new ways to sustain in the market. This case invites students to put themselves in the shoes of the company project manager, Mr. Ramchandani, to provide recommendations about deciding ways to release seven pipe-lined Bollywood movie projects, deciding on the appropriate over-the-top (OTT) partner for tie-ups, and devising strategic steps to recover the reputation of the company by launching an OTT platform themselves.

Complexity academic level

The case is useful for introducing basics of project management along with decision making for projects in an uncertain situation. This case can be used for the students of undergraduate/postgraduate/executive level across the modules of project management/project risk management and negotiation management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 3 December 2020

Dayashankar Maurya, Amit Kumar Srivastava and Sulagna Mukherjee

The central lesson to be learned from studying the case is to understand the challenges and constraints posed by contextual conditions in designing contracts in public–private…

Abstract

Learning outcomes

The central lesson to be learned from studying the case is to understand the challenges and constraints posed by contextual conditions in designing contracts in public–private partnerships (PPP) for financing and delivering health care in emerging economies such as India.

Case overview/synopsis

Perverse incentives, along with contextual conditions, led to extensive opportunistic behaviors among involved agencies, limiting the effectiveness of otherwise highly regarded innovative design of the program.

Complexity academic level

India’s “Rashtriya Swasthya Bima Yojana” or National Health Insurance Program, launched in 2007 provided free health insurance coverage to protect millions of low-income families from getting pushed into poverty due to catastrophic health-care expenditure. The program was implemented through a PPP using standardized contracts between multiple stakeholders from the public and private sector – insurance companies, hospitals, intermediaries, the provincial and federal government.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS: 10 Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 10 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 50 of 192