Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case…
Abstract
Learning outcomes
The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case study context (C5); and to synthesise a group plan to solve issue(s) within specific case study context (A4).
Case overview/synopsis
In 2017, China proclaimed that it would no longer accept plastic waste for recycling, this was in-line with China’s Operation “National Sword” to review the quality of these plastic imports to ensure their recyclability. This sent shock waves through a now globalised recycling network, with China previously having imported 95% of the EUs and 70% of US plastics that had been collected for recycling. This plastic backlog was then diverted to South-East Asian nations, particularly Malaysia, which this case focuses the discussion upon. While the potential for significant economic benefits drew the attention of illegitimate and unscrupulous businessmen alike, the environmental degradation from the often, low technological recycling processes and even burning of low-grade plastics brought profound negative impacts. This case focuses upon, then Minister, Yeo Bee Yin who led the Ministry of Energy, Science, Technology, Environment and Climate Change, in which she took an active and aggressive stance in attempt to stop Malaysia becoming the dumping ground for the global plastic crisis.
Complexity academic level
This case is appropriate for final year undergraduate and any postgraduate degrees in Business.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 4: Environmental Management.
Details
Keywords
Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali
The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…
Abstract
Learning outcomes
The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.
Case overview/synopsis
Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.
Complexity academic level
The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 7: Management Science.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…
Abstract
Learning outcomes
The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.
Case overview/synopsis
The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.
Complexity academic level
This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh
After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…
Abstract
Learning outcomes
After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.
Case overview/synopsis
In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.
Complexity academic level
The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Hemverna Dwivedi, Rohit Kushwaha and Pradeep Joshi
This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the…
Abstract
Learning outcomes
This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the growth strategy of a sustainable brand, as it delineates the challenges faced by a woman ecopreneur. In response to these causative conundrums, the incumbent would be able to develop an understanding on the evolving landscape in context to the association between meeting consumer expectations, brand positioning and its channelization towards growth and revenue generation. Furthermore, the learners will be able to analyse the stages of product life cycle of a sustainable product and recommend an effective strategic plan to meet the consumer expectations and achieve desired growth by the application of Kano model.
Case overview/synopsis
Thenga was a home-grown brand from Kerala (God’s own country) founded by Maria Kuriakose, a native of Kerala in 2019. Unlike other brands, which were using coconut as a source of flesh, water and oil, Kuriakose came up with an idea of using the tossed shells of coconuts which eventually used to end up at landfills. These shells were crafted into aesthetics by the team of Thenga while adhering to the zero-waste policy. The brand gained momentum with the overwhelming positive response from the natives of Kerala and carved a way across the boundaries of Kerala, gradually reaching to every corner of India. Kuriakose thought of scaling the brand in the international boundaries as well. Within no time, the brand was a success. However, over the time, the brand was confronted with two broad dilemmas. First, non-uniformity in the sizes of the products, especially in bulk orders where maintaining uniformity was essential. The customers complained that there was no uniformity in the size of the products because for gifting purposes, they wanted all the products to look alike. And second, selecting the stringent quality shells because the ones exposed to sun for a very long time were not ideal for crafting the products due to the cracking of the shells, thereby affecting their durability. It became difficult addressing to these complex issues because the shells were nature’s creations. These issues were very different from the managerial dilemmas. Would the perspectives of management provide a solution? Kuriakose had to find a way out in the long term for the survival of the brand especially during its growth phase.
Complexity academic level
The case study is relevant for students in disciplines of entrepreneurship, green marketing, brand management, corporate social responsibility and strategy. It is designed for advanced MBA/PGDM and capstone courses. The case study also addresses the elements of customers’ perceptions towards innovative products and can be used as an addition for marketing courses dealing with strategies to improve the awareness and adoption of sustainable products.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 4: Environmental management.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…
Abstract
Learning outcomes
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.
Case overview/synopsis
In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.
Complexity academic level
The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS2: Built environment
Details
Keywords
Tianjun Feng, Chunyi Zhang and Lin Quan
Shanghai ANE Logistics Co., Ltd., established on June 1, 2010, is a business of road part-load logistics for goods from 5 to 300 kilograms. Mr. Wang Yongjun and his management…
Abstract
Shanghai ANE Logistics Co., Ltd., established on June 1, 2010, is a business of road part-load logistics for goods from 5 to 300 kilograms. Mr. Wang Yongjun and his management team have spent five consecutive years building ANE into the biggest part-load franchising network in China, and set up a brand new business model, through integration of traditional transport lines, part-load express network and information technology platform.
Xiangfeng Chen, Chuanjun Liu and Zhaolong Yang
In China, supply chain finance (SCF) has gradually emerged as a new service for the retail industry. This case systematically discusses how JD conducts product design and risk…
Abstract
In China, supply chain finance (SCF) has gradually emerged as a new service for the retail industry. This case systematically discusses how JD conducts product design and risk control of supply chain finance and related financial services, and analyze the impact of supply chain finance on JD's retail operations. The case also analyzes the relationship between JD supply chain finance and traditional financial institutions, and explore the future development of retail supply chain finance.
Tianjun Feng, Chunyi Zhang and Jiani He
Established in 2010, Mellower Coffee has 40 exquisite chain stores and three branches, namely Mellower Coffee Sales, Mellower Business Management and Shanghai Mellower Roasting…
Abstract
Established in 2010, Mellower Coffee has 40 exquisite chain stores and three branches, namely Mellower Coffee Sales, Mellower Business Management and Shanghai Mellower Roasting Factory. Positioned as a premium coffee brand in China, Mellower Coffee has realized the integrated operation and management of the whole industrial chain from raw coffee trade, roasting factory, coffee retail products, specialty coffee chain, office coffee to coffee academy. It has a vision to attract and cultivate more and more coffee lovers by constant innovation coffee culture promotion.
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business