Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 42
Applied filters:
Built Environment
Public Sector Management
Indian Institute of Management, Ahmedabad
The Case for Women
The CASE Journal
Emerging Markets Case Studies
Clear all
Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 15 April 2024

Irfan Saleem, Muhammad Ashfaq and Shajara Ul-Durar

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict management styles of a female leader; and comprehend the organizational change process to devise an effective communication strategy.

Case overview/synopsis

Ever-changing business demands managers adopt organizational change in leadership styles, business processes, updated skill sets and minds. One must be ready to understand influential nurtured corporate culture and human resource resistance towards the inevitable change. This case study attempted to discuss the female protagonist dealing with an organizational conflict. The case study introduces one such protagonist from a century-old woman’s educational institution. Subsequently, this case study presents organizational change under the leadership of a female protagonist. This teaching case study gives the reader an insight into situational leadership, conflict management styles and the corporate change process by implementing an appropriate communication strategy. This case study describes the change process through the various decision-making scenarios that an academic institute over a century old faced during the post-pandemic crisis after adding a crucial protagonist. The employee union, followed by students and administrative employees, has challenged the dominating leadership position held by the college principal. Protests occurred due to the college administrator’s refusal to adjust her approach to leadership. This teaching case then provided different leadership styles of the current and old leaders. Finally, the case study lists the challenges a leader faces during turbulent times and the lessons a leader should learn from such situations while transforming the institute.

Complexity academic level

The teaching case benefits undergraduate students in business management subjects such as conflict management, leadership and organizational behaviour. Nevertheless, trainers can use this case study to teach seasoned managers and emerging leaders the significance of adopting and implementing change while understanding situational leadership.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 24 November 2023

Eduardo Russo and Ariane Roder Figueira

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of…

Abstract

Learning outcomes

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of the main biases that affect making decisions in environments of high uncertainty; and build and apply judgment models to support decision-making processes.

Case overview/synopsis

Motivated by recent international events responsible for causing supply shock and great volatility in the price of imported fertilizers, Brazil, which in 2022 was responsible for producing only 15% of all the fertilizer consumed by its agribusiness, ran against time by launching a new national fertilizer plan (PNF). The plan proposed to boost Brazil’s national fertilizer industry to fulfil a long-term vision of reducing the country’s external dependence by 2050. While awaiting the first results of the PNF, this case study casts the student participants in the role of Breno Castelães, chief advisor of the special secretariat for strategic affairs of the presidency of the republic, whose role is to recommend the country’s position in the face of external pressures to adopt international embargoes of Russian fertilizers because of its war with Ukraine.

Complexity academic level

This case study is suitable for undergraduate and graduate students of business administration and public management courses who want to deal with topics such as public policy, judgment and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 10: Public sector management.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 14 September 2023

Arpita Agnihotri and Saurabh Bhattacharya

Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for…

Abstract

Social implications

Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for resolving the digital divide in Africa and offered a collaborative solution. The case also suggests how female CEOs invest in strategic corporate social responsibility (CSR) that could create a competitive advantage for firms. The case also discusses gender diversity issues in the science, technology, engineering and math (STEM) field and how Vodafone Ghana’s CEO tried to enhance gender diversity in the telecommunication sector and Vodafone. Obo-Nai did not emphasize gender diversity from a CSR perspective but believed in a business case for gender diversity, as an increase in participation of women in the STEM workforce could help the telecommunication sector innovate faster and resolve the digital divide challenge while also empowering women working from the informal sector.

Learning outcomes

What is the significance of a digital divide and the societal role of the telecommunication sector; Why female CEOs are more concerned about CSR and how CSR makes not charity but business case; Why female CEOs are more inclined toward collaborative strategies and how stakeholders are involved in collaborative strategies for reducing the digital divide; Exploring various strategies for enhancing gender diversity in the STEM field and the significance of gender diversity in the STEM field.

Case overview/synopsis

The case is about the challenges faced by Patricia Obo-Nai, the first female CEO of Vodafone Ghana, to bridge the digital divide in Africa while doing so in a profitable manner. Obo-Nai was an engineer by profession and won several awards as she rose to the post of CEO in Vodafone Ghana in 2019. During the COVID-19 pandemic, she took several corporate social responsibility (CSR) initiatives, such as making internet service freely available in certain schools and universities so that education could continue. Obo-Nai also emphasized gender diversity within Vodafone and urged other telecommunication players to focus on gender diversity from a social responsibility perspective because it was essential for innovation. Under Obo-Nai’s leadership, Vodafone itself launched several new products. She called for a multistakeholder collaborative approach to bridge the digital divide and to make 4G internet affordable in Africa. Obo-Nai collaborated with competitors like MTN Ghana to enhance Vodafone Ghana’s roaming services.

Complexity academic level

This case is intended for undergraduate or graduate-level business and management courses, especially international business and society, CSR and leadership courses. Graduate students in public policy may also find the case compelling.

Supplementary materials

Teaching notes are available for educators only.

Subject codes

CCS5: International Business; CCS10: Public Sector Management

Details

The Case For Women, vol. no.
Type: Case Study
ISSN: 2732-4443

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 24 November 2022

Swapnil Garg

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish…

Abstract

Learning outcomes

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish between operational and strategic levers of a turnaround strategy; ■ analyze and evaluate past and present turnarounds from a sustainability perspective; and ■ formulate managerial actions to make turnaround sustainable.

Case overview/synopsis

Braithwaite Company Ltd. (Braithwaite) was a specialized engineering firm headquartered in Kolkatta, India. It primarily undertook structural steel fabrication to make railway wagons and bridge structures. It was incorporated as a private enterprise almost a century back. However, since its nationalization five decades ago, it has been operating as a public sector undertaking (PSU) under the aegis of Indian Railways, a department of the Government of India. The case documents the past three decades of the firm’s journey, during which it experienced three episodic turnarounds. Details of the first two turnarounds are presented as the background, in light of which sustainability of the third turnaround is to be examined. The case explores the sustainability of organizational turnarounds from the perspective of the current Chairman and Managing Director (CMD), the case protagonist. Braithwaite underwent financial and operational distress in 1992, 2005 and 2015 and negotiated them under different leaders. These leaders from diverse backgrounds used distinct tactics and strategies to bring about organizational turnarounds. The case provides data and information to assess the sustainability of the third turnaround. Hence, it allows a class to explore the paradoxical observation that while “turnaround” inherently implies sustenance of good performance over time, turnaround sustainability is not spontaneous in the real world. The case deals with the performance issues of PSUs, which make significant contributions to the national economy in the case of emerging economies (for example, 5%–8% of the Indian National gross domestic product is contributed by PSUs; https://swarajyamag.com/ideas/psus-are-crucial-for-indias-growth-but-only-if-they-play-a-strategic-role). Under government ownership and management, the poor performance of PSUs is often attributed to bad decision-making by its top management. In contrast, Braithwaite’s top management’s sound contextual decision-making resulted in a jump in its performance during each turnaround phase, but unsound fundamentals resulted in the unsustainability of the turnarounds. Hence, the case enables an exploration of the unique challenges faced by PSU that emanate from legacy roles, monopolistic markets and dual purpose – the concurrent pursuit of profits and social welfare. Consequently, the case allows an examination of the reasons for the distress of PSUs and the viability of turnaround strategies in the context of the broader Business–Government–Society landscape in emerging economies.

Complexity academic level

The case is written for use in the MBA elective course covering “Strategic Revival and Turnaround Strategies.” It can be used at the beginning of the course to identify reasons for organizational failure/distress or in the later part of the course to discuss the implementation of operational and strategic turnaround strategies.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 15 November 2022

Anupam Saxena, Shalini Nath Tripathi and Swadesh Kumar Singh

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an…

Abstract

Learning outcomes

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an opportunity;▪ importance of service excellence and customer satisfaction through customer delight and customer feedback; and▪ utilisation of resources and excellent time management strategies.

Case overview/synopsis

This case discusses how vital teamwork and motivated leadership can convert a crisis such as Covid-19 into an opportunity. This case study talks about Uttar Pradesh Metro Rail Corporation (UPMRC), a metro rail corporation working to develop metro trains in the Indian state of Uttar Pradesh. The case discusses how challenging it was for the metro rail corporation to transform its processes in a short period and deal with the crisis on major fronts such as facilities maintenance, human resource management, ensuring safety and security of its staff and riders, motivation of staff, service quality and maintaining all operational aspects. The case discusses how UPMRC is a leader on all fronts and has excelled in its operational work. It talks about what challenges the lockdown and unlocking phase posed in front of the leadership and how teamwork, dedication to exemplary service quality and customer satisfaction gave the team the strength to make changes that improved their processes and helped them overcome the crisis.The case starts with a discussion of metro rail inception and incorporation of UPMRC and then how this newly formed metro has to face the challenges of pre-lockdown period where the team worked very hard for sanitisation and safety. The lockdown created a completely different set of challenges related to the facilities and the entire metro train systems, which was a difficult situation to deal because of restrictions and other challenges. However, the team dealt with situations with strength and strategic planning, leading to better managed processes and staff. The unlocking phase also gave many challenges that the team handled with a lot of care and efficiency.

Complexity academic level

This case is suitable for post-graduate-level courses on services marketing, service operations management, general management, crisis management and strategic management. Participants can use the case to develop an understanding of strategic planning and management.This case can also be used in the executive education program for managers to encourage them to think through challenges faced by metro rail corporations.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 28 March 2022

Arvind Shroff and Bhavin J. Shah

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its…

Abstract

Learning outcomes

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its initiative is an apt example of the wonder which preventive care can bring in the context of rural health. Community participation: The case can be instrumental in showing the pathway to encourage community involvement in mainstream health by promoting the holistic model of SSSSH that understands mothers and children's health profile and needs, especially in the unreached rural segments of an emerging economy like India. Importance of healthy childhood: World Health Organization (WHO) promotes the school health programme to prevent health risks among children by inculcating healthy behaviours during childhood. The successful SSSSH model proves that it is implementable by integrating comprehensive health education modules in the existing institutions for medical care.

Case overview/synopsis

The challenge of a healthy childhood is inadequate availability and accessibility of quality care. Non-awareness of the parents is also a significant reason for the children who miss the benefit of a happy childhood. While much is planned by the Government and some part of it being executed, this case highlights the effectiveness of the maternal and child health programme executed by the Sri Sathya Sai Sanjeevani Hospital (SSSSH). This initiative fulfills the dire need of ensuring the preventive healthcare component leading to safe motherhood and safe birth of healthy children. Further, the case is also the culmination of pin-pointed innovative awareness activities such as school health screening and the Divine Mother and Child Health Program (DMCHP). It opens up the discussion on the current model of health care followed by SSSSH, Raipur, and its impact in the local areas to decide on its expansion across the country for nationwide implementation.

Complexity academic level

Bachelors in Business Administration, MBA, Executive MBA, Post Graduate Diploma in Healthcare Management

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 10 of 42