Search results
1 – 10 of 19Francine van Tonder and P.D. Rwelamila
One of the greatest challenges faced by the 1994 post-apartheid government in South Africa is the housing problem that has persisted for almost 30 years into democracy. Innovation…
Abstract
Purpose
One of the greatest challenges faced by the 1994 post-apartheid government in South Africa is the housing problem that has persisted for almost 30 years into democracy. Innovation in research and practice is required to address this problem. This paper aims to discuss the aforementioned objective.
Design/methodology/approach
This paper presents an argument for housing knowledge management as one part of a much larger system of housing provision and critically compares information variations on one hypothetical, low-cost housing unit adapted for varying climatic regions. It aims to enquire if there is an overlap in information.
Findings
The findings do confirm a noteworthy overlap in the information of the varying units. Therefore, knowledge management of the information would prove effective and may contribute in part to housing provision.
Research limitations/implications
The study is limited to assessing the information changes made to the contract documentation of the housing unit.
Social implications
The paper argues that knowledge management of this overlapping information could impact housing provision by providing knowledge power to those affected by the housing problem.
Originality/value
The findings are a unique perspective presented through a knowledge management lens. In addition, the said knowledge management lens provides a platform to raise additional questions. When seeking answers to these questions, it is expected that research sub-themes would be identified focussing further research studies towards finding answers.
Details
Keywords
Liyang Wang, Yanfang Sun and Robert L.K. Tiong
This study aims to explore how institutional quality impacts private capital participation in large-scale infrastructure development, particularly in public–private partnership…
Abstract
Purpose
This study aims to explore how institutional quality impacts private capital participation in large-scale infrastructure development, particularly in public–private partnership (PPP) projects, aiming to enhance incentives for private sector involvement.
Design/methodology/approach
Building on new institutional theory, a triangular theoretical framework was constructed to analyze the high participation of private capital in PPP projects, focusing on seven key institutional factors. Data from 1,319 PPP projects across 36 Belt and Road Initiative (BRI) countries from 2015 to 2020 were then analyzed using a combination of necessary condition analysis (NCA) and fuzzy set qualitative comparative analysis (fsQCA) to evaluate the combined impact and interactions of these factors.
Findings
Results indicate that high private capital participation does not hinge on a single institutional quality factor but results from the synergistic influence of multiple factors. The paths leading to high private capital participation can be categorized as regulatory-led, normative-cognitive synergistic, regulatory-normative synergistic and institutional failure-led. Among these, regulatory quality plays a central role in the regulatory-led; the synergy between political stability and voice and accountability is pivotal in the normative-cognitive synergistic, and the rule of law, in combination with voice and accountability, is essential to the regulatory-normative synergistic.
Originality/value
This research systematically examines the multidimensional impact of institutional quality, revealing how different institutional factors interact to influence private capital’s willingness to participate and behavior. It enriches applied research in institutional economics within PPP projects and provides a new theoretical perspective and methodological framework to the scholarly community.
Details
Keywords
Suhair Alkilani and Martin Loosemore
This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project…
Abstract
Purpose
This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project performance from the perspective of small and medium contractors in the Jordanian construction industry.
Design/methodology/approach
An anonymous structured survey was performed comprising 200 key informants including senior project managers, construction managers, engineers and general managers working for small- and medium-sized contractors in the Jordanian construction industry. The Partial Least Squares Structural Equation Modelling (PLS-SEM) was used to analyse the data.
Findings
The results of this study show that consultant-related factors (quality of documentation produced, ability to communicate and technical competencies) are perceived to have the most significant direct effect on project performance, followed by client-related factors (payment promptness, decision certainty and documentation control) and supplier-related factors (supplier performance, defects control and logistics management).
Originality/value
The results contribute new theoretical, empirical and practical insights to existing construction project performance research by highlighting the key performance factors which need to be managed for each stakeholder group to ensure effective project performance from a small- and medium-sized contractor perspective.
Details
Keywords
Anthony Olukayode Yusuf, Akintayo Opawole, Nofiu Abiodun Musa, Dele Samuel Kadiri and Esther Ilori Ebunoluwa
This study examined factors influencing the organisational capabilities of the public sector for building information modelling (BIM) implementation in construction projects with…
Abstract
Purpose
This study examined factors influencing the organisational capabilities of the public sector for building information modelling (BIM) implementation in construction projects with a view to enhancing the performance of public sector projects.
Design/methodology/approach
The study adopted a quantitative descriptive analysis that was based on primary data. In total, 198 valid questionnaires obtained from construction professionals within the public sector provided primary quantitative data for the assessment. The respondents provided the responses on the factors which were identified through an in-depth synthesis of literature relating to organisational capabilities of the public sector. Data collected were analysed using descriptive and inferential statistics.
Findings
The findings established that the potential of the public sector to deploy BIM in construction projects is greatly influenced by varying degree of organisational capability attributes with bureaucratic culture (mean score, MS = 3.37), structural complexity (MS = 3.17), lack of skilled and trained staff (MS = 3.12), personnel stability (MS = 3.11), staff cooperation (MS = 3.09) and political constraint (MS = 3.07) ranked highest. Through factor analysis, these and other highly influential factors were grouped into eight components, namely management-related, policy-related, technical-related, attitude-related, work structure-related, work ethic-related, decision-related and feedback-related factors. This grouping reflects the various components of organisational capability attributes which the public sector needs to efficiently develop to benefit from project management paradigm introduced by BIM.
Practical implications
This study provided information for improving specific capability attributes with respect to human and technical resources as well as other soft infrastructure to support BIM implementation on building projects by the public sector client. The study also serves as a guide for understanding BIM implementation by the public sector in similar socio-political and economic contexts.
Originality/value
This assessment indicates various degrees by which the organisational attributes of public sector have influenced the attributes' capability to implement BIM on construction projects. Thus, findings provide information on areas of improvement for better implementation of BIM by the public sector in project delivery.
Details
Keywords
This study aims to establish marketing practices which predict business performance of architecture firms within the Nigerian Construction Industry (NCI) to address the sustained…
Abstract
Purpose
This study aims to establish marketing practices which predict business performance of architecture firms within the Nigerian Construction Industry (NCI) to address the sustained poor business performance of firms, which affects allied professionals as many projects in the built environment depend on design proposals from architects.
Design/methodology/approach
Survey responses from 86 firms were used to model business performance measured as total revenue of the firms from 40 commonly deployed marketing practices in construction.
Findings
Two-thirds of the marketing practices most used by architectural firms were ineffective in predicting business performance. The model also explains up to half the variance in business performance (37.4–49.9%), supporting the view that marketing in the CI affects business performance. Researching client needs and competitors emerged as the only significant positive predictor of business performance (β = 0.827, p = 0.043). Using social media (β = −1.247, p = 0.004), regular participation in awards/competitions (β = −1.420, p = 0.013) and inclusion of political offers in bids (β = −1.050, p = 0.016) negatively predicted business performance.
Practical implications
Architecture and allied professional bodies in Nigeria need to rethink existing restrictions regarding marketing based on traditional code of ethics in light of present-day realities of digital and internet business environments. Principals and management of architecture firms require a paradigm shift in deploying the appropriate marketing practices, especially as it relates to research regarding changing client expectations and current competition within the NCI.
Originality/value
The study established marketing practices which model business performance and demonstrate their value in a framework for improving the financial sustainability of architecture firms within the NCI.
Details
Keywords
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…
Abstract
Purpose
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.
Design/methodology/approach
This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.
Findings
The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.
Research limitations/implications
The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.
Practical implications
The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.
Originality/value
The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.
Details
Keywords
Scholars have been sounding the alarm of novice teacher turnover crises for decades. South Africa is soon to be facing an educational catastrophe because of a shortage of…
Abstract
Purpose
Scholars have been sounding the alarm of novice teacher turnover crises for decades. South Africa is soon to be facing an educational catastrophe because of a shortage of experienced teachers. Globally and in South Africa, novice teacher attrition is high, and teachers entering the classroom often described feeling isolated and unsupported.
Design/methodology/approach
This qualitative study was underpinned by an interpretative phenomenology approach. The author reviewed the literature and newly emerged findings of novice teacher mentoring support needs through the theoretical lens of the Ubuntu philosophy “I am because we are” which emphasises the importance of interconnectedness and community. Using semi-structured interviews, this study aimed to explore novice teacher mentoring needs from an Ubuntu perspective.
Findings
Novice teachers report feeling overwhelmed with the complexities of teaching in their early careers and express the desire to be formally mentored by a knowledgeable “elder” teacher. This paper argues that a competent mentor who values Ubuntu in their mentoring could offer collaboration, respect, compassion and support to novices that may keep them in the profession. This paper further explores the potential benefit of a prescribed Ubuntu-orientated mentoring programme to formalise mentoring for novices. In addition, it explores the school micro-community from the Ubuntu principles to support novices.
Originality/value
While there is a plethora of studies about mentoring novice teachers, literature from an Africanised Ubuntu perspective is scarce. Perhaps the time has come to find African solutions to our African problems.
Details
Keywords
Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…
Abstract
Purpose
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.
Design/methodology/approach
A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.
Findings
Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.
Practical implications
The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.
Originality/value
Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.
Details
Keywords
Rogers Mwesigwa, Gonzaga Basulira, Joseph Mayengo and Jude Thadeo Mugarura
This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.
Abstract
Purpose
This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.
Design/methodology/approach
This study adopted a cross-sectional and quantitative approach. Data were collected using a questionnaire from 42 PPP projects in Uganda.
Findings
The study found that community engagement and commitment are all positively and significantly associated with the sustainability of PPP projects in Uganda. Results also show that community commitment mediates community engagement and project sustainability.
Research limitations/implications
The study results imply that for sustainability to be achieved, communities must be engaged in project activities such as planning, design and implementation to boost their commitment to project sustainability.
Originality/value
The sustainability of PPP projects is an emerging phenomenon. This paper contributes to scanty literature on ensuring the sustainability of PPP projects from a developing country’s perspective.
Details
Keywords
Apoorva Dandinashivara Krishnamurthy and Gangadhar Mahesh
In the context of an absence of studies examining the interrelationship between Indian construction industry and residential real estate sector, the study aims to develop and test…
Abstract
Purpose
In the context of an absence of studies examining the interrelationship between Indian construction industry and residential real estate sector, the study aims to develop and test a conceptual framework to stimulate construction industry through optimisation of housing market in India. The developed conceptual framework lays down a blueprint to assess the interaction between construction industry and housing market in other countries.
Design/methodology/approach
Means of stimulation of construction industry by residential real estate sector were identified. Housing market was examined to identify factors constituting consumer-centric delivery and consumer-empowered demand. Supply side of housing market was probed to identify underlying factors stifling housing delivery. The identified factors were put together to form the conceptual framework. A questionnaire was developed and administered to the delivery-side stakeholders of housing market.
Findings
The study demonstrates significant correlations between real estate investment-led construction industry output stimulation and consumer-centric residential real estate delivery. The deterrents to consumer-centric housing delivery have been ascertained to be having an impact on time, cost and scope of housing projects. Significant correlations have been ascertained between the deterrents. On the demand-side, skills, awareness and engagement of consumers are strongly correlated with each other. Affordability of housing is rightfully correlated with all the three means of stimulation of construction industry output.
Originality/value
Specific to the Indian context, the study presents and validates a novel conceptual framework aimed at stimulation of construction industry output through interventions in housing market.
Details