Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

51 – 60 of 421
Applied filters:
Built Environment
Environmental Management
Management Science
Operations and Logistics
Public Sector Management
Tourism and Hospitality
Clear all
Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 16 December 2022

Peeyush Pandey, Patel Jinil Ashvinbhai, Yushmita Singh, Tania Mittal, Ishank Goel, Bharat Kumar Mehta and Sayali Tapas

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants…

Abstract

Learning outcomes

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants will learn the application of the factor loading method and aggregate planning.

Case overview/synopsis

This case revolves around the Modi Agro Pvt. Ltd, a mango procurement and distribution business established in 1994 by Mr Dhanush Modi in Mumbai, India. Mr Mahendra Modi, son of the company owner, observed that the different seasons of cultivation and varied customer demands lead to changing workforce requirements during the procurement process. In addition, the production quality, variety, available resources, procurement location and cost play a significant role in establishing a long-term relationship with the customers. This case highlights the problem faced by Mahendra in determining an appropriate location among all available options for mango procurement and the optimal workforce for each month to meet the varying customers’ demands.

Complexity academic level

The case can be used as teaching material for participants of the course Service Operations Management, Operations Management, Decision Analysis and Quantitative Techniques

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Case study
Publication date: 12 December 2022

Archit Vinod Tapar, Deepika Jain and Archana Patro

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with…

Abstract

Learning outcomes

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with various stakeholders in the supply chain in increasing efficiency and effectiveness; and to comprehend the challenges in the implementation of technology in SCM.

Case overview/synopsis

This case study presents Haryana’s challenges in implementing the digitization of the supply of food grains to the public. Mr Srinivas, a consultant to the Department of Food and Public Distribution, is required to suggest the future roadmap while accounting for the challenges faced in the digitization of the distribution of grains to the public in the state of Haryana. The students are expected to use the information given in the case and exhibits to discuss and critically think about the various stakeholders involved when change initiatives are implemented on an organizational level and recommend solutions based on the voices of various internal stakeholders.

Complexity academic level

Postgraduate/Masters in Business Administration/Masters in Management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 24 November 2022

Swapnil Garg

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish…

Abstract

Learning outcomes

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish between operational and strategic levers of a turnaround strategy; ■ analyze and evaluate past and present turnarounds from a sustainability perspective; and ■ formulate managerial actions to make turnaround sustainable.

Case overview/synopsis

Braithwaite Company Ltd. (Braithwaite) was a specialized engineering firm headquartered in Kolkatta, India. It primarily undertook structural steel fabrication to make railway wagons and bridge structures. It was incorporated as a private enterprise almost a century back. However, since its nationalization five decades ago, it has been operating as a public sector undertaking (PSU) under the aegis of Indian Railways, a department of the Government of India. The case documents the past three decades of the firm’s journey, during which it experienced three episodic turnarounds. Details of the first two turnarounds are presented as the background, in light of which sustainability of the third turnaround is to be examined. The case explores the sustainability of organizational turnarounds from the perspective of the current Chairman and Managing Director (CMD), the case protagonist. Braithwaite underwent financial and operational distress in 1992, 2005 and 2015 and negotiated them under different leaders. These leaders from diverse backgrounds used distinct tactics and strategies to bring about organizational turnarounds. The case provides data and information to assess the sustainability of the third turnaround. Hence, it allows a class to explore the paradoxical observation that while “turnaround” inherently implies sustenance of good performance over time, turnaround sustainability is not spontaneous in the real world. The case deals with the performance issues of PSUs, which make significant contributions to the national economy in the case of emerging economies (for example, 5%–8% of the Indian National gross domestic product is contributed by PSUs; https://swarajyamag.com/ideas/psus-are-crucial-for-indias-growth-but-only-if-they-play-a-strategic-role). Under government ownership and management, the poor performance of PSUs is often attributed to bad decision-making by its top management. In contrast, Braithwaite’s top management’s sound contextual decision-making resulted in a jump in its performance during each turnaround phase, but unsound fundamentals resulted in the unsustainability of the turnarounds. Hence, the case enables an exploration of the unique challenges faced by PSU that emanate from legacy roles, monopolistic markets and dual purpose – the concurrent pursuit of profits and social welfare. Consequently, the case allows an examination of the reasons for the distress of PSUs and the viability of turnaround strategies in the context of the broader Business–Government–Society landscape in emerging economies.

Complexity academic level

The case is written for use in the MBA elective course covering “Strategic Revival and Turnaround Strategies.” It can be used at the beginning of the course to identify reasons for organizational failure/distress or in the later part of the course to discuss the implementation of operational and strategic turnaround strategies.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 15 November 2022

Anupam Saxena, Shalini Nath Tripathi and Swadesh Kumar Singh

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an…

Abstract

Learning outcomes

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an opportunity;▪ importance of service excellence and customer satisfaction through customer delight and customer feedback; and▪ utilisation of resources and excellent time management strategies.

Case overview/synopsis

This case discusses how vital teamwork and motivated leadership can convert a crisis such as Covid-19 into an opportunity. This case study talks about Uttar Pradesh Metro Rail Corporation (UPMRC), a metro rail corporation working to develop metro trains in the Indian state of Uttar Pradesh. The case discusses how challenging it was for the metro rail corporation to transform its processes in a short period and deal with the crisis on major fronts such as facilities maintenance, human resource management, ensuring safety and security of its staff and riders, motivation of staff, service quality and maintaining all operational aspects. The case discusses how UPMRC is a leader on all fronts and has excelled in its operational work. It talks about what challenges the lockdown and unlocking phase posed in front of the leadership and how teamwork, dedication to exemplary service quality and customer satisfaction gave the team the strength to make changes that improved their processes and helped them overcome the crisis.The case starts with a discussion of metro rail inception and incorporation of UPMRC and then how this newly formed metro has to face the challenges of pre-lockdown period where the team worked very hard for sanitisation and safety. The lockdown created a completely different set of challenges related to the facilities and the entire metro train systems, which was a difficult situation to deal because of restrictions and other challenges. However, the team dealt with situations with strength and strategic planning, leading to better managed processes and staff. The unlocking phase also gave many challenges that the team handled with a lot of care and efficiency.

Complexity academic level

This case is suitable for post-graduate-level courses on services marketing, service operations management, general management, crisis management and strategic management. Participants can use the case to develop an understanding of strategic planning and management.This case can also be used in the executive education program for managers to encourage them to think through challenges faced by metro rail corporations.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 31 October 2022

Eduard Maltsev and Tetiana Kuznietsova

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and…

Abstract

Learning outcomes

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and the organization. Students understand the value of working with different stakeholders (partners, headquarters). Students can analyze the role of focusing on a client and apply client-centric way of thinking. Students can apply the concept of the transformational idea to create (synthesize) possible solutions for the presented dilemma.

Case overview/synopsis

This case tells the transformation story of the logistics company Ekol Ukraine, which began in 2013. This company was the most successful branch of Ekol Logistics, an international corporation operating in 13 countries. From 2013 till 2021, Ekol Ukraine experienced a crisis related to the start of a conflict between Ukraine and Russian militants. It proved its ability to cope with challenges, gained almost complete autonomy from the head office, transformed the business model and culture and achieved considerable success in building an ecosystem.

Having this stage of transformation completed by 2021, the company reached a plateau and had to decide what the following changes would be. In 2021, only 14% of Ukrainian businesses used outsourcing logistics services (like the ones Ekol Ukraine provided). The remaining 86% had in-house logistics and were not ready to change the model. So, Ekol Ukraine faced a problem: how could a logistics provider grow in a market that was not mentally ready to outsource?

Complexity academic level

MBA programs.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

Case study
Publication date: 6 September 2022

Işık Özge Yumurtacı Hüseyinoğlu, Deniz Kurtay, İrem Aşar and Serra Dilmaç

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics…

Abstract

Learning outcomes

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics requirements almost halved the annual number of shipments and the time needed for operation and documentation activities. In addition, reduced carbon emissions made this an environmentally friendly transportation model, in line with trends in society.

Case overview/synopsis

The basis for this case study was the analysis of Whirlpool Turkey’s transportation system for materials used in the production of white goods. Data obtained through fieldwork and cooperation with company consultants showed that some suppliers have high annual logistics costs. This inefficiency causes time loss and increases the total distance traveled and thus carbon emissions. In the case study, the current application created inefficiency in cost and time management, and therefore, after determining the factors that increase costs, different transportation solutions were developed accordingly.

Complexity academic level

This case is particularly designed for undergraduates in the final semester of management courses that specialize in supply chain and operation management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 5 September 2022

Aasha Jayant Sharma and Swapnil Samant

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of…

Abstract

Learning outcomes

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of contingency planning and create what-if scenarios, to step by step guide students how to build a network contingency planning tool and to enable students to use tools such as solver to build up a dashboard with given information.

Case overview/synopsis

The case is about Godrej Commercial, a vertical of Godrej and Boyce that handles warehousing and transportation support to five verticals under the banner of Godrej operating pan India. How Godrej is trying to deal with COVID pandemic, what were their coping strategies and how contingency planning is done is what this case is all about. The main focus of this case is understanding how network contingency planning is done and what parameters should be considered. How a dashboard can be developed that can be used as a base for taking strategic decisions related to networking given the uncertainties due to COVID. The case gives hands on to students to use solver and build a dash board, plus gives a peep into Godrej and its operations.

Complexity academic level

This study is suitable for students of undergraduate or first year MBA level. Specifically, the case can be used in business strategies, operations and supply chain management courses.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 12 July 2022

Vineeta Dutta Roy

At the macro level, the case study enables the students to appreciate the complexity emerging market economies face in achieving economic development and environmental…

Abstract

Learning outcomes

At the macro level, the case study enables the students to appreciate the complexity emerging market economies face in achieving economic development and environmental sustainability without comprising each other. The students understand the importance of behavioural change and empowerment of communities in projects dealing with transformational social changes. Theoretically, the students learn about the change mechanisms and organisational practices market-based organisations install to drive their positive social change (PSC) projects. At the micro level, students learn about the process of setting up Mangalajodi Ecotourism Trust (MET) – that not only enthused the local community economically but also instilled it with awareness and motivation towards sustaining its ecosystem. Analytically, at macro level, it assists the students to have a lens of PSC framework to examine corporate social responsibility, social entrepreneurship and BoP strategies of market-based organisations to affect social change. Application/problem solving: The case study explains to the students how the PSC levers of motivation, capability and opportunity structures were applied by NatWest Bank during different phases of project execution. As management grapples with new problems, the students are encouraged to use the levers to recommend an action plan. It allows students to apply SWOT and think of competitive strategies for MET. It allows students to think of strategies that may apply for a better management of Ecotourism at Mangalajodi.

Case overview/synopsis

As part of its broader commitment to sustainable development and climate change action, the NatWest Group (formerly Royal Bank of Scotland Group) launched its Supporting Enterprise Programme in India in the year 2007. The project aimed at creating income-generating opportunities for indigenous and economically vulnerable sections of society living in critical natural ecosystems. The project was under the leadership of N. Sunil Kumar, a zealous nature lover, with over two decades of experience in business strategy and public affairs and a specialty in environmental sustainability. He headed Sustainable Banking at NatWest and was head of NatWest Foundation-India. The Mangalajodi project shared the problems many of NatWest’s other projects in India presented. Poor communities that relied solely on natural resources for their sustenance slid deeper into poverty as ecosystems degraded. Lacking alternative sources of livelihood and facing scantier resources, the communities helplessly caused additional damage to weak ecosystems when they drew on the resources even more vigorously. Poaching of migratory birds for supplemental income was a huge problem at Mangalajodi; it was not only rapidly altering the ecosystem to sustain the birds but also deteriorating and weakening its ecology as a whole. Measures to eliminate poaching were failing in the absence of alternate means of livelihoods and a strong incentive to protect the birds. MET was established under the project in 2009. A decade later, it had become a resounding success. A community-owned and run enterprise, MET was providing direct employment to over 100 poorest families at the tiny village and creating income-generating opportunities and entrepreneurial ventures for many others. Poaching was practically negligible at Mangalajodi, and the community was drawing huge admiration for its role in conserving the ecosystem. However, the progress of Mangalajodi Ecotourism was paradoxical, on the one hand; its popularity was rising but, on the other hand, it was becoming overcrowded and looked ill managed. Its rising commercial value was bringing in more land developers, builders and investors, but permanent concrete structures were also coming up quite unscrupulously. There were many challenges – how should growth of ecotourism at Mangalajodi be managed? What mechanisms and practices ensured that the community was empowered enough to participate in decisions of land use, infrastructure, energy and waste management at Mangalajodi? How should MET become more competitive and innovative to grow despite future challenges?

Complexity academic level

The case study is useful for students of Management at Under Graduate and Post Graduate Levels for understanding the following: the sustainability of fragile ecosystems; the community at the intersection of sustainable development and natural resources conservation and protection of biodiversity; knowing in detail about the planning, implementation and management of ecotourism projects; and decisions regarding community-based ecotourism projects.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 7: Management Science

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

51 – 60 of 421