Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

51 – 60 of 390
Applied filters:
Environmental Management
Management Science
Operations and Logistics
Public Sector Management
Tourism and Hospitality
Show teaching notes
Clear all
Case study
Publication date: 15 November 2022

Anupam Saxena, Shalini Nath Tripathi and Swadesh Kumar Singh

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an…

Abstract

Learning outcomes

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an opportunity;▪ importance of service excellence and customer satisfaction through customer delight and customer feedback; and▪ utilisation of resources and excellent time management strategies.

Case overview/synopsis

This case discusses how vital teamwork and motivated leadership can convert a crisis such as Covid-19 into an opportunity. This case study talks about Uttar Pradesh Metro Rail Corporation (UPMRC), a metro rail corporation working to develop metro trains in the Indian state of Uttar Pradesh. The case discusses how challenging it was for the metro rail corporation to transform its processes in a short period and deal with the crisis on major fronts such as facilities maintenance, human resource management, ensuring safety and security of its staff and riders, motivation of staff, service quality and maintaining all operational aspects. The case discusses how UPMRC is a leader on all fronts and has excelled in its operational work. It talks about what challenges the lockdown and unlocking phase posed in front of the leadership and how teamwork, dedication to exemplary service quality and customer satisfaction gave the team the strength to make changes that improved their processes and helped them overcome the crisis.The case starts with a discussion of metro rail inception and incorporation of UPMRC and then how this newly formed metro has to face the challenges of pre-lockdown period where the team worked very hard for sanitisation and safety. The lockdown created a completely different set of challenges related to the facilities and the entire metro train systems, which was a difficult situation to deal because of restrictions and other challenges. However, the team dealt with situations with strength and strategic planning, leading to better managed processes and staff. The unlocking phase also gave many challenges that the team handled with a lot of care and efficiency.

Complexity academic level

This case is suitable for post-graduate-level courses on services marketing, service operations management, general management, crisis management and strategic management. Participants can use the case to develop an understanding of strategic planning and management.This case can also be used in the executive education program for managers to encourage them to think through challenges faced by metro rail corporations.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 31 October 2022

Eduard Maltsev and Tetiana Kuznietsova

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and…

Abstract

Learning outcomes

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and the organization. Students understand the value of working with different stakeholders (partners, headquarters). Students can analyze the role of focusing on a client and apply client-centric way of thinking. Students can apply the concept of the transformational idea to create (synthesize) possible solutions for the presented dilemma.

Case overview/synopsis

This case tells the transformation story of the logistics company Ekol Ukraine, which began in 2013. This company was the most successful branch of Ekol Logistics, an international corporation operating in 13 countries. From 2013 till 2021, Ekol Ukraine experienced a crisis related to the start of a conflict between Ukraine and Russian militants. It proved its ability to cope with challenges, gained almost complete autonomy from the head office, transformed the business model and culture and achieved considerable success in building an ecosystem.

Having this stage of transformation completed by 2021, the company reached a plateau and had to decide what the following changes would be. In 2021, only 14% of Ukrainian businesses used outsourcing logistics services (like the ones Ekol Ukraine provided). The remaining 86% had in-house logistics and were not ready to change the model. So, Ekol Ukraine faced a problem: how could a logistics provider grow in a market that was not mentally ready to outsource?

Complexity academic level

MBA programs.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

Case study
Publication date: 6 September 2022

Işık Özge Yumurtacı Hüseyinoğlu, Deniz Kurtay, İrem Aşar and Serra Dilmaç

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics…

Abstract

Learning outcomes

In this case study, the alternative route designs were observed to significantly decrease transportation costs and the total distance traveled. This decrease in logistics requirements almost halved the annual number of shipments and the time needed for operation and documentation activities. In addition, reduced carbon emissions made this an environmentally friendly transportation model, in line with trends in society.

Case overview/synopsis

The basis for this case study was the analysis of Whirlpool Turkey’s transportation system for materials used in the production of white goods. Data obtained through fieldwork and cooperation with company consultants showed that some suppliers have high annual logistics costs. This inefficiency causes time loss and increases the total distance traveled and thus carbon emissions. In the case study, the current application created inefficiency in cost and time management, and therefore, after determining the factors that increase costs, different transportation solutions were developed accordingly.

Complexity academic level

This case is particularly designed for undergraduates in the final semester of management courses that specialize in supply chain and operation management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 5 September 2022

Aasha Jayant Sharma and Swapnil Samant

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of…

Abstract

Learning outcomes

This study aims to introduce students to uncontrolled and unprecedented business scenarios and strategies to deal with them, to make students understand the importance of contingency planning and create what-if scenarios, to step by step guide students how to build a network contingency planning tool and to enable students to use tools such as solver to build up a dashboard with given information.

Case overview/synopsis

The case is about Godrej Commercial, a vertical of Godrej and Boyce that handles warehousing and transportation support to five verticals under the banner of Godrej operating pan India. How Godrej is trying to deal with COVID pandemic, what were their coping strategies and how contingency planning is done is what this case is all about. The main focus of this case is understanding how network contingency planning is done and what parameters should be considered. How a dashboard can be developed that can be used as a base for taking strategic decisions related to networking given the uncertainties due to COVID. The case gives hands on to students to use solver and build a dash board, plus gives a peep into Godrej and its operations.

Complexity academic level

This study is suitable for students of undergraduate or first year MBA level. Specifically, the case can be used in business strategies, operations and supply chain management courses.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 12 July 2022

Vineeta Dutta Roy

At the macro level, the case study enables the students to appreciate the complexity emerging market economies face in achieving economic development and environmental…

Abstract

Learning outcomes

At the macro level, the case study enables the students to appreciate the complexity emerging market economies face in achieving economic development and environmental sustainability without comprising each other. The students understand the importance of behavioural change and empowerment of communities in projects dealing with transformational social changes. Theoretically, the students learn about the change mechanisms and organisational practices market-based organisations install to drive their positive social change (PSC) projects. At the micro level, students learn about the process of setting up Mangalajodi Ecotourism Trust (MET) – that not only enthused the local community economically but also instilled it with awareness and motivation towards sustaining its ecosystem. Analytically, at macro level, it assists the students to have a lens of PSC framework to examine corporate social responsibility, social entrepreneurship and BoP strategies of market-based organisations to affect social change. Application/problem solving: The case study explains to the students how the PSC levers of motivation, capability and opportunity structures were applied by NatWest Bank during different phases of project execution. As management grapples with new problems, the students are encouraged to use the levers to recommend an action plan. It allows students to apply SWOT and think of competitive strategies for MET. It allows students to think of strategies that may apply for a better management of Ecotourism at Mangalajodi.

Case overview/synopsis

As part of its broader commitment to sustainable development and climate change action, the NatWest Group (formerly Royal Bank of Scotland Group) launched its Supporting Enterprise Programme in India in the year 2007. The project aimed at creating income-generating opportunities for indigenous and economically vulnerable sections of society living in critical natural ecosystems. The project was under the leadership of N. Sunil Kumar, a zealous nature lover, with over two decades of experience in business strategy and public affairs and a specialty in environmental sustainability. He headed Sustainable Banking at NatWest and was head of NatWest Foundation-India. The Mangalajodi project shared the problems many of NatWest’s other projects in India presented. Poor communities that relied solely on natural resources for their sustenance slid deeper into poverty as ecosystems degraded. Lacking alternative sources of livelihood and facing scantier resources, the communities helplessly caused additional damage to weak ecosystems when they drew on the resources even more vigorously. Poaching of migratory birds for supplemental income was a huge problem at Mangalajodi; it was not only rapidly altering the ecosystem to sustain the birds but also deteriorating and weakening its ecology as a whole. Measures to eliminate poaching were failing in the absence of alternate means of livelihoods and a strong incentive to protect the birds. MET was established under the project in 2009. A decade later, it had become a resounding success. A community-owned and run enterprise, MET was providing direct employment to over 100 poorest families at the tiny village and creating income-generating opportunities and entrepreneurial ventures for many others. Poaching was practically negligible at Mangalajodi, and the community was drawing huge admiration for its role in conserving the ecosystem. However, the progress of Mangalajodi Ecotourism was paradoxical, on the one hand; its popularity was rising but, on the other hand, it was becoming overcrowded and looked ill managed. Its rising commercial value was bringing in more land developers, builders and investors, but permanent concrete structures were also coming up quite unscrupulously. There were many challenges – how should growth of ecotourism at Mangalajodi be managed? What mechanisms and practices ensured that the community was empowered enough to participate in decisions of land use, infrastructure, energy and waste management at Mangalajodi? How should MET become more competitive and innovative to grow despite future challenges?

Complexity academic level

The case study is useful for students of Management at Under Graduate and Post Graduate Levels for understanding the following: the sustainability of fragile ecosystems; the community at the intersection of sustainable development and natural resources conservation and protection of biodiversity; knowing in detail about the planning, implementation and management of ecotourism projects; and decisions regarding community-based ecotourism projects.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 7: Management Science

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 June 2022

Morris Mthombeni, Caren Brenda Scheepers and Viwe Mgedezi

After working through the case and assignment questions, students will be able to do the following: • Analyse the aspects of strategic leadership and evaluate effectiveness of the…

Abstract

Learning Outcomes

After working through the case and assignment questions, students will be able to do the following: • Analyse the aspects of strategic leadership and evaluate effectiveness of the leadership in the case study. • Identify stakeholders in a large-scale project and differentiate between their needs and sources of power. • Establish what behavioural mechanisms can be used by leaders to gain support from stakeholders with seemingly divergent pro-poor and pro-growth development orientations for expansion in an emerging market context. • Generate recommendations to communicate the benefits of expansion plans.

Case overview/synopsis

On November 8, 2019, Jack van der Merwe, the chief executive officer of the public rapid rail organisation, Gautrain Management Agency (GMA), was considering how to influence stakeholders to support the pace of the expansion planning phase, without alienating the surrounding communities and balancing the various and sometimes opposing stakeholder interests. The case highlights the background to this dilemma in offering the financial background of the Gauteng province and the evolution of the Gautrain project in the context of an emerging market country characterised by institutions at different development levels and how the unique characteristics of the protagonist could influence stakeholder orientations. The case illustrates how the Gautrain is at the centre of a complex transport conflagration in the South African transport ecosystem. Specific stakeholders and their needs are exposed in the case to enable students to analyse their several levels of influence on the project and proposed expansion. The differences between pro-poor and pro-growth development orientations are also highlighted in this case as input to describe the dilemma Van der Merwe faced in his influencing role in this particular South African context. Students will gain insight into how to manage the tensions between pro-poor and pro-growth orientations.

Complexity academic level

The case is suitable for a graduate-level course on strategy; organisational behaviour; or leadership. The case is also suitable for a post-graduate-level course on an MBA or MPhil program on strategy and leadership.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Abstract

Study level/applicability

MBA/MS/Executive Training.

Subject area

Business and society; sustainability; women business leaders.

Case overview

This case is about the development of sustainable viticulture in Israel. Michal Akerman, a viticulturist and agronomist, implemented out-of-the box ideas at Tabor Winery, Israel, and was successful in developing organic and sustainable vineyard. However, she faced challenges in terms of improving the quality of grapes as she looked forward to growing some of the best quality French grapes in Israel in the challenging conditions of the Negev desert region.

Expected learning outcomes

The expected learning outcomes are: to analyze the environmental impact of viticulture and sustainable viticulture through Tabor’s example, to examine how leaders can drive businesses to be involved in sustainable practices and challenges involved in implementing sustainable practices and to develop a framework for female leaders working in male-dominated business environments.

Social implications

This case captures Michal Akerman’s (Michal) endeavours to develop organic and sustainable viticulture at Israel-based Tabor Winery. The traditional practices followed to grow the vineyards were proving adverse to the biodiversity. Unsustainable practices wiped out rare plants, and micro-organisms, which were essential for cultivation of grapes. The imbalance and unnatural ecosystem ultimately posed a threat to the very sustenance of the vineyards. As a seasoned viticulturist, Michal was of the view that a stable, diverse and balanced ecosystem prevented diseases among plants, and improved the quality of grapes.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Details

The Case For Women, vol. no.
Type: Case Study
ISSN: 2732-4443

Keywords

Case study
Publication date: 9 May 2022

Burcu Keskin

The case would be relevant to undergraduate level or an introductory master's level course in operations management (OM), supply chain management and production.

Abstract

Study level/applicability

The case would be relevant to undergraduate level or an introductory master's level course in operations management (OM), supply chain management and production.

Subject area

The case can be used as part of a core OM course in the MBA curriculum or any OM or supply chain elective.

Case overview

As a highly diversified manufacturing services company, Jabil's S&OP solution supports customers across many industries such as automotive, cloud computing, consumer packaging, healthcare, mobile, retail and telecommunications. Jabil's customers expect a rapid and accurate response to their demand within hours. Previously, Jabil used a series of legacy disconnected planning tools, unsynchronized data required time-consuming manipulation with Excel. Processes were conducted in siloes leading to a “load and chase” approach, which resulted in excess inventory, component shortages and inadequate capacity. The case focuses on one of the Jabil executives, Lizet Tymon (she). Struggling with the issues caused by the disconnected planning tools, Lizet champions implementing a fully integrated suite of services (built on top of the Kinaxis' RapidResponse software platform). The technology solution proposed by Lizet was ultimately implemented across the company, and the project received high marks, and it opened up career opportunities for her. However, it was not a smooth ride at the very beginning. The case focuses on the issues experienced by Lizet, as she is introducing a new technological solution approach and trying to earn support from her team, her peers, her immediate supervisor, her customers and her higher-level executives.

Expected learning outcomes

The teaching objectives include: understanding and appreciating the supply chain complexities experienced by a global contract manufacturer; helping students think critically regarding the issues around the sales and ops planning; identifying the data needs for the operation and management of a worldwide, connected supply chain; investigating agile solution approaches for information sharing, decision-making and decision-sharing; and exposing the challenges associated with a large-scale technology adaptation.

Social Implications

This case study describes the supply chain challenges experienced by a global manufacturing solutions provider and illustrates the technology adaptation led by a female executive.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 9: Operations and Logistics

Case study
Publication date: 11 April 2022

Signe Enkuzena, Janis Supe and Jana Roze

Learning outcomes are as follows: Students will understand the main characteristics of Agile leader and importance of these characteristics in successful change management…

Abstract

Learning outcomes

Learning outcomes are as follows: Students will understand the main characteristics of Agile leader and importance of these characteristics in successful change management. Students will understand how Agile leader works to manage changes in organizations and what steps the leader must take to make successful changes in the organization. Students will know in details the Kotter change management model, will recognize and will be able to apply this model in real-life situations.

Case overview/synopsis

The case study is about the College of Business Administration (CBA). The CBA is a private higher education institution located in Riga, Latvia, Eastern Europe. The CBA provides professional higher education programs. The case study tells the story how Susan was at first hired as free-lancer for specific tasks at the College in 2017. After successful competition of these tasks, Susan was hired as the new director in 2018. The management at the College was almost non-existent at that moment, and Susan had to face the question how to develop the CBA and make it profitable. Susan had to build her management team, had to review and describe all processes and had to build the internal culture of the organization. Susan implemented change management plan, and in four years, the number of students and lecturers at the College had doubled, and the turnover of the CBA had reached more than one million euros. The case study shows Agile leader characteristics and change management process in details.

Complexity academic level

Undergraduate studies.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

51 – 60 of 390