Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali
The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…
Abstract
Learning outcomes
The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.
Case overview/synopsis
Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.
Complexity academic level
The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 7: Management Science.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…
Abstract
Learning outcomes
The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.
Case overview/synopsis
The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.
Complexity academic level
This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh
After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…
Abstract
Learning outcomes
After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.
Case overview/synopsis
In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.
Complexity academic level
The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…
Abstract
Learning outcomes
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.
Case overview/synopsis
In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.
Complexity academic level
The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS2: Built environment
Details
Keywords
George (Yiorgos) Allayannis, Paul Tudor Jones and Aaron Fernstrom
The case describes a hypothetical hedge fund manager who is examining whether to invest in bitcoin. The case discusses potential risks and rewards of investing in bitcoin, the…
Abstract
The case describes a hypothetical hedge fund manager who is examining whether to invest in bitcoin. The case discusses potential risks and rewards of investing in bitcoin, the role of bitcoin and digital currencies more broadly, and financial innovation in the space, such as ICOs. It can be taught as part of a second-year MBA elective course in investments, financial institutions/capital markets, or fintech.
Details
Keywords
Kimberly A. Whitler, Graham D. Wells and Gerry Yemen
Few cases allow the student to understand the relationship between brand strategy, marketing strategy, implementation, and analysis. While some conceive of the process as being…
Abstract
Few cases allow the student to understand the relationship between brand strategy, marketing strategy, implementation, and analysis. While some conceive of the process as being sequential, this case demonstrates that in fact, this process is more fluid, and that implementation and analysis impact subsequent strategy.
This field-based case provides a rare glimpse into the turnaround of a brand that was all but dead. After Buick suffered more than five decades of declining business results and an inferior brand image versus all rivals, few thought that the brand could be resuscitated. This case provides a valuable under-the-hood look at how the Buick team, over time, progresses through a series of marketing improvements all anchored on an evolved strategy. Specifically, Buick introduced a shift in brand strategy behind an evolved brand essence statement (i.e., brand positioning), improved product lineup, new-to-the-world innovation, enhanced dealership service, and more compelling advertising. The results led to a record number of product awards, significantly improved advertising measures, improved service ratings, and better business results.
Despite significant improvement across multiple dimensions of the business, Buick still trailed key competitors on one of the most important measures Buick tracked—the brand momentum rating—suggesting that there was still more work needed to complete the brand turnaround. The case introduces Molly Peck, the new marketing director on Buick, who is wondering what more, if anything, Buick should do. The material allows for instruction around marketing strategy and the process of converting it into implementation through the use of a creative brief.
Details
Keywords
Kimberly A. Whitler, Paul W. Farris and Sylvie Thompson
This case replaces UVA-M-0837. It can be used in a variety of marketing and strategy classes to understand how (1) at a macro level, a shift in consumer and environmental factors…
Abstract
This case replaces UVA-M-0837. It can be used in a variety of marketing and strategy classes to understand how (1) at a macro level, a shift in consumer and environmental factors can impact firm strategy and (2) at a micro level, an e-mail-based marketing campaign designed to address these changes can impact firm-level performance.
The case puts the students in the position of CEO Robert Huth as he is preparing for a board meeting. He had taken David's Bridal from a loss in 1996 to sales of over $1 billion by 2011, but he was concerned about future growth. People were waiting longer and longer to get married and, once they decided to, were spending much less than in the past, so the industry had seen year-over-year declines since 2007. How would David's Bridal establish its brand in the minds of a new generation of brides who shopped, purchased, and decided differently than had brides in past generations?
Details
Keywords
George (Yiorgos) Allayannis, Gerry Yemen and Paul Holtz
This public-sourced case describes the latest restructuring efforts by Deutsche Bank (DB) and gives a short history of prior restructuring efforts from the decade before. In July…
Abstract
This public-sourced case describes the latest restructuring efforts by Deutsche Bank (DB) and gives a short history of prior restructuring efforts from the decade before. In July 2019, Christian Sewing, the new CEO of DB, announced a series of measures that included, among others, the elimination of global equity trading, the layoff of 18,000 employees, the creation of a “bad bank” to transfer noncore assets, and the suspension of dividends until 2022. The case describes key decisions a bank CEO makes when a bank needs to change course to return to profitability and growth. The case offers an opportunity to debate these key decisions, as well as discuss some of the prior ones during earlier restructuring efforts, and put the students in the CEO's shoes: What would you do and why? The case also describes key banking performance metrics (e.g., ROE, ROA) and other critical variables such as those reflecting capital health (Tier 1 ratio), as well as gives an overview of the bank business model and factors impacting bank profitability and value.
Details
Keywords
This case teaches students the importance of maintaining a strong FICO score by illustrating the consequences of paying bills late or not at all. The protagonist is David Molina…
Abstract
This case teaches students the importance of maintaining a strong FICO score by illustrating the consequences of paying bills late or not at all. The protagonist is David Molina, a waiter at a struggling Italian restaurant located down the block from where he lives. Money is tight for Molina right now—his limited income means he lives paycheck to paycheck. However, Molina knows things will be looking up for him soon because he recently accepted a job as a bank teller across town—his first desk job.
Molina has been putting off paying two of his bills: a cable bill and his Bank of America credit card bill, both of which are late and have been issued, this time, in the form of threats to impact Molina's credit score if he doesn't pay them. He has just enough money to afford the minimum payments on each overdue bill. But then he receives a phone call from his friend, Jim Lindsey, reminding him about an invitation to go to Myrtle Beach for the upcoming weekend. Molina knows he cannot afford it, but a woman he's attracted to, Jessica, will be there too. Should Molina put off the bills yet again, and if so, how exactly will being late on them hurt his credit score?
Details
Keywords
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business