Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 223
Applied filters:
Built Environment
Environmental Management
Management Science
Public Sector Management
Show teaching notes
Clear all
Case study
Publication date: 26 November 2024

Stephen T. Homer

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case…

Abstract

Learning outcomes

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case study context (C5); and to synthesise a group plan to solve issue(s) within specific case study context (A4).

Case overview/synopsis

In 2017, China proclaimed that it would no longer accept plastic waste for recycling, this was in-line with China’s Operation “National Sword” to review the quality of these plastic imports to ensure their recyclability. This sent shock waves through a now globalised recycling network, with China previously having imported 95% of the EUs and 70% of US plastics that had been collected for recycling. This plastic backlog was then diverted to South-East Asian nations, particularly Malaysia, which this case focuses the discussion upon. While the potential for significant economic benefits drew the attention of illegitimate and unscrupulous businessmen alike, the environmental degradation from the often, low technological recycling processes and even burning of low-grade plastics brought profound negative impacts. This case focuses upon, then Minister, Yeo Bee Yin who led the Ministry of Energy, Science, Technology, Environment and Climate Change, in which she took an active and aggressive stance in attempt to stop Malaysia becoming the dumping ground for the global plastic crisis.

Complexity academic level

This case is appropriate for final year undergraduate and any postgraduate degrees in Business.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 14 November 2024

Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…

Abstract

Learning outcomes

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.

Case overview/synopsis

Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.

Complexity academic level

The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 16 August 2024

Ujjal Mukherjee

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…

Abstract

Learning outcomes

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.

Case overview/synopsis

The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.

Complexity academic level

This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 June 2024

Hemverna Dwivedi, Rohit Kushwaha and Pradeep Joshi

This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the…

Abstract

Learning outcomes

This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the growth strategy of a sustainable brand, as it delineates the challenges faced by a woman ecopreneur. In response to these causative conundrums, the incumbent would be able to develop an understanding on the evolving landscape in context to the association between meeting consumer expectations, brand positioning and its channelization towards growth and revenue generation. Furthermore, the learners will be able to analyse the stages of product life cycle of a sustainable product and recommend an effective strategic plan to meet the consumer expectations and achieve desired growth by the application of Kano model.

Case overview/synopsis

Thenga was a home-grown brand from Kerala (God’s own country) founded by Maria Kuriakose, a native of Kerala in 2019. Unlike other brands, which were using coconut as a source of flesh, water and oil, Kuriakose came up with an idea of using the tossed shells of coconuts which eventually used to end up at landfills. These shells were crafted into aesthetics by the team of Thenga while adhering to the zero-waste policy. The brand gained momentum with the overwhelming positive response from the natives of Kerala and carved a way across the boundaries of Kerala, gradually reaching to every corner of India. Kuriakose thought of scaling the brand in the international boundaries as well. Within no time, the brand was a success. However, over the time, the brand was confronted with two broad dilemmas. First, non-uniformity in the sizes of the products, especially in bulk orders where maintaining uniformity was essential. The customers complained that there was no uniformity in the size of the products because for gifting purposes, they wanted all the products to look alike. And second, selecting the stringent quality shells because the ones exposed to sun for a very long time were not ideal for crafting the products due to the cracking of the shells, thereby affecting their durability. It became difficult addressing to these complex issues because the shells were nature’s creations. These issues were very different from the managerial dilemmas. Would the perspectives of management provide a solution? Kuriakose had to find a way out in the long term for the survival of the brand especially during its growth phase.

Complexity academic level

The case study is relevant for students in disciplines of entrepreneurship, green marketing, brand management, corporate social responsibility and strategy. It is designed for advanced MBA/PGDM and capstone courses. The case study also addresses the elements of customers’ perceptions towards innovative products and can be used as an addition for marketing courses dealing with strategies to improve the awareness and adoption of sustainable products.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 15 April 2024

Irfan Saleem, Muhammad Ashfaq and Shajara Ul-Durar

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict management styles of a female leader; and comprehend the organizational change process to devise an effective communication strategy.

Case overview/synopsis

Ever-changing business demands managers adopt organizational change in leadership styles, business processes, updated skill sets and minds. One must be ready to understand influential nurtured corporate culture and human resource resistance towards the inevitable change. This case study attempted to discuss the female protagonist dealing with an organizational conflict. The case study introduces one such protagonist from a century-old woman’s educational institution. Subsequently, this case study presents organizational change under the leadership of a female protagonist. This teaching case study gives the reader an insight into situational leadership, conflict management styles and the corporate change process by implementing an appropriate communication strategy. This case study describes the change process through the various decision-making scenarios that an academic institute over a century old faced during the post-pandemic crisis after adding a crucial protagonist. The employee union, followed by students and administrative employees, has challenged the dominating leadership position held by the college principal. Protests occurred due to the college administrator’s refusal to adjust her approach to leadership. This teaching case then provided different leadership styles of the current and old leaders. Finally, the case study lists the challenges a leader faces during turbulent times and the lessons a leader should learn from such situations while transforming the institute.

Complexity academic level

The teaching case benefits undergraduate students in business management subjects such as conflict management, leadership and organizational behaviour. Nevertheless, trainers can use this case study to teach seasoned managers and emerging leaders the significance of adopting and implementing change while understanding situational leadership.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 26 February 2024

Arpita Amarnani, Umesh Mahtani and Vithal Sukhathankar

The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side…

Abstract

Learning outcomes

The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side energy management for sustainable development; summarise the challenges that an institute faces in transitioning to a more environmentally friendly mode of operations concerning energy management; illustrate the difference between operating expense and capital expenditure methods used for solar rooftop projects from the perspective of Goa Institute of Management (GIM); and analyse different project proposals for solar rooftop power generation energy using capital budgeting techniques.

Case overview/synopsis

Dr Ajit Parulekar, director at GIM, was evaluating the steps taken over the past few years for sustainable energy management to understand their impact and consider ways in which to take the environmental sustainability agenda forward. One of the projects that he was considering was the rooftop solar power plant. GIM had received proposals from several different vendors and evaluated three proposals out of these. He needed to decide on the capacity of the rooftop solar power generation and the type of contract that he should get into for the implementation of the project. This case study describes the differences and highlights the advantages and disadvantages of all the mentioned models with respect to GIM.

Complexity academic level

This case study is suitable for post-graduate level management students, as well as for undergraduate-level finance and management students.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 8 January 2024

Aasha Jayant Sharma

Upon completion of the case study, the students will be able to apply business upscaling strategies to an upcycling social enterprise that is embracing a circular economy approach…

Abstract

Learning outcomes

Upon completion of the case study, the students will be able to apply business upscaling strategies to an upcycling social enterprise that is embracing a circular economy approach by using the Ansoff growth matrix; to analyze strategies for transition to circularity using the butterfly diagram tool for both business and personal use; to indulge in upcycling exercises for a used product of their choice, not only unleashing their creative potential but also contributing to an idea that might get them to win a contest; to analyze different operational problems and efficiency opportunities that arise when a company takes on social and environmental causes as a business opportunity; and to strategize how a social enterprise can be sustained and made for-profit by applying business strategies.

Case overview/synopsis

This case study covers the concepts of upcycling under the gamut of circular economy, a concept that has become more of a strategy to sustain and survive in today’s world. This case is about Rimagined, an upcycling company that could be a model for circular ideas and upcycling of stuff. This case study narrates the growth and the challenges faced in upcycling and encourages students to ideate a new design for any upcycling item of their choice. This case will also make students strategize the expansion plan for Rimagined. Shailaja Rangarajan is the protagonist of this case study who started this social enterprise to make a difference and do her bit. Sustaining a social enterprise requires business acumen and risk-bearing capacities like any other business. Rangarajan was facing the dilemma of expansion and was trying out several feasible options. Rimagined had been unable to attract investors because their expectations of quick returns could not be immediately fulfilled. Investors focused more on waste management as an industry and not on upcycling as a separate area of work.

Complexity academic level

This case study is suitable for students of MBA or executive MBA level. Specifically, this case study can be used in business strategies and circular economy courses.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 10 of 223