Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 745
Applied filters:
Built Environment
Operations and Logistics
Public Sector Management
Tourism and Hospitality
Other subjects
English
Spanish
Clear all
Case study
Publication date: 3 December 2024

Aditya Gulia and Jatin Pandey

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate the cost of turnover and design solutions to the problem of attrition and low satisfaction.

Case overview/synopsis

Pace Control Gears was a small-scale enterprise based out of Sonipat, India. It was an entrepreneurial venture by Rajesh Kumar, who had set Pace in 2010 to manufacture low-voltage electrical apparatus. Recently, Pace had begun to experience issues with quality control that were largely the result of human error. The company was facing a drop in satisfaction levels and higher attrition levels among the employees. Kumar had to find a solution quickly to address the problem, as it had direct implications for the company’s margins and the assurance of quality that it was associated with in the market.

Complexity academic level

This case study is suited to undergraduate and postgraduate courses in human resource management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 6: Human Resources Management.

Case study
Publication date: 2 December 2024

Aditya Kumar Sahu

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces analysis for understanding the situation of any company; to understand various demand forecasting techniques with the case example of Kaspians Café; to analyse different factors that influence the demand with the case example of Kaspians Café; and to learn how to choose the best time-series forecasting method based on the available dataset.

Case overview/synopsis

This case study focuses on operations strategy, specifically analysing the issues encountered by the Kaspians Café, a food joint establishment located within the Kaspians Institute of Management. Kaspians Café, due to its large student clientele, encountered operational inefficiencies such as inadequate inventory management, stockouts and wastage. These issues resulted in financial losses and customer dissatisfaction. This case study focuses on forecasting the demand for different food items at different times to get a better understanding of the stock to be maintained at Kaspians Café. Furthermore, Shyam Manral, the owner of Kaspians Café, was confronted with the difficulties arising from the surging popularity of neighbouring Dhabas and the escalating impact of food delivery platforms such as Zomato and Swiggy. The formerly prosperous Kaspians Café establishment, known for its uniform offers, was now encountering strong competition from the quaint ambience and varied menus of the Dhabas situated in close proximity to the campus entrance. These conventional establishments not only accommodated the changing preferences of students but also functioned as convenient centres for social meetings. The emergence of Zomato and Swiggy had revolutionised the eating patterns of students by providing a wide range of choices that were conveniently delivered to their residences, thereby diminishing the attractiveness of Kaspians Café. Manral was struggling to revive his business in light of these shifting circumstances. He pondered how to keep consumers loyal in the middle of changing cuisine preferences and the convenience provided by contemporary food delivery services.

Complexity academic level

This case study can be used in the operations management course at the MBA/postgraduate level.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 November 2024

Pratik Rajendra Satpute, Gautam Surendra Bapat and Shefali Joshi

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the…

Abstract

Learning outcomes

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the various operational procedures used to enhance a smooth group check-in in hotels; use the steps defined in group check-in procedure to improve service efficiency in hotel operations; and examine and evaluate the optimal solution for a smooth group check-in for hotels.

Case overview/synopsis

“The Big Fat Indian Wedding” delves into the challenges faced by Hotel Plaza Blu, a business hotel in Pune, Maharashtra, in 2023. A big wedding group was arriving at the hotel, which comprised almost 350 adults and 120 children. Mr Parag Patil, the front office manager, had done all the preparations for group arrival but just one hour before the arrival Mr Suresh Menon, the group coordinator, came and informed that 150 additional guests would be arriving, as the other hotel, where arrangements for these guests were made, had a major electricity generator breakdown and the hotel was in complete blackout. Patil had the challenge of formulating an action plan to achieve a smooth group check-in with the last-minute changes.

Complexity academic level

Executive development programmes and graduate-level courses in non-profit hospitality and tourism management might benefit from this case study. The operational management courses in the BBA, UG management programmes might all benefit from using this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 October 2024

Niaz Ahmed Bhutto, Abdul Rehman Shaikh and Sanober Shaikh

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the…

Abstract

Learning outcomes

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the procurement of services; evaluate the potential risks and challenges associated with relying on a single vendor for critical services; apply the four-stage model of crisis management to the breach of contract by Fresh Bites Catering; examine how adopting sustainable procurement practices, such as diversifying suppliers and establishing contingency plans, can mitigate these risks and ensure business continuity; and analyze the dynamics, roles and potential conflicts between the principal (Multan University) and agent (Fresh Bites Catering) using the principal–agent theory (PAT).

Case overview/synopsis

This case study explores the challenges and implications of sustainable procurement within the context of Multan University’s cafeteria services. It delves into the sudden contract breach by Fresh Bites Catering, a long-time partner responsible for providing central cafeteria services, and examines the resulting operational crisis faced by the university. This case study highlights key procurement processes, including vendor selection, contract management and adherence to sustainability principles, as well as the risks associated with single-vendor dependency. By applying frameworks such as the PAT, the four-stage model of crisis management and sustainable procurement practices, this case study encourages students to critically assess the failures in contract enforcement, risk mitigation and service continuity. Additionally, it stimulates discussion on the benefits of robust risk management strategies, multi-vendor approaches and clear contract terms to prevent future disruptions in essential services. This case study serves as a valuable tool for understanding how procurement strategies influence organizational performance and long-term sustainability in higher education institutions.

Complexity academic level

This is a decision-making case and can be taught in Master of Business Administration courses in purchase and supply management and operations management. This case study is mainly written to make students understand and analyze the potential risks of a single vendor, the benefits of diversifying suppliers and sustainable procurement.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 September 2024

Rajkumari Mittal, Parul Sinha and Bikramjit Rishi

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions…

Abstract

Learning outcomes

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions, the students will be able to:▪ Understand the transformation of rural retail from traditional models to organized modern retail;▪ Understand the opportunities and challenges of rural markets with specific reference to automobile products;▪ Identify and evaluate the various distribution channels available for rural markets; and▪ Devise a suitable rural-centric distribution model for automobile products following an appropriate logistics system.

Case overview/synopsis

Manan Motors, a dealership of Honda Motorcycle & Scooter India (HMSI) Private Limited in Hathras City of Uttar Pradesh province in India, has been operating successfully for the past two decades. Mr Manoj Bansal, the director at Manan Motors, was primarily targeting the urban markets with 60% dependency on the scooter portfolio of HMSI. But multiple pressures like stringent vehicle emission norms, price rise of two-wheelers and the impact of the pandemic took a toll upon the urban business of Honda Motorcycle and Scooter India Limited and subsequently upon Manan Motors. The sales for HMSI dipped from 15,121 million units in 2020–2021 to 13,466 million units in 2021–2022. Consequently, Bansal decided to alter the business strategy of Manan Motors and shift its focus from the urban to the rural territory of Hathras, where it could foresee demand for entry-level two-wheelers (engine capacity between 75 and 110 cc). Rural markets were developing, so Bansal realized that supplying a low-cost, low-end model to the rural Indian market was an opportunity for his dealership. Bansal’s decision to focus on the rural vertical of its two-wheeler business stirred several questions that floated in his mind. Should they manage distribution on their own, or through some channel members, or should they follow a rural-specific modern retail model?

Complexity academic level

The case study is designed for use by a postgraduate or executive-level audience for subjects such as sales and distribution management, distribution management and rural marketing. Students will understand the concept of distribution management and associated keywords specific to rural markets. The case study provides an opportunity to discuss and decide how a company can penetrate the rural market and also discusses the opportunities and challenges of rural distribution.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 18 July 2024

Abdul Rehman Shaikh, Manzoor Ali Mirani and Saqib Ali

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee training and supplier relationships when analyzing shrink and developing solutions, evaluate how technology improves production inventory control and visibility and recognize the importance of fostering a culture of employee accountability and ownership to minimize inventory loss and improve overall operational efficiency.

Case overview/synopsis

On June 2, 2023, sitting in his office in Karachi, Pakistan, Khan Aamir, the manager of store and inventory at Euro Manufacturing, found himself immersed in a cloud of confusion. The incessant loss of inventory items, particularly the nut bolts and small accessories, had become a perplexing challenge. To address these losses and provide a cycle count report to the director of supply chain, Aamir, manager of store and inventory, was given the responsibility to take action. He was looking for a comprehensive approach to address the current problems and prevent further losses in the future. This case study examines the various reasons for the losses, including theft, inadequate inventory control methods, human error and problems with suppliers. It highlights the importance of established procedures, the use of technology (such as barcode scanning, radio-frequency identification tagging and inventory management software) and the cultivation of a culture of accountability among employees.

Complexity academic level

This case study is developed for class discussion in the course of operations management or supply chain management. This case study is suitable for use with undergrad students. This case study can be taught in a module on operations management or supply chain management, as part of a broader course in business management or industrial engineering.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 June 2024

Sumanth Pramod Desai, Sushil Pare, Sanjay Hanji and M.M. Munshi

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load…

Abstract

Learning outcomes

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load distance values for warehouse location and choose the optimum location based on the load distance analysis.

Case overview/synopsis

DB Builders, a prominent Indian construction company, faced a crucial decision in selecting an ideal storage warehouse for a project involving 100 flats spread across five locations. Mr Vijay Kumar, an experienced material handling expert, was entrusted with this task as part of transitioning the company’s material allocation system toward centralization. Using practical travel distances, Kumar meticulously scouted four potential warehouse locations. The selection process hinged on three primary factors: load, distance to apartment sites, safety and cost of the premises, each carrying specific weightage. The project planning department provided scores for safety and cost, helping evaluate the options. This unique challenge arises due to varying material requirements across the apartment locations, demanding an efficient warehouse planning. The selection of the optimal storage warehouse holds paramount importance in facilitating the smooth execution of these larger projects. Kumar’s expertise and strategic decision-making are pivotal in ensuring a seamless transition toward centralized material handling, which is essential for the company’s future success.

Complexity academic level

This teaching activity is aimed at introductory/basic courses in Bachelors and Masters of Business administration.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

1 – 10 of 745