Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate…
Abstract
Learning outcomes
After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate the cost of turnover and design solutions to the problem of attrition and low satisfaction.
Case overview/synopsis
Pace Control Gears was a small-scale enterprise based out of Sonipat, India. It was an entrepreneurial venture by Rajesh Kumar, who had set Pace in 2010 to manufacture low-voltage electrical apparatus. Recently, Pace had begun to experience issues with quality control that were largely the result of human error. The company was facing a drop in satisfaction levels and higher attrition levels among the employees. Kumar had to find a solution quickly to address the problem, as it had direct implications for the company’s margins and the assurance of quality that it was associated with in the market.
Complexity academic level
This case study is suited to undergraduate and postgraduate courses in human resource management and general management.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 6: Human Resources Management.
Details
Keywords
Arvind Shroff and Bhavin J. Shah
The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…
Abstract
Learning outcomes
The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).
Case overview/synopsis
Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”
Complexity academic level
This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case…
Abstract
Learning outcomes
The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case study context (C5); and to synthesise a group plan to solve issue(s) within specific case study context (A4).
Case overview/synopsis
In 2017, China proclaimed that it would no longer accept plastic waste for recycling, this was in-line with China’s Operation “National Sword” to review the quality of these plastic imports to ensure their recyclability. This sent shock waves through a now globalised recycling network, with China previously having imported 95% of the EUs and 70% of US plastics that had been collected for recycling. This plastic backlog was then diverted to South-East Asian nations, particularly Malaysia, which this case focuses the discussion upon. While the potential for significant economic benefits drew the attention of illegitimate and unscrupulous businessmen alike, the environmental degradation from the often, low technological recycling processes and even burning of low-grade plastics brought profound negative impacts. This case focuses upon, then Minister, Yeo Bee Yin who led the Ministry of Energy, Science, Technology, Environment and Climate Change, in which she took an active and aggressive stance in attempt to stop Malaysia becoming the dumping ground for the global plastic crisis.
Complexity academic level
This case is appropriate for final year undergraduate and any postgraduate degrees in Business.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 4: Environmental Management.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
Hemverna Dwivedi, Rohit Kushwaha and Pradeep Joshi
This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the…
Abstract
Learning outcomes
This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the growth strategy of a sustainable brand, as it delineates the challenges faced by a woman ecopreneur. In response to these causative conundrums, the incumbent would be able to develop an understanding on the evolving landscape in context to the association between meeting consumer expectations, brand positioning and its channelization towards growth and revenue generation. Furthermore, the learners will be able to analyse the stages of product life cycle of a sustainable product and recommend an effective strategic plan to meet the consumer expectations and achieve desired growth by the application of Kano model.
Case overview/synopsis
Thenga was a home-grown brand from Kerala (God’s own country) founded by Maria Kuriakose, a native of Kerala in 2019. Unlike other brands, which were using coconut as a source of flesh, water and oil, Kuriakose came up with an idea of using the tossed shells of coconuts which eventually used to end up at landfills. These shells were crafted into aesthetics by the team of Thenga while adhering to the zero-waste policy. The brand gained momentum with the overwhelming positive response from the natives of Kerala and carved a way across the boundaries of Kerala, gradually reaching to every corner of India. Kuriakose thought of scaling the brand in the international boundaries as well. Within no time, the brand was a success. However, over the time, the brand was confronted with two broad dilemmas. First, non-uniformity in the sizes of the products, especially in bulk orders where maintaining uniformity was essential. The customers complained that there was no uniformity in the size of the products because for gifting purposes, they wanted all the products to look alike. And second, selecting the stringent quality shells because the ones exposed to sun for a very long time were not ideal for crafting the products due to the cracking of the shells, thereby affecting their durability. It became difficult addressing to these complex issues because the shells were nature’s creations. These issues were very different from the managerial dilemmas. Would the perspectives of management provide a solution? Kuriakose had to find a way out in the long term for the survival of the brand especially during its growth phase.
Complexity academic level
The case study is relevant for students in disciplines of entrepreneurship, green marketing, brand management, corporate social responsibility and strategy. It is designed for advanced MBA/PGDM and capstone courses. The case study also addresses the elements of customers’ perceptions towards innovative products and can be used as an addition for marketing courses dealing with strategies to improve the awareness and adoption of sustainable products.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 4: Environmental management.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…
Abstract
Learning outcomes
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.
Case overview/synopsis
In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.
Complexity academic level
The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS2: Built environment
Details
Keywords
Arpita Amarnani, Umesh Mahtani and Vithal Sukhathankar
The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side…
Abstract
Learning outcomes
The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side energy management for sustainable development; summarise the challenges that an institute faces in transitioning to a more environmentally friendly mode of operations concerning energy management; illustrate the difference between operating expense and capital expenditure methods used for solar rooftop projects from the perspective of Goa Institute of Management (GIM); and analyse different project proposals for solar rooftop power generation energy using capital budgeting techniques.
Case overview/synopsis
Dr Ajit Parulekar, director at GIM, was evaluating the steps taken over the past few years for sustainable energy management to understand their impact and consider ways in which to take the environmental sustainability agenda forward. One of the projects that he was considering was the rooftop solar power plant. GIM had received proposals from several different vendors and evaluated three proposals out of these. He needed to decide on the capacity of the rooftop solar power generation and the type of contract that he should get into for the implementation of the project. This case study describes the differences and highlights the advantages and disadvantages of all the mentioned models with respect to GIM.
Complexity academic level
This case study is suitable for post-graduate level management students, as well as for undergraduate-level finance and management students.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS4: Environmental management.
Details
Keywords
In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best…
Abstract
In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best Buy had adopted a new business model, culture, and customer-segmentation template called Customer Centricity. This move created volatility in the price of Best Buy stock because of the higher-than-expected employee costs that went with this new way of doing business and the difficulty of executing the old and the new business models simultaneously while the new model was rolled out. Best Buy responded to Wall Street's short-term focus in a myriad of ways. It first asked for investor patience, and stressed the strong operating results achieved in Best Buy stores operating under the new model. But in June 2007, after the stock dropped again, the CEO knew he had to decide whether to open more Best Buy stores, increase the company's dividend, or increase the stock-repurchase program.
This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with…
Abstract
This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with hedging and option pricing, the instructor may choose to cover both cases in a single class period. It is the companion case to “J&L Railroad” [UVA-F-1053], and presents more technical issues regarding the hedging problem by requiring students to understand option-pricing principles. The board likes the CFO's hedging recommendations, but it wants a more careful analysis of the bank's prices for its risk-management products: the caps and floors. Besides demanding an understanding of option pricing, this case puts particular emphasis on the calculation and use of implied volatility.
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business