Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 402
Applied filters:
Built Environment
Management Science
Other subjects
Indian Institute of Management, Ahmedabad
Emerging Markets Case Studies
Clear all
Case study
Publication date: 14 November 2024

Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…

Abstract

Learning outcomes

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.

Case overview/synopsis

Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.

Complexity academic level

The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 16 August 2024

Ujjal Mukherjee

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…

Abstract

Learning outcomes

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.

Case overview/synopsis

The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.

Complexity academic level

This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 11 December 2023

Ijaz Yusuf

Upon completion of the case study, the students will be able to find the challenges and underlying structures that cause the problem; the students will be able to identify the…

Abstract

Learning outcomes

Upon completion of the case study, the students will be able to find the challenges and underlying structures that cause the problem; the students will be able to identify the dynamic variables and develop the interconnection and interlinkages among the time-delayed variables to build the story of the business case; the students could develop the block diagram and could build the system dynamics model using the simulation software STELLA, and if they do not have the simulation software, even then they could have a mental model to understand the problem well; the system dynamics students can design the policies to make the system better behaved and recommend solutions; and the students could make mind maps and develop the mental model and could recommend solutions and way forward to overcome the challenges and solve the issues.

Case overview/synopsis

Tradeasia is a small-scale manufacturing firm that had started its business activities near Sundar Industrial Estate, Raiwind, in September 2007. The company’s prime focus was to buy the potato starch from chips manufacturing companies and, then, extract the potato starch from the waste potato using its own machinery and sell it as a sizing agent to textile mills. Quality characteristics in terms of better millage and enhanced gullibility made it compatible with Rafhan corn-based starch. The major challenge linked to potato starch was its degree of wetness; the potato starch either extracted from rotten potato or procured from the potato chips manufacturing companies had a high degree of wetness and moisture content. Wet potato starch sometimes had more than 60% moisture content, which was really a challenge. Owing to the high degree of wetness, the wet starch was prone to fungus growth, and within hours, the fungus created toxins if it was not dried immediately, and then after 24 h, toxins acquired a black colour, and they became hardened like pebbles. The starch then was unusable even for sizing purposes for textile products. Reduction in the degree of wetness was really a big challenge and demanded prompt action and high productivity of the operational staff to make that product dry for sale purposes. This was the biggest challenge that ended up in huge inventories of wet starch. Capacity constraints and operational inefficiency killed the company’s productivity and affected the company’s profit.

Complexity academic level

This case study is written and developed for MBA and MS-level supply chain students of the system dynamics course or those studying management of supply chain complexities. This case study discusses the operational challenges while running the business; huge inventories, capacity constraints and inefficiency in production operations were the challenges associated with almost all manufacturing industries. This case study discussed not only why such challenges are appearing in the business but also the solution that resided in the wisdom shared by the employees in the board meeting. An integrated system dynamics model could be used to design the policies to overcome such challenges. Even the block diagram of the model and causal loop diagram could help to conceptualize the problem and explore the way forward.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 7 December 2023

Chitra Singla and Bulbul Singh

Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as…

Abstract

Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as part of its inorganic expansion strategy, Tega bought a mill-liner company in South Africa. Buoyed by this growth, two acquisitions were made in Australia and Chile in the year 2011. However, post-acquisition, several managerial, legal and commercial problems crept up in its manufacturing facilities in Chile, leading to financial downturn in Tega's fortunes in 2016 and compelling it to either plan a revival or divest its interest in its Chilean Plant.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Amit Karna and Aarushi Tiwari

What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group…

Abstract

What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group. ETG was taken over by the then CFO Mahesh Patel after exit of the founding stakeholders. It was then when the company shifted its focus to being a key regional player. In the next 35 years, the company grew systematically. Business focus evolved when Patel saw an opportunity in logistics in remote sub-Saharan Africa. This was followed by business expansion with supply chain diversification and significant infrastructure investments. All the different businesses amalgamated under a single group for better operations and ease of scaling up. They were later divided into six separate verticals for better management. Vamara (FMCG vertical) was launched in 2018 as the company moved towards digitalisation — externally and internally. ETG plans to focus on new business opportunities and continue to diversify across geographies and portfolios.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Sundaravalli Narayanaswami and N Ravichandran

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college…

Abstract

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college peers, who conceptualized air-conditioned, industrial safety helmets. This innovative revolutionary product offered industrial workers not only safety but aesthetics and comfort. The founders hoped that the product could change the perception of safety helmets from mandatory wear to desired wear. The case details the production process, staffing, raw material required and procurement lead time.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Sobhesh Kumar Agarwalla and Ajay Pandey

This case describes the growth of ReNew Power during its first decade of operation. Sumant Sinha, a first-generation entrepreneur and former banker, founded the company, which…

Abstract

This case describes the growth of ReNew Power during its first decade of operation. Sumant Sinha, a first-generation entrepreneur and former banker, founded the company, which grew from a modest generator-cum-developer of wind energy-based electricity to one of India's largest companies in the renewable energy sector. With the entry of large, well-funded players such as Tata Power and Adani Green into the Indian renewable sector by the end of 2020, Sinha had to make a strategic decision: should ReNew continue to organically scale up its presence in an increasingly competitive yet expanding Indian renewable energy sector, should it diversify geographically, or should it pursue emerging opportunities for vertical or horizontal integration within the sector? The case provides an opportunity to discuss how alternative business models and competitive scenarios may facilitate or inhibit the growth of a player in the renewable energy sector.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

1 – 10 of 402