Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 38
Applied filters:
Built Environment
Environmental Management
Indian Institute of Management, Ahmedabad
Darden Business Publishing Cases
Management School, Fudan University
The Case Writing Centre, University of Cape Town, Graduate School of Business
Emerging Markets Case Studies
Clear all
Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 26 November 2024

Stephen T. Homer

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case…

Abstract

Learning outcomes

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case study context (C5); and to synthesise a group plan to solve issue(s) within specific case study context (A4).

Case overview/synopsis

In 2017, China proclaimed that it would no longer accept plastic waste for recycling, this was in-line with China’s Operation “National Sword” to review the quality of these plastic imports to ensure their recyclability. This sent shock waves through a now globalised recycling network, with China previously having imported 95% of the EUs and 70% of US plastics that had been collected for recycling. This plastic backlog was then diverted to South-East Asian nations, particularly Malaysia, which this case focuses the discussion upon. While the potential for significant economic benefits drew the attention of illegitimate and unscrupulous businessmen alike, the environmental degradation from the often, low technological recycling processes and even burning of low-grade plastics brought profound negative impacts. This case focuses upon, then Minister, Yeo Bee Yin who led the Ministry of Energy, Science, Technology, Environment and Climate Change, in which she took an active and aggressive stance in attempt to stop Malaysia becoming the dumping ground for the global plastic crisis.

Complexity academic level

This case is appropriate for final year undergraduate and any postgraduate degrees in Business.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 28 June 2024

Hemverna Dwivedi, Rohit Kushwaha and Pradeep Joshi

This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the…

Abstract

Learning outcomes

This case study aims to simulate the learners’ thoughts about the earnest comprehension of sustainable brands with zero waste policy. It will further prompt them to anatomize the growth strategy of a sustainable brand, as it delineates the challenges faced by a woman ecopreneur. In response to these causative conundrums, the incumbent would be able to develop an understanding on the evolving landscape in context to the association between meeting consumer expectations, brand positioning and its channelization towards growth and revenue generation. Furthermore, the learners will be able to analyse the stages of product life cycle of a sustainable product and recommend an effective strategic plan to meet the consumer expectations and achieve desired growth by the application of Kano model.

Case overview/synopsis

Thenga was a home-grown brand from Kerala (God’s own country) founded by Maria Kuriakose, a native of Kerala in 2019. Unlike other brands, which were using coconut as a source of flesh, water and oil, Kuriakose came up with an idea of using the tossed shells of coconuts which eventually used to end up at landfills. These shells were crafted into aesthetics by the team of Thenga while adhering to the zero-waste policy. The brand gained momentum with the overwhelming positive response from the natives of Kerala and carved a way across the boundaries of Kerala, gradually reaching to every corner of India. Kuriakose thought of scaling the brand in the international boundaries as well. Within no time, the brand was a success. However, over the time, the brand was confronted with two broad dilemmas. First, non-uniformity in the sizes of the products, especially in bulk orders where maintaining uniformity was essential. The customers complained that there was no uniformity in the size of the products because for gifting purposes, they wanted all the products to look alike. And second, selecting the stringent quality shells because the ones exposed to sun for a very long time were not ideal for crafting the products due to the cracking of the shells, thereby affecting their durability. It became difficult addressing to these complex issues because the shells were nature’s creations. These issues were very different from the managerial dilemmas. Would the perspectives of management provide a solution? Kuriakose had to find a way out in the long term for the survival of the brand especially during its growth phase.

Complexity academic level

The case study is relevant for students in disciplines of entrepreneurship, green marketing, brand management, corporate social responsibility and strategy. It is designed for advanced MBA/PGDM and capstone courses. The case study also addresses the elements of customers’ perceptions towards innovative products and can be used as an addition for marketing courses dealing with strategies to improve the awareness and adoption of sustainable products.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 26 February 2024

Arpita Amarnani, Umesh Mahtani and Vithal Sukhathankar

The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side…

Abstract

Learning outcomes

The learning outcomes of this study are to identify and discuss ways in which energy consumption in a residential educational institute can be reduced by improving demand-side energy management for sustainable development; summarise the challenges that an institute faces in transitioning to a more environmentally friendly mode of operations concerning energy management; illustrate the difference between operating expense and capital expenditure methods used for solar rooftop projects from the perspective of Goa Institute of Management (GIM); and analyse different project proposals for solar rooftop power generation energy using capital budgeting techniques.

Case overview/synopsis

Dr Ajit Parulekar, director at GIM, was evaluating the steps taken over the past few years for sustainable energy management to understand their impact and consider ways in which to take the environmental sustainability agenda forward. One of the projects that he was considering was the rooftop solar power plant. GIM had received proposals from several different vendors and evaluated three proposals out of these. He needed to decide on the capacity of the rooftop solar power generation and the type of contract that he should get into for the implementation of the project. This case study describes the differences and highlights the advantages and disadvantages of all the mentioned models with respect to GIM.

Complexity academic level

This case study is suitable for post-graduate level management students, as well as for undergraduate-level finance and management students.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 8 January 2024

Aasha Jayant Sharma

Upon completion of the case study, the students will be able to apply business upscaling strategies to an upcycling social enterprise that is embracing a circular economy approach…

Abstract

Learning outcomes

Upon completion of the case study, the students will be able to apply business upscaling strategies to an upcycling social enterprise that is embracing a circular economy approach by using the Ansoff growth matrix; to analyze strategies for transition to circularity using the butterfly diagram tool for both business and personal use; to indulge in upcycling exercises for a used product of their choice, not only unleashing their creative potential but also contributing to an idea that might get them to win a contest; to analyze different operational problems and efficiency opportunities that arise when a company takes on social and environmental causes as a business opportunity; and to strategize how a social enterprise can be sustained and made for-profit by applying business strategies.

Case overview/synopsis

This case study covers the concepts of upcycling under the gamut of circular economy, a concept that has become more of a strategy to sustain and survive in today’s world. This case is about Rimagined, an upcycling company that could be a model for circular ideas and upcycling of stuff. This case study narrates the growth and the challenges faced in upcycling and encourages students to ideate a new design for any upcycling item of their choice. This case will also make students strategize the expansion plan for Rimagined. Shailaja Rangarajan is the protagonist of this case study who started this social enterprise to make a difference and do her bit. Sustaining a social enterprise requires business acumen and risk-bearing capacities like any other business. Rangarajan was facing the dilemma of expansion and was trying out several feasible options. Rimagined had been unable to attract investors because their expectations of quick returns could not be immediately fulfilled. Investors focused more on waste management as an industry and not on upcycling as a separate area of work.

Complexity academic level

This case study is suitable for students of MBA or executive MBA level. Specifically, this case study can be used in business strategies and circular economy courses.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 13 December 2023

Sanjay Chaudhary and Shantanu Trivedi

An instructor engaged students in managing and reporting sustainability initiatives at an organisation. After completion of the case study discussion, the students will be able to…

Abstract

Learning outcomes

An instructor engaged students in managing and reporting sustainability initiatives at an organisation. After completion of the case study discussion, the students will be able to critique the sustainability initiatives that can be undertaken at an organisation; understand sustainability reporting; analyse how result-based management aids in sustainability report preparation; recommend critical considerations for conducting a sustainability impact assessment by an educational institute.

The case contributed to the growing knowledge base about reporting sustainability initiatives at an organisation and managing them to aid in decision-making. The case called for better integration between sustainability activities and reporting under organisations’ Sustainable Development Goals (SDGs) or environmental, social and governance (ESG) reporting.

Case overview/synopsis

Ajay served as the head of the management department and a leading member of the sustainability initiatives at University Alpha, Delhi NCR, India. He was assigned the task of publishing the university’s annual report. The management had requested him to consider preparing a standalone sustainability report for the university.

He began the task by examining the benefits of standalone sustainability reporting. He proceeded to analyse the specifics of SDG reporting, SDG Accord reporting and ESG reporting using the Global Reporting Initiative guidelines. During discussions with a consultant, the necessary steps for creating an SDG-only report and an integrated SDG and ESG sustainability report were clarified.

Guidance from an expert led to an intention to use a result matrix in preparing the sustainability report and ongoing impact assessment of SDG initiatives for reporting. The dilemma involved deciding between continuing with the sustainability initiative listing in the annual reports or opting for a standalone sustainability report. Critical considerations concerning the sustainability impact assessment of SDG-related activities at an educational organisation were also explored.

Complexity academic level

This case is intended for discussion in the graduate-level program in strategy, general management, sustainability management, environmental management and environmental economics. The case may also be used for participants in executive program.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 September 2023

Lyal White, Pamela Fuhrmann and Ruth Crichton

The learning outcomes of this study are to assess the shared value model and elaborate on new multi-stakeholder approaches to business, where the stakeholders include the…

Abstract

Learning outcomes

The learning outcomes of this study are to assess the shared value model and elaborate on new multi-stakeholder approaches to business, where the stakeholders include the founders, investors, partners, employees, clients and the surrounding community; to consider the synergies between community development, environmental stewardship, sustainable business practices and the long-term health of organisations and communities, considering these as the new fundamentals of business; to examine the interconnectedness of vision, strategy, purpose and leadership in creating and evolving the shared value model; to explore the relationship between shared value practices and collective well-being, and a specific reference to nurturing transformative experiences through nature, personal development and community upliftment is made; and to assess Grootbos’ ability to translate their purpose and value proposition into a strategy and sustainable vision with a possibility of Grootbos achieving global impact through its evolving model, beyond the founder.

Case overview/synopsis

This case study explores the evolution of Grootbos Private Nature Reserve and Foundation, a luxury hospitality lodge and award-winning ecotourism destination, from humble beginnings in the Western Cape of South Africa to a global example of conservation, community, commerce sustainability and transformative experiences. The establishing of Grootbos and its growth and widespread recognition can be attributed to the vision and inspirational leadership of its founder, Michael Lutzeyer. Although much success has been achieved in conservation, community upliftment and individual development of community members within their region, Lutzeyer’s and ultimately, Grootbos’ vision extended well beyond South Africa and aspired to elevate their floral kingdom and model of development and conservation to a global platform of awareness. Although a shared value vision and strategy had transformed the business, placing Grootbos as a leader in transforming their industry and sparking an evolution in the shared value model itself through the interjection of transformative experiences, the larger question remained: How can Grootbos extend the impact, towards people and planetary well-being, beyond the scope of their individual place-based business and their industry? And in terms of the dilemma Lutzeyer and the management team at Grootbos faced: How will this vision and global ambition continue through succession, beyond Luzeyer’s personal drive at the helm?

Complexity academic level

Experienced leaders within a graduate degree program, executive Master of Business Administration (MBA) or executive education in the areas of leadership development, strategy, shared value and international business.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS4: Environmental management.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

1 – 10 of 38