Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 334
Applied filters:
Built Environment
Other subjects
Indian Institute of Management, Ahmedabad
Darden Business Publishing Cases
Emerging Markets Case Studies
Council of Supply Chain Management Professionals
Clear all
Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 13 February 2024

Edward D. Hess

In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best…

Abstract

In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best Buy had adopted a new business model, culture, and customer-segmentation template called Customer Centricity. This move created volatility in the price of Best Buy stock because of the higher-than-expected employee costs that went with this new way of doing business and the difficulty of executing the old and the new business models simultaneously while the new model was rolled out. Best Buy responded to Wall Street's short-term focus in a myriad of ways. It first asked for investor patience, and stressed the strong operating results achieved in Best Buy stores operating under the new model. But in June 2007, after the stock dropped again, the CEO knew he had to decide whether to open more Best Buy stores, increase the company's dividend, or increase the stock-repurchase program.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Rick Green

This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with…

Abstract

This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with hedging and option pricing, the instructor may choose to cover both cases in a single class period. It is the companion case to “J&L Railroad” [UVA-F-1053], and presents more technical issues regarding the hedging problem by requiring students to understand option-pricing principles. The board likes the CFO's hedging recommendations, but it wants a more careful analysis of the bank's prices for its risk-management products: the caps and floors. Besides demanding an understanding of option pricing, this case puts particular emphasis on the calculation and use of implied volatility.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Edward D. Hess

The Home Depot case is a great story. It's about entrepreneurship, growth, CEO leadership, and the dramatic impact, good and bad, a CEO can have on a company's growth culture…

Abstract

The Home Depot case is a great story. It's about entrepreneurship, growth, CEO leadership, and the dramatic impact, good and bad, a CEO can have on a company's growth culture, strategy, and performance. Home Depot had faced market growth challenges for the last seven years as it tried in numerous ways to reignite its growth engine. The case explores the growth strategies of CEOs Bernie Marcus, Arthur Blank, and Blank's successor Bob Nardelli, a former GE executive. After examining Home Depot's growth history, the case challenges students to devise a growth strategy for the company under a new CEO.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Edward D. Hess

Tiffany & Company was the leading U.S. luxury jewelry brand, generating more than $2.6 billion in revenue through 167 retail outlets globally and from catalogue and Internet…

Abstract

Tiffany & Company was the leading U.S. luxury jewelry brand, generating more than $2.6 billion in revenue through 167 retail outlets globally and from catalogue and Internet sales. For nearly 170 years, Tiffany had managed its brand. In February 2007, a hedge fund, Trian Fund Management LP, announced that it had bought a 5.5% stake in Tiffany, and became its largest shareholder. Trian believed that Tiffany was undervalued and stated that it wanted to help the company “improve its earnings per share by addressing various operational and strategic issues.” In response, Tiffany began to consider different actions to increase shareholder value.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Dana R. Clyman and Sherwood C. Frey

TourAmerica is negotiating a master contract with Voyager Inn International (Bethesda) for hotel rooms during the 1995 tourist season. Issues under consideration include number of…

Abstract

TourAmerica is negotiating a master contract with Voyager Inn International (Bethesda) for hotel rooms during the 1995 tourist season. Issues under consideration include number of rooms during peak, mid-, and off-periods, room rates, breakfast prices, and the cost of ancillary services. While the hotel manager is evaluated on the basis of several criteria, including adjusted daily rates, occupancy rates, and food and beverage profitability, and is also provided with a utility scheme to facilitate trade-offs among the criteria, TourAmerica uses an effective cost per registrant (adjusted for intangibles). These two approaches provide an opportunity to contrast measurement schemes and to justify the use of utility functions. This case is a role-play exercise and must be used in conjunction with “Voyager Inn International” (UVA-QA-0463).

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 7 December 2023

Chitra Singla and Bulbul Singh

Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as…

Abstract

Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as part of its inorganic expansion strategy, Tega bought a mill-liner company in South Africa. Buoyed by this growth, two acquisitions were made in Australia and Chile in the year 2011. However, post-acquisition, several managerial, legal and commercial problems crept up in its manufacturing facilities in Chile, leading to financial downturn in Tega's fortunes in 2016 and compelling it to either plan a revival or divest its interest in its Chilean Plant.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Amit Karna and Aarushi Tiwari

What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group…

Abstract

What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group. ETG was taken over by the then CFO Mahesh Patel after exit of the founding stakeholders. It was then when the company shifted its focus to being a key regional player. In the next 35 years, the company grew systematically. Business focus evolved when Patel saw an opportunity in logistics in remote sub-Saharan Africa. This was followed by business expansion with supply chain diversification and significant infrastructure investments. All the different businesses amalgamated under a single group for better operations and ease of scaling up. They were later divided into six separate verticals for better management. Vamara (FMCG vertical) was launched in 2018 as the company moved towards digitalisation — externally and internally. ETG plans to focus on new business opportunities and continue to diversify across geographies and portfolios.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Sundaravalli Narayanaswami and N Ravichandran

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college…

Abstract

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college peers, who conceptualized air-conditioned, industrial safety helmets. This innovative revolutionary product offered industrial workers not only safety but aesthetics and comfort. The founders hoped that the product could change the perception of safety helmets from mandatory wear to desired wear. The case details the production process, staffing, raw material required and procurement lead time.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

1 – 10 of 334