Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 153
Applied filters:
Built Environment
Other subjects
Council of Supply Chain Management Professionals
Emerging Markets Case Studies
Kellogg School of Management
The CASE Journal
Clear all
Case study
Publication date: 3 December 2024

Aditya Gulia and Jatin Pandey

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate the cost of turnover and design solutions to the problem of attrition and low satisfaction.

Case overview/synopsis

Pace Control Gears was a small-scale enterprise based out of Sonipat, India. It was an entrepreneurial venture by Rajesh Kumar, who had set Pace in 2010 to manufacture low-voltage electrical apparatus. Recently, Pace had begun to experience issues with quality control that were largely the result of human error. The company was facing a drop in satisfaction levels and higher attrition levels among the employees. Kumar had to find a solution quickly to address the problem, as it had direct implications for the company’s margins and the assurance of quality that it was associated with in the market.

Complexity academic level

This case study is suited to undergraduate and postgraduate courses in human resource management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 6: Human Resources Management.

Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Abstract

Details

The CASE Journal, vol. 20 no. 3
Type: Case Study
ISSN: 1544-9106

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 21 November 2022

Rebecca J. Morris

Abstract

Details

The CASE Journal, vol. 18 no. 6
Type: Case Study
ISSN:

Case study
Publication date: 28 March 2022

Arvind Shroff and Bhavin J. Shah

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its…

Abstract

Learning outcomes

Need for preventive health care: To comprehend the contribution of preventive health care in improving the health quotient. Sri Sathya Sai Sanjeevani Hospital (SSSSH) and its initiative is an apt example of the wonder which preventive care can bring in the context of rural health. Community participation: The case can be instrumental in showing the pathway to encourage community involvement in mainstream health by promoting the holistic model of SSSSH that understands mothers and children's health profile and needs, especially in the unreached rural segments of an emerging economy like India. Importance of healthy childhood: World Health Organization (WHO) promotes the school health programme to prevent health risks among children by inculcating healthy behaviours during childhood. The successful SSSSH model proves that it is implementable by integrating comprehensive health education modules in the existing institutions for medical care.

Case overview/synopsis

The challenge of a healthy childhood is inadequate availability and accessibility of quality care. Non-awareness of the parents is also a significant reason for the children who miss the benefit of a happy childhood. While much is planned by the Government and some part of it being executed, this case highlights the effectiveness of the maternal and child health programme executed by the Sri Sathya Sai Sanjeevani Hospital (SSSSH). This initiative fulfills the dire need of ensuring the preventive healthcare component leading to safe motherhood and safe birth of healthy children. Further, the case is also the culmination of pin-pointed innovative awareness activities such as school health screening and the Divine Mother and Child Health Program (DMCHP). It opens up the discussion on the current model of health care followed by SSSSH, Raipur, and its impact in the local areas to decide on its expansion across the country for nationwide implementation.

Complexity academic level

Bachelors in Business Administration, MBA, Executive MBA, Post Graduate Diploma in Healthcare Management

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 9 December 2021

Adrienn Tóth

This case focuses on organizational development, leadership and HR management questions.

Abstract

Subject area

This case focuses on organizational development, leadership and HR management questions.

Study level/applicability

This case is mainly aimed at students specialized in leadership, organizational development and HR, or in MBA and executive education. However, undergraduate students can benefit from it as well and learn about key terms related to organizational development and HR.

Case overview

Loxon Solutions is a Hungarian technology startup founded in 2000 that develops various software solutions for the banking industry to improve processes such as retail and corporate landing, collateral management and monitoring, among others. The company grew significantly since being founded, and from a small IT company it became a significant player in the banking software industry all around the world. However, with rapid extension comes a drastic internal transformation as well: Loxon now employs 252 people, has 5 physical offices in 2 different countries and is trying to balance an effective organizational structure and a friendly startup environment. It is clear that the company needs to adapt its previously informal structure to fit the now middle-sized organization while maintaining the current benefits of their culture. Also, they require stability and maturity which the current team consisting of mostly junior employees and the significant fluctuation cannot provide. Tamas Erni, the CEO and Kristof Farkas, the founder of Loxon are now working on these pressing issues with the company’s HR department to rethink the company’s organizational structure and policies as well as their hiring and employer branding strategies.

Expected learning outcomes

Students should get familiar with typical organizational structure models, the meaning of Employee Value Proposition and main KPIs related to hiring and employee retention.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 6: HR Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 10 of 153