Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 146
Applied filters:
Built Environment
Operations and Logistics
Emerging Markets Case Studies
Kellogg School of Management
The CASE Journal
Darden Business Publishing Cases
Clear all
Case study
Publication date: 6 November 2024

Pratik Rajendra Satpute, Gautam Surendra Bapat and Shefali Joshi

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the…

Abstract

Learning outcomes

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the various operational procedures used to enhance a smooth group check-in in hotels; use the steps defined in group check-in procedure to improve service efficiency in hotel operations; and examine and evaluate the optimal solution for a smooth group check-in for hotels.

Case overview/synopsis

“The Big Fat Indian Wedding” delves into the challenges faced by Hotel Plaza Blu, a business hotel in Pune, Maharashtra, in 2023. A big wedding group was arriving at the hotel, which comprised almost 350 adults and 120 children. Mr Parag Patil, the front office manager, had done all the preparations for group arrival but just one hour before the arrival Mr Suresh Menon, the group coordinator, came and informed that 150 additional guests would be arriving, as the other hotel, where arrangements for these guests were made, had a major electricity generator breakdown and the hotel was in complete blackout. Patil had the challenge of formulating an action plan to achieve a smooth group check-in with the last-minute changes.

Complexity academic level

Executive development programmes and graduate-level courses in non-profit hospitality and tourism management might benefit from this case study. The operational management courses in the BBA, UG management programmes might all benefit from using this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 October 2024

Niaz Ahmed Bhutto, Abdul Rehman Shaikh and Sanober Shaikh

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the…

Abstract

Learning outcomes

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the procurement of services; evaluate the potential risks and challenges associated with relying on a single vendor for critical services; apply the four-stage model of crisis management to the breach of contract by Fresh Bites Catering; examine how adopting sustainable procurement practices, such as diversifying suppliers and establishing contingency plans, can mitigate these risks and ensure business continuity; and analyze the dynamics, roles and potential conflicts between the principal (Multan University) and agent (Fresh Bites Catering) using the principal–agent theory (PAT).

Case overview/synopsis

This case study explores the challenges and implications of sustainable procurement within the context of Multan University’s cafeteria services. It delves into the sudden contract breach by Fresh Bites Catering, a long-time partner responsible for providing central cafeteria services, and examines the resulting operational crisis faced by the university. This case study highlights key procurement processes, including vendor selection, contract management and adherence to sustainability principles, as well as the risks associated with single-vendor dependency. By applying frameworks such as the PAT, the four-stage model of crisis management and sustainable procurement practices, this case study encourages students to critically assess the failures in contract enforcement, risk mitigation and service continuity. Additionally, it stimulates discussion on the benefits of robust risk management strategies, multi-vendor approaches and clear contract terms to prevent future disruptions in essential services. This case study serves as a valuable tool for understanding how procurement strategies influence organizational performance and long-term sustainability in higher education institutions.

Complexity academic level

This is a decision-making case and can be taught in Master of Business Administration courses in purchase and supply management and operations management. This case study is mainly written to make students understand and analyze the potential risks of a single vendor, the benefits of diversifying suppliers and sustainable procurement.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 September 2024

Rajkumari Mittal, Parul Sinha and Bikramjit Rishi

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions…

Abstract

Learning outcomes

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions, the students will be able to:▪ Understand the transformation of rural retail from traditional models to organized modern retail;▪ Understand the opportunities and challenges of rural markets with specific reference to automobile products;▪ Identify and evaluate the various distribution channels available for rural markets; and▪ Devise a suitable rural-centric distribution model for automobile products following an appropriate logistics system.

Case overview/synopsis

Manan Motors, a dealership of Honda Motorcycle & Scooter India (HMSI) Private Limited in Hathras City of Uttar Pradesh province in India, has been operating successfully for the past two decades. Mr Manoj Bansal, the director at Manan Motors, was primarily targeting the urban markets with 60% dependency on the scooter portfolio of HMSI. But multiple pressures like stringent vehicle emission norms, price rise of two-wheelers and the impact of the pandemic took a toll upon the urban business of Honda Motorcycle and Scooter India Limited and subsequently upon Manan Motors. The sales for HMSI dipped from 15,121 million units in 2020–2021 to 13,466 million units in 2021–2022. Consequently, Bansal decided to alter the business strategy of Manan Motors and shift its focus from the urban to the rural territory of Hathras, where it could foresee demand for entry-level two-wheelers (engine capacity between 75 and 110 cc). Rural markets were developing, so Bansal realized that supplying a low-cost, low-end model to the rural Indian market was an opportunity for his dealership. Bansal’s decision to focus on the rural vertical of its two-wheeler business stirred several questions that floated in his mind. Should they manage distribution on their own, or through some channel members, or should they follow a rural-specific modern retail model?

Complexity academic level

The case study is designed for use by a postgraduate or executive-level audience for subjects such as sales and distribution management, distribution management and rural marketing. Students will understand the concept of distribution management and associated keywords specific to rural markets. The case study provides an opportunity to discuss and decide how a company can penetrate the rural market and also discusses the opportunities and challenges of rural distribution.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 18 July 2024

Abdul Rehman Shaikh, Manzoor Ali Mirani and Saqib Ali

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand ABC analysis and develop a systematic approach using PDCA, analyze processes, technology, employee training and supplier relationships when analyzing shrink and developing solutions, evaluate how technology improves production inventory control and visibility and recognize the importance of fostering a culture of employee accountability and ownership to minimize inventory loss and improve overall operational efficiency.

Case overview/synopsis

On June 2, 2023, sitting in his office in Karachi, Pakistan, Khan Aamir, the manager of store and inventory at Euro Manufacturing, found himself immersed in a cloud of confusion. The incessant loss of inventory items, particularly the nut bolts and small accessories, had become a perplexing challenge. To address these losses and provide a cycle count report to the director of supply chain, Aamir, manager of store and inventory, was given the responsibility to take action. He was looking for a comprehensive approach to address the current problems and prevent further losses in the future. This case study examines the various reasons for the losses, including theft, inadequate inventory control methods, human error and problems with suppliers. It highlights the importance of established procedures, the use of technology (such as barcode scanning, radio-frequency identification tagging and inventory management software) and the cultivation of a culture of accountability among employees.

Complexity academic level

This case study is developed for class discussion in the course of operations management or supply chain management. This case study is suitable for use with undergrad students. This case study can be taught in a module on operations management or supply chain management, as part of a broader course in business management or industrial engineering.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 June 2024

Sumanth Pramod Desai, Sushil Pare, Sanjay Hanji and M.M. Munshi

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load…

Abstract

Learning outcomes

After completion of the case study, the students will be able to appraise the importance of different methods of location planning in warehouse selection, analyze the load distance values for warehouse location and choose the optimum location based on the load distance analysis.

Case overview/synopsis

DB Builders, a prominent Indian construction company, faced a crucial decision in selecting an ideal storage warehouse for a project involving 100 flats spread across five locations. Mr Vijay Kumar, an experienced material handling expert, was entrusted with this task as part of transitioning the company’s material allocation system toward centralization. Using practical travel distances, Kumar meticulously scouted four potential warehouse locations. The selection process hinged on three primary factors: load, distance to apartment sites, safety and cost of the premises, each carrying specific weightage. The project planning department provided scores for safety and cost, helping evaluate the options. This unique challenge arises due to varying material requirements across the apartment locations, demanding an efficient warehouse planning. The selection of the optimal storage warehouse holds paramount importance in facilitating the smooth execution of these larger projects. Kumar’s expertise and strategic decision-making are pivotal in ensuring a seamless transition toward centralized material handling, which is essential for the company’s future success.

Complexity academic level

This teaching activity is aimed at introductory/basic courses in Bachelors and Masters of Business administration.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 11 December 2023

Bishal Dey Sarkar, Prasad Vasant Joshi and Nisarg Shah

After completion of the case study, students will be able to understand the concept of clustering and identify clusters for improving capacity utilization, analyse transport…

Abstract

Learning outcomes

After completion of the case study, students will be able to understand the concept of clustering and identify clusters for improving capacity utilization, analyse transport routes to optimize logistics resources, analyse the impact of a full truckload on resource optimization, evaluate unused capacity and ascertain the impact of reverse milk run to reduce the same and apply clustering and reverse milk run to optimize the logistics resources.

Case overview/synopsis

The case study is about a freight forwarding company that offered end-to-end logistics solutions for the exporters based in India. Within a short time span, the company became one of the sought-after service providers for its clients. However, when the company planned to expand its business by expanding its client base, the efficiencies reduced and hurt the profitability of the company. It was all excellent with the limited number of clients, but as the number of distantly located clients surged, the operating costs increased. Trucks were running with partial loads, thus reducing efficiency. The rate of increase in cost surpassed the rate of revenue every time. The cost per mile of transportation was on the rise. The surging fuel prices were adding to the heat. In spite of being one of the first choices for clients, the company could not generate good profit margins. If they chose to increase prices, the company would have lost customers to the cheaper unorganized players in the market. It was time to choose between growth and survival. The company could not sustain itself without devising a mechanism to reduce costs. The company would not have sustained itself without devising a mechanism to reduce costs. To sustain in the business, the company had to device a mechanism to reduce costs. Whether to continue operating the conventional way or to transform? Was there a logistics strategy that would have improved transportation efficiency and reduced the costs for the company?

Complexity academic level

The case study is suitable for teaching post-graduate management courses in operations and logistics, supply chain management and supply chain analytics, as well as entrepreneurship-related courses.

Supplementary material

Teaching notes are available for educators only.

Subject code

CCS 9: Operations and logistics.

Case study
Publication date: 13 November 2023

Ann Mary Varghese, R. Sai Shiva Jayanth, Remya Tressa Jacob, Abhishek Srivastava and Rudra Prakash Pradhan

The learning outcomes of this case study are to understand the business model canvas and value propositions and apply advanced business innovation tools in electric vehicle…

Abstract

Learning outcomes

The learning outcomes of this case study are to understand the business model canvas and value propositions and apply advanced business innovation tools in electric vehicle business models; evaluate the current cargo vehicle scenarios at national and global levels and draw out the possibilities and costs for a new player; extrapolate the future scenario of the cargo economy, its electrification and positioning in a business-to-business (B2B) and business-to-customer (B2C) segment, especially for a developing economy; and improve the student’s ability to get organisational buy-in and execute new business models.

Case overview/synopsis

LoadExx is a fully electrified electric cargo service focusing on logistics in Kolkata, a metropolitan city in the eastern part of the country. The service of LoadExx commenced in January 2021 in the B2B segment after overcoming its then issues of driver hesitancy and customer anxiety and financial issues to adopt electrified cargo systems. The conundrum faced by LoadExx in its commencement thus had been solved under the able guidance of its owner Amit Arora. The case study was positioned four months after the commencement of LoadExx. To gain market power and traction, Arora and his team came up with the idea of market expansion. However, the current conundrum was whether LoadExx would enter the B2C segment in its current location or expand with the same business model to other parts of the country. The expansion was to be implemented in the immediate future to retain its rarity and reduce the imitability of the business model of LoadExx. This case study details the logistics and market operations of the cargo sector, especially electric cargo, in a developing economy, especially India. A teaching note supplementing the “Cracking the conundrum of e-cargo logistics: curious case of LoadExx” case study has been provided.

Complexity academic level

This case study is designed for undergraduate and postgraduate students and senior management professionals in executive education programmes undertaking courses in logistics management and supply chain operations and related cargo logistics courses. This case study denotes integrating key processes from end-users and gaining the trust of drivers, thereby showing the perspective of the plight and conundrums of a cargo aggregator working in the B2C segment. This case study could be used to discuss concepts related to not-for-profit firms, aggregators, policymakers and think tanks.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 31 October 2023

Vardhan Mahesh Choubey, Prasad Vasant Joshi and Yashomandira Pravin Kharde

This case study would help students in understanding the dynamics of logistics and logistics vendor roles and contributions to overall business operations. The case study covers…

Abstract

Learning outcomes

This case study would help students in understanding the dynamics of logistics and logistics vendor roles and contributions to overall business operations. The case study covers real-time information for applying the theoretical knowledge students gain related to the selection of logistics vendor. It would help students to understand and evaluate the dynamics of a new start-up related to cost, profits and dependency; understand and analyze the importance of third-party logistics (3PL) service providers in the supply chain; become aware of the key performance indicators (KPIs) important in the selection of logistics vendor; and develop and create measures for selecting logistics vendors on the basis of KPIs.

Case overview/synopsis

This case study was about an innovative start-up operating in the field of organic edible oils. The company catered to end consumers with its indigenous technology and processes. The innovative and healthy products were appreciated by the consumers, as was reflected in the surging demand figures. With the increasing popularity of organic products, the orders were surging. At the same time, issues such as damaged product delivery, increased cost per delivery of small packages and failure to deliver because of unserved pin codes by their logistics partners were being faced by the company. The case discusses the dilemma faced by the protagonist regarding the selection of the right 3PL partner. The case study is suitable for teaching courses in operations and logistics, supply chain management and entrepreneurship-related courses.

Complexity academic level

This case study is appropriate for postgraduate courses in entrepreneurship, operations management, logistics and supply chain management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS9: Operations and logistics.

1 – 10 of 146