Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of 199
Applied filters:
Built Environment
Management Science
Tourism and Hospitality
Emerging Markets Case Studies
Darden Business Publishing Cases
The CASE Journal
Kellogg School of Management
Clear all
Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 14 November 2024

Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…

Abstract

Learning outcomes

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.

Case overview/synopsis

Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.

Complexity academic level

The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 16 August 2024

Ujjal Mukherjee

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…

Abstract

Learning outcomes

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.

Case overview/synopsis

The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.

Complexity academic level

This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 23 April 2024

Rekha Attri

After completion of the case study, the participants would be able to understand the challenges in building a sustainable homestay tourism business; develop a positioning…

Abstract

Learning outcomes

After completion of the case study, the participants would be able to understand the challenges in building a sustainable homestay tourism business; develop a positioning statement for La Pinekonez which builds a unique competitive advantage; and outline elements of the business strategy to profitably sustain and grow a sustainable tourism homestay in terms of service offering, pricing, marketing and operations.

Case overview/synopsis

La Pinekonez Homestay, located in the beautiful region of Himachal Pradesh, India, is the subject of this case study, which explores both its successes and its difficulties. In August 2022, Arvind, the dedicated sole proprietor of La Pinekonez, grappled with multifaceted challenges, the first being the foray of established hotel chains into the homestay business. As the protagonist, was is in dilemma of preserving La Pinekonez’s unique identity amidst corporate competitors, particularly with regards to differentiating from the expanding hotel chains. The clash between customer expectations for hotel-like amenities and the homestay’s commitment to sustainable tourism presented a crucial challenge. Negative reviews questioning the authenticity of La Pinekonez’s green initiatives heightened the complexity. Adding to Arvind’s predicament were the seasonal fluctuations in tourist inflow and his aspiration to embrace immersive tourism trends. This case study facilitates exploration of strategic positioning, sustainability management and marketing strategies in the dynamic and competitive hospitality industry. It also offers insights into the complexities of balancing differentiation, customer satisfaction and sustainability while navigating the evolving landscape of tourism trends.

Complexity academic level

This case study is suitable for students of tourism and hospitality management at postgraduate level. The case study can be discussed once the basic concepts of hospitality management and service dimensions are covered.

Supplementary material

Teaching notes are available for educators only.

Subject code

CCS 12: Tourism and hospitality.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 15 April 2024

Anh Dung Vu, Kyunghwa Chung and Ha Kyung Lee

This case study provides in-depth, practical knowledge to develop business strategies for the management program. After reading this case study, the students will be able to learn…

Abstract

Learning outcomes

This case study provides in-depth, practical knowledge to develop business strategies for the management program. After reading this case study, the students will be able to learn about the challenges and problems that service firms face during a crisis, the drastic changes in the market environment due to a crisis and the analysis tools that can be used when analyzing the shifted market environment. By analyzing this case study, students will be trained for the decision-making that arises in the process of crisis management in the hotel industry.

Case overview/synopsis

Nam Nghi Resort, situated on the picturesque Phu Quoc Island in Vietnam, experienced the tumultuous period of the COVID-19 pandemic. Before the pandemic, Nam Nghi was a thriving five-star resort, deeply rooted in Vietnamese culture and renowned for its luxurious amenities and breathtaking location. However, the onset of COVID-19 brought unprecedented challenges to the hospitality industry, leading to a sharp decline in tourism and revenue. Despite the adversity, Nam Nghi implemented risk management practices successfully and displayed resilience and adaptability. Through rigorous cost minimization, strategic facility upgrades and targeted marketing efforts, Nam Nghi managed to navigate the crisis and gradually rebuild its business as travel restrictions eased. As the industry began to show signs of recovery, the general manager faced new challenges in restoring the resort’s prepandemic vitality. The challenge remained of understanding changing consumer values and market dynamics.

Complexity academic level

This case study can be used as class material for Master of Business Administration (MBA) students. In particular, MBA students in the hospitality industry such as hotels, resorts, travel agencies and restaurants are the target audience.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 12: Tourism and hospitality.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 13 February 2024

Pratik Satpute and Gautam Surendra Bapat

The learning outcomes of this study are to recall the fundamental concept of revenue management in the hotel industry (remembering); explain the various performance measures used…

Abstract

Learning outcomes

The learning outcomes of this study are to recall the fundamental concept of revenue management in the hotel industry (remembering); explain the various performance measures used to evaluate room revenue in hotels (understanding); use revenue management strategies to improve room revenue in hotel operations (applying); and examine and evaluate the optimal solution for revenue enhancement, considering factors such as capacity management, duration control and differential pricing (analyzing).

Case overview/synopsis

This case study delves into the challenges faced by Hotel King’s Cross, a business hotel located in Pune, Maharashtra, in the year 2022. A week before Christmas Eve, Soham Dande, the hotel’s revenue manager, sought a meeting with Rohan Chopra, the director of sales and marketing, to discuss “revenue optimization for the hotel.”

During their meeting, Dande mentioned that the hotel had fallen behind its budgeted room sales targets for 2022 across various metrics, such as room booking nights, occupancy percentage, average room rate and revenue per available room. Furthermore, the hotel was trailing behind its competitors. The situation was compounded by the management’s decision to raise the targets for 2023 by 5%–7%, factoring in upcoming events, competitive performance and pandemic-related losses over the past two years. Chopra faced the dilemma of formulating an action plan to achieve the ambitious 2023 targets and establish Hotel King’s Cross as a market leader.

Complexity academic level

Students undertaking executive development programs and graduate-level courses in non-profit hospitality and tourism management, as well as revenue management courses in the executive MBA, management development and graduate MBA programs, may all benefit from this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS12: Tourism and hospitality.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 4 July 2023

Shashi Kant Srivastava

The case delves into the significant factors contributing to the steep decline of Sintex shares, examining both external and internal factors. Internally, the primary drivers were…

Abstract

Research methodology

The case delves into the significant factors contributing to the steep decline of Sintex shares, examining both external and internal factors. Internally, the primary drivers were the expansion plan, the demerger decision, financial mismanagement and the delayed and inadequate integration of Information Technology (IT) into the business.

Case overview/synopsis

Sintex, a prominent private sector company listed in the Indian stock markets, operated in the textile and plastics sectors. However, in 2017, Sintex underwent a demerger into two separate entities: Sintex Industries Limited (SIL) and Sintex Plastics Technology Limited (SPTL). While SIL focused on textiles, SPTL dealt with plastics. However, soon after the demerger, the share prices of both companies began plummeting, leading to significant losses for investors. This case investigates the reasons behind this decline through a step-by-step analysis.

Complexity academic level

This case is suitable for postgraduate students pursuing an MBA, MMS and executive programs such as PGDBM and PGDM, with a specialization in business strategy. It is also beneficial for participants in management development programs (MDPs) designed for higher level executives. Additionally, the case can serve as training material for executives undergoing strategic role training within an organization. It is recommended to teach the case toward the end of the course, where the instructor can provide a summary of the previous classes’ teachings.

Subject Code

CCS7: Management Science

Details

The CASE Journal, vol. 20 no. 1
Type: Case Study
ISSN: 1544-9106

Keywords

1 – 10 of 199