Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…
Abstract
Learning outcomes
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.
Case overview/synopsis
In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.
Complexity academic level
The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS2: Built environment
Details
Keywords
Irfan Saleem, Muhammad Ashfaq and Shajara Ul-Durar
After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict…
Abstract
Learning outcomes
After completion of the case study, students will be able to learn, understand, examine and customize leadership styles per organizational culture; understand the conflict management styles of a female leader; and comprehend the organizational change process to devise an effective communication strategy.
Case overview/synopsis
Ever-changing business demands managers adopt organizational change in leadership styles, business processes, updated skill sets and minds. One must be ready to understand influential nurtured corporate culture and human resource resistance towards the inevitable change. This case study attempted to discuss the female protagonist dealing with an organizational conflict. The case study introduces one such protagonist from a century-old woman’s educational institution. Subsequently, this case study presents organizational change under the leadership of a female protagonist. This teaching case study gives the reader an insight into situational leadership, conflict management styles and the corporate change process by implementing an appropriate communication strategy. This case study describes the change process through the various decision-making scenarios that an academic institute over a century old faced during the post-pandemic crisis after adding a crucial protagonist. The employee union, followed by students and administrative employees, has challenged the dominating leadership position held by the college principal. Protests occurred due to the college administrator’s refusal to adjust her approach to leadership. This teaching case then provided different leadership styles of the current and old leaders. Finally, the case study lists the challenges a leader faces during turbulent times and the lessons a leader should learn from such situations while transforming the institute.
Complexity academic level
The teaching case benefits undergraduate students in business management subjects such as conflict management, leadership and organizational behaviour. Nevertheless, trainers can use this case study to teach seasoned managers and emerging leaders the significance of adopting and implementing change while understanding situational leadership.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 10: Public Sector Management.
Details
Keywords
Eduardo Russo and Ariane Roder Figueira
Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of…
Abstract
Learning outcomes
Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of the main biases that affect making decisions in environments of high uncertainty; and build and apply judgment models to support decision-making processes.
Case overview/synopsis
Motivated by recent international events responsible for causing supply shock and great volatility in the price of imported fertilizers, Brazil, which in 2022 was responsible for producing only 15% of all the fertilizer consumed by its agribusiness, ran against time by launching a new national fertilizer plan (PNF). The plan proposed to boost Brazil’s national fertilizer industry to fulfil a long-term vision of reducing the country’s external dependence by 2050. While awaiting the first results of the PNF, this case study casts the student participants in the role of Breno Castelães, chief advisor of the special secretariat for strategic affairs of the presidency of the republic, whose role is to recommend the country’s position in the face of external pressures to adopt international embargoes of Russian fertilizers because of its war with Ukraine.
Complexity academic level
This case study is suitable for undergraduate and graduate students of business administration and public management courses who want to deal with topics such as public policy, judgment and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 10: Public sector management.
Details
Keywords
Arpita Agnihotri and Saurabh Bhattacharya
Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for…
Abstract
Social implications
Case explains how female leaders are more concerned about social issues the industry in which they operate could resolve. Obo-Nia, CEO of Vodafone Ghana, showed concern for resolving the digital divide in Africa and offered a collaborative solution. The case also suggests how female CEOs invest in strategic corporate social responsibility (CSR) that could create a competitive advantage for firms. The case also discusses gender diversity issues in the science, technology, engineering and math (STEM) field and how Vodafone Ghana’s CEO tried to enhance gender diversity in the telecommunication sector and Vodafone. Obo-Nai did not emphasize gender diversity from a CSR perspective but believed in a business case for gender diversity, as an increase in participation of women in the STEM workforce could help the telecommunication sector innovate faster and resolve the digital divide challenge while also empowering women working from the informal sector.
Learning outcomes
What is the significance of a digital divide and the societal role of the telecommunication sector; Why female CEOs are more concerned about CSR and how CSR makes not charity but business case; Why female CEOs are more inclined toward collaborative strategies and how stakeholders are involved in collaborative strategies for reducing the digital divide; Exploring various strategies for enhancing gender diversity in the STEM field and the significance of gender diversity in the STEM field.
Case overview/synopsis
The case is about the challenges faced by Patricia Obo-Nai, the first female CEO of Vodafone Ghana, to bridge the digital divide in Africa while doing so in a profitable manner. Obo-Nai was an engineer by profession and won several awards as she rose to the post of CEO in Vodafone Ghana in 2019. During the COVID-19 pandemic, she took several corporate social responsibility (CSR) initiatives, such as making internet service freely available in certain schools and universities so that education could continue. Obo-Nai also emphasized gender diversity within Vodafone and urged other telecommunication players to focus on gender diversity from a social responsibility perspective because it was essential for innovation. Under Obo-Nai’s leadership, Vodafone itself launched several new products. She called for a multistakeholder collaborative approach to bridge the digital divide and to make 4G internet affordable in Africa. Obo-Nai collaborated with competitors like MTN Ghana to enhance Vodafone Ghana’s roaming services.
Complexity academic level
This case is intended for undergraduate or graduate-level business and management courses, especially international business and society, CSR and leadership courses. Graduate students in public policy may also find the case compelling.
Supplementary materials
Teaching notes are available for educators only.
Subject codes
CCS5: International Business; CCS10: Public Sector Management
Details
Keywords
This case talks about the role that can be expected to be played by a disabled woman in an organization and shows how a disabled woman can assume a leadership position and be a…
Abstract
Social implications
This case talks about the role that can be expected to be played by a disabled woman in an organization and shows how a disabled woman can assume a leadership position and be a role model.
Learning outcomes
This case identifies the qualities that help a person from a minority group succeed in the corporate environment; examines the contribution that a disabled person, especially a woman can make to an organization; analyzes transformational leadership; assesses the importance of inclusive design in today’s products; and recognizes the corporate role in ensuring an inclusive culture that encouraged disabled people.
Case overview/synopsis
The case “Sumaira Latif at P&G: pioneering inclusive design and accessibility to all” provides an in-depth look at the efforts of Sumaira “Sam” Latif (she), Accessibility Leader at P&G, to incorporate inclusive design in the company’s product packaging. Sam – a blind woman and mother of three – had always struggled to use various everyday products. Her personal struggles drove her to find ways to fix such problems for people with disabilities. So, after a decade of experience at P&G, when she got an opportunity to interact with the top management, she convinced them that catering to the disabled was not charity, but a smart business move. Sam also put forth the role she could play in helping P&G make products with an inclusive design. Impressed with her, P&G made her Special Consultant for Inclusive Design, a position specifically created for her. Sam created the widely lauded tactile indicators which helped the blind differentiate between shampoo and conditioner bottles. P&G then promoted her to the position of Company Accessibility Leader, wherein she played a pivotal role in bringing inclusive design to more of P&G’s products. Sam also played a critical role in making P&G adopt certain technologies to help the blind shop for the company’s products independently, apart from ensuring that all P&G ads were audio-described. However, Sam had an ambitious vision to infuse inclusive design into all products, which required her to bring about a culture change in the CPG industry. She was also faced with the predicament of how to ensure that audio-described ads became a media buying standard, considering the wide-scale resistance to it. How can Sam succeed in making the CPG industry develop inclusive design, the way she convinced P&G to do it?.
Complexity academic level
Graduate and post-graduate programs.
Supplementary materials
Supplementary materials Teaching Notes are available for educators only.
Details
Keywords
Prashanth Kumar Sreram and Savitha Chilakamarri
The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…
Abstract
Learning outcomes
The learning outcomes of this study are as follows:
1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;
2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and
3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.
Case overview/synopsis
On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.
Complexity academic level
Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 2: Built environment.
Details
Keywords
Cecilia Malila, Preeya Daya and Geoff Bick
This teaching case covers aspects of leadership development, strategy, change management, organisational behaviour, and people management. The case explores the following themes:
- …
Abstract
Subject area of the teaching case:
This teaching case covers aspects of leadership development, strategy, change management, organisational behaviour, and people management. The case explores the following themes:
Workplace transformation and culture: the challenges and opportunities of remote/hybrid work in large government enterprises and maintaining the culture when moving remote
Leadership and change: the different perspectives that a leader can take into consideration when leading the business during turbulent and uncertain times and managing the change process in large organisations
Strategic decision-making: the application of analytical skills by senior management when making strategic decisions in a business
Workplace transformation and culture: the challenges and opportunities of remote/hybrid work in large government enterprises and maintaining the culture when moving remote
Leadership and change: the different perspectives that a leader can take into consideration when leading the business during turbulent and uncertain times and managing the change process in large organisations
Strategic decision-making: the application of analytical skills by senior management when making strategic decisions in a business
Student level:
The primary audience for this teaching case is management education programmes including: Master of Business Administration (MBA), Postgraduate Diploma (PGDip), specialist Masters in Management, and certain Executive Education programmes.
Brief overview of the teaching case:
This case deals with a public-sector entity that collects taxation revenue for the South African government. In 2020, the operations of this public entity are severely affected by the Covid-19 pandemic. The mandatory shift of the workforce from in-office to a remote work-from-home set-up, results in the entity switching to a hybrid work model in order to achieve its goals as an essential service. Protagonist Dr Zanele Twazi, executive head of the public entity's research department, is tasked by the commissioner to conduct a review on the hybrid work model. As the commissioner is also in the process of reviving the organisational culture to regain public trust following multiple corruption scandals, the pandemic adds to this pressure. Dr Twazi must share employee feedback on the remote work option. Meanwhile, the leadership team has to decide if the work model will serve this public entity in achieving its strategy, and from an organisational culture viewpoint, if it is the best fit for the future.
Expected learning outcomes:
The key learnings from this case include the following:
Organisational work model: A suitable work model is dependent on the organisational mandate as well as its culture.
Culture and organisational goals: An organisational work model additionally impacts the future sustainability of the organisation and its ability to achieve its short- and long-term goals.
Change management framework: For teams to effectively adapt to a hybrid work model, managers have to be empowered to lead and be able to facilitate the change.
Organisational work model: A suitable work model is dependent on the organisational mandate as well as its culture.
Culture and organisational goals: An organisational work model additionally impacts the future sustainability of the organisation and its ability to achieve its short- and long-term goals.
Change management framework: For teams to effectively adapt to a hybrid work model, managers have to be empowered to lead and be able to facilitate the change.
Details
Keywords
At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…
Abstract
Learning outcomes
At the end of the case students will be able to:
1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.
2. Determine high-level risks by articulating the WBS and RBS of a construction project.
3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.
4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.
Case overview/synopsis
MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.
Complexity academic level
The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business