Case study
Publication date: 14 November 2024

Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…

Abstract

Learning outcomes

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.

Case overview/synopsis

Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.

Complexity academic level

The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 16 August 2024

Ujjal Mukherjee

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial…

Abstract

Learning outcomes

The primary learning objectives/outcome of case discussion is to apply design thinking principles to design innovative and socially responsible strategies that promote financial sustainability for organizations serving unique societal needs. The secondary learning objectives/outcome of case discussion is to gain a deeper appreciation for the potential social impact of their innovative ideas and understand the complexities and ethical considerations in social entrepreneurship, especially when working with individuals with special needs.

Case overview/synopsis

The case study describes the challenge facing Anil Kumar Kundra, the founder and trustee of Autism Ashram and Autism Guardian Village in Hyderabad and Gujarat, an organization that provides shelter and care for individuals with autism and residential facilities for their parents. Autistic individuals often lack social skills and may face challenges in reading, writing and communicating. In addition, they may experience behavioral issues, making it difficult for them to obtain employment or run their own ventures, resulting in a lifetime financial dependency on their guardians. In August 2023, Kundra, in pursuit of sustainability, aims to empower autistic individuals in the ashram to attain financial independence. He envisions Autism Ashrama as a self-sustaining entity, no longer dependent on contributions from parents. The dilemma facing Kundra is the need to identify innovative ideas that will enable these autistic individuals to contribute to revenue generation. The challenges faced by autistic individuals in their day-to-day lives make Kundra’s decision-making complex. While he acknowledges the challenge, he firmly believes that a handful of transformative ideas can bring about a revolutionary shift in the ecosystem for autistic individuals, rendering this business model truly sustainable. The case study invites students to help Kundra identify innovative ideas using design idea techniques, such as the Stanford d.school model.

Complexity academic level

This take-home assignment is suitable for both undergraduate and postgraduate students and is designed to explore the integration of sustainable business practices and design thinking in a real-world context.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 June 2024

Sunil Kumar and Ravindra Shrivastava

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…

Abstract

Learning outcomes

After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.

Case overview/synopsis

In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.

Complexity academic level

The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS2: Built environment

Case study
Publication date: 13 February 2024

Edward D. Hess

In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best…

Abstract

In 2007, Best Buy was the leading electronics retailer in the United States with more than 941 stores, revenue totaling $31 billion, and a market cap of $21 billion. In 2005, Best Buy had adopted a new business model, culture, and customer-segmentation template called Customer Centricity. This move created volatility in the price of Best Buy stock because of the higher-than-expected employee costs that went with this new way of doing business and the difficulty of executing the old and the new business models simultaneously while the new model was rolled out. Best Buy responded to Wall Street's short-term focus in a myriad of ways. It first asked for investor patience, and stressed the strong operating results achieved in Best Buy stores operating under the new model. But in June 2007, after the stock dropped again, the CEO knew he had to decide whether to open more Best Buy stores, increase the company's dividend, or increase the stock-repurchase program.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Rick Green

This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with…

Abstract

This short case could be handed out at the end of class discussion on “J&L Railroad” [UVA-F-1053] in preparation for the following class, or if students are more experienced with hedging and option pricing, the instructor may choose to cover both cases in a single class period. It is the companion case to “J&L Railroad” [UVA-F-1053], and presents more technical issues regarding the hedging problem by requiring students to understand option-pricing principles. The board likes the CFO's hedging recommendations, but it wants a more careful analysis of the bank's prices for its risk-management products: the caps and floors. Besides demanding an understanding of option pricing, this case puts particular emphasis on the calculation and use of implied volatility.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Edward D. Hess

The Home Depot case is a great story. It's about entrepreneurship, growth, CEO leadership, and the dramatic impact, good and bad, a CEO can have on a company's growth culture…

Abstract

The Home Depot case is a great story. It's about entrepreneurship, growth, CEO leadership, and the dramatic impact, good and bad, a CEO can have on a company's growth culture, strategy, and performance. Home Depot had faced market growth challenges for the last seven years as it tried in numerous ways to reignite its growth engine. The case explores the growth strategies of CEOs Bernie Marcus, Arthur Blank, and Blank's successor Bob Nardelli, a former GE executive. After examining Home Depot's growth history, the case challenges students to devise a growth strategy for the company under a new CEO.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Edward D. Hess

Tiffany & Company was the leading U.S. luxury jewelry brand, generating more than $2.6 billion in revenue through 167 retail outlets globally and from catalogue and Internet…

Abstract

Tiffany & Company was the leading U.S. luxury jewelry brand, generating more than $2.6 billion in revenue through 167 retail outlets globally and from catalogue and Internet sales. For nearly 170 years, Tiffany had managed its brand. In February 2007, a hedge fund, Trian Fund Management LP, announced that it had bought a 5.5% stake in Tiffany, and became its largest shareholder. Trian believed that Tiffany was undervalued and stated that it wanted to help the company “improve its earnings per share by addressing various operational and strategic issues.” In response, Tiffany began to consider different actions to increase shareholder value.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Case study
Publication date: 13 February 2024

Dana R. Clyman and Sherwood C. Frey

TourAmerica is negotiating a master contract with Voyager Inn International (Bethesda) for hotel rooms during the 1995 tourist season. Issues under consideration include number of…

Abstract

TourAmerica is negotiating a master contract with Voyager Inn International (Bethesda) for hotel rooms during the 1995 tourist season. Issues under consideration include number of rooms during peak, mid-, and off-periods, room rates, breakfast prices, and the cost of ancillary services. While the hotel manager is evaluated on the basis of several criteria, including adjusted daily rates, occupancy rates, and food and beverage profitability, and is also provided with a utility scheme to facilitate trade-offs among the criteria, TourAmerica uses an effective cost per registrant (adjusted for intangibles). These two approaches provide an opportunity to contrast measurement schemes and to justify the use of utility functions. This case is a role-play exercise and must be used in conjunction with “Voyager Inn International” (UVA-QA-0463).

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation