1 – 10 of over 1000Hong Anh Vu, Viet Hung Cu, Lian Xing Min and Jian Qiong Wang
As in other developing countries, increased highway development in Vietnam provides enormous opportunities for international construction companies (ICCs). However, a prolonged…
Abstract
Purpose
As in other developing countries, increased highway development in Vietnam provides enormous opportunities for international construction companies (ICCs). However, a prolonged schedule delay (SD) can have an extremely detrimental impact on a project’s efficiency, cost and investment reputation. The purpose of this paper is to identify potential SD risk factors in international highway projects (IHPs) in Vietnam, and to explore the effects of and influences on such factors. A specific risk management framework is proposed as a useful tool for ICCs.
Design/methodology/approach
A system of SD risk indicators is presented for IHPs in Vietnam through a questionnaire survey. The system comprises 50 indicators that are grouped into 12 main factors. A structural equation model (SEM) is then used to assess the influences and mechanisms of these factors. Based on the obtained results, corresponding suggestions for preventing SD risks are presented and discussed.
Findings
First, among the 12 aforementioned major factors, the authors identify eight facors that have significant effects on IHP SDs. Second, the SEM analysis reveals that policy flaws and the fiscal ability of the owner play the most important roles, on account of their direct and indirect influences on SDs.
Originality/value
Considering stakeholders and external environmental effects, a system of indicators is introduced to explore SD risks to IHPs. In particular, an SEM is used to assess the effects of potential SD factors and characterize their interacting influences. This study could help ICCs to avoid or mitigate project delays and cost overruns in Vietnam, and also provide valuable lessons for other developing countries.
Details
Keywords
M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre
This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.
Abstract
Purpose
This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.
Design/methodology/approach
In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.
Findings
The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.
Research limitations/implications
This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.
Practical implications
Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.
Originality/value
As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.
Details
Keywords
K.I.L. Abhayantha, B.A.K.S. Perera, H.A.H.P. Perera and Roshani S. Palliyaguru
Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been…
Abstract
Purpose
Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been crucial to look into ways to control ERs in HCPs from the contractor’s perspective. This study aims to investigate how ERs can be managed in HCP in Sri Lanka.
Design/methodology/approach
A quantitative research approach with three rounds of Delphi was used. Statistical techniques were used to analyse and validate the ERs, the parties to whom the risks were to be allocated, and risk management measures identified from the empirical data collection.
Findings
The study reveals the 11 most significant ERs for HCP. Further, the most significant ERs in HCP were mainly found to be the responsibility of contractors in Sri Lanka. Twenty-four most appropriate risk response measures were determined; 13 were found to be common measures that could be used to manage two or more risks, while the remaining 11 were unique to specific risks.
Originality/value
Overall, this research determines the most significant ERs in HCP, the best risk allocation among the parties and appropriate risk-handling strategies and measures for each significant ERs. Additionally, the study addresses the demand for ERs management in HCP.
Details
Keywords
I.T. Kadim, M.R. Al‐Ani, R.S. Al‐Maqbaly, M.H. Mansour, O. Mahgoub and E.H. Johnson
The purpose of the paper is to study the effects of cooking on proximate composition, amino acids, fatty acids, minerals and total, heme and non‐heme iron content of camel meat.
Abstract
Purpose
The purpose of the paper is to study the effects of cooking on proximate composition, amino acids, fatty acids, minerals and total, heme and non‐heme iron content of camel meat.
Design/methodology/approach
A total of ten longissimus thoracis muscles (500 grams) were collected between the tenth and twelfth ribs of the left side. Samples were randomly collected from two to three year old camel carcasses chilled (1‐3°C) for 48 hours then stored at −20°C. The first portion was kept fresh while the second one was placed in plastic bags and cooked by immersion in a water bath at 70°C for 90 minutes. Both samples were freeze‐dried, and then ground to a homogeneous mass to be used for chemical analyses.
Findings
Cooked samples had significantly (p<0.05) higher dry matter by 27.7 per cent, protein by 31.1 per cent and fat by 22.2 per cent, but lower ash content by 8.3 per cent than the raw ones. Cooking had no significant effect on amino acid and fatty acid composition of the meat. The components of camel meat most significantly affected by cooking were macro‐ and micro‐minerals, which ranged between 13.1 and 52.5 per cent, respectively. Cooking resulted in a significant decrease in total, heme and non‐heme iron contents by 4.3, 8.7 and 4.0 per cent, respectively.
Research limitations/implications
The research is restricted to camel meat but it is an exploratory study. The issue of research outcome as only longissimus thoracic muscle is another limitation. Further investigation is needed to include different muscles, temperatures, durations and cooking methods.
Practical implications
Amino acids and fatty acids of camel meat are not affected by cooking, while heating accelerated total and heme iron oxidation suggest camel meat to be a rich source of heme iron.
Originality/value
The paper is original in its findings and useful for both researchers and academics in the field of meat science.
Details
Keywords
Sri Rahayu, Yudi Yudi, Rahayu Rahayu and Musthafa Luthfi
This research aimed to analyze the causality between the four perspectives in the balanced scorecard (BSC) performance and to analyze the different performance of the four…
Abstract
Purpose
This research aimed to analyze the causality between the four perspectives in the balanced scorecard (BSC) performance and to analyze the different performance of the four perspectives for the two group schools studied.
Design/methodology/approach
Quantitative data were processed using Smart PLS 0.3 and an independent sample t-test. Qualitative data collected using open questionnaires on performance achievement strategies and constraints were analyzed using the Leximancer 4.51.
Findings
Results showed that innovation and learning performance influenced financial performance and internal business performance. However, innovation and learning performance did not affect customer satisfaction performance. Internal business performance affected financial performance. However, internal business performance did not influence customer satisfaction performance. Customer satisfaction performance did not influence financial performance. Customer satisfaction performance did not mediate the relationship between innovation and learning performance and financial performance. Internal business performance mediated the relationship between innovation and learning performance and financial performance. The two school groups exhibited differing innovation and learning performance, with no difference for the other three perspectives.
Practical implications
The implication of the study is the necessity to create synergy between all parties (school and authorities) to optimize school performance. Improvement in financial performance, especially related to transparency and accountability, will help to improve stakeholders' trust in schools. The government can use the BSC to evaluate public school performance to achieve comprehensive assessment results.
Originality/value
The use of the four perspectives in the BSC performance since public schools in Indonesia have never implemented it.
Details
Keywords
Fathima Sherin Ottakkam Thodukayil, Rahana Salahudeen Raseena, Udhayakumar Palaniswamy and Sigamani Panneer
In line with global initiatives, the state of Kerala in southern India is actively working towards formalizing its informal solid waste management (SWM) sector. Despite this…
Abstract
In line with global initiatives, the state of Kerala in southern India is actively working towards formalizing its informal solid waste management (SWM) sector. Despite this, there is a dearth of studies on formalization processes, particularly focusing on the conditions of workers within this sector. This study addresses the gap by examining the challenges faced by women workers operating within the formalized framework of Kerala’s SWM sector. It aimed to investigate challenges faced by grassroots women workers in Kerala’s SWM sector during its transition from informal to formal, identifying gaps in the process through their experiences. Using a qualitative methodology, the research gathered data from 10 women workers in the SWM sector in Kozhikode, Kerala, who were part of the Haritha Karma Sena (green task force). Thematic analysis of in-depth interviews revealed two major challenges faced by these women. Firstly, there was a negative societal perception towards them, and secondly, there was a lack of appropriate state response to their needs and requirements. These challenges were attributed to gaps and pitfalls in the formalization process, leading to a lowered socio-economic status for the women, increased vulnerability to health hazards, and societal stigma. The findings underscore the need for significant improvements in the formalization process of Kerala’s waste management sector. The study advocates for targeted policy interventions to enhance the working conditions of SWM workers, emphasizing the importance of expediting and streamlining the formalization process. This, in turn, would contribute to the overall effectiveness of the SWM system in the state.
Details
Keywords
Satish Kumar Viswanathan and Kumar Neeraj Jha
International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing…
Abstract
Purpose
International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing international market risks vary from one country to another, the purpose of this paper is to identify the critical risk factors of embarking on international construction projects according to Indian experiences.
Design/methodology/approach
After primarily verifying the identified 26 risk variables, a questionnaire survey was conducted to draw upon the views of experts who possess international project experience. The 105 responses were analyzed using univariate and multivariate techniques. An analysis of variance identified the significant variables that influence overall performance on international construction projects, which were then grouped according to underlying relationships using factor analysis to determine the specific risk factors. Furthermore, considering these risk factors as independent variables and overall project performance as a dependent variable, a stepwise regression analysis was carried out to identify relatively critical risk factors.
Findings
The results revealed that of the identified four risk factors, the project-specific risk factor emerged as the foremost critical risk factor, the economic and market-specific risk factor was the second most critical risk factor, the firm-specific risk factor was the third most critical risk factor and the political-specific risk factor was the least critical risk factor. These findings were also validated appropriately.
Research limitations/implications
This study was limited to the data acquired from Indian construction firms, predominantly consultants and contractors. Though the survey respondents possessed adequate familiarity in international construction, commonly perceived limitations in self-reported surveys such as the lack of conscientious responses and reporting bias were not an exception in this research.
Practical implications
The risk factors and their criticality – as identified in this study – can aid the multinational firms and international aspirants to prioritize the critical aspects and develop a suitable risk mitigation strategy to achieve greater project success in international market.
Originality/value
By investigating the various risk factors that influence overall performance of international construction projects, this research considerably contributes to the body of knowledge pertaining to international construction risk management that will enable firms from India and similar developing nations to emphasize on critical risk factors.
Details
Keywords
Salma Ahmed, Lotfi Romdhane, Sameh Monir El-Sayegh and Solair Manjikian
The purpose of this study is to identify and assess new risks in construction projects that use 3D printing.
Abstract
Purpose
The purpose of this study is to identify and assess new risks in construction projects that use 3D printing.
Design/methodology/approach
A mixed approach of both qualitative and quantitative methods was used. Literature review was conducted to extract 30 risks of 3D printing in construction. A survey was then developed to assess the probability and impact of these risks. In total, 37 respondents, who have experience and/or knowledge of 3D printing, completed the survey. The risk priority was calculated using a fuzzy logic approach. The main benefit of the proposed model is being able to use numerical and linguistic data in the risk assessment model.
Findings
The results show that the main risks, in terms of priority, are lack of codes and regulations for 3D printing in construction, delay in government approvals, shortage in labour skilled in 3D printed construction, lack of knowledge and information of 3D printed design concepts and changes in 3D construction codes and regulations.
Originality/value
This paper fills an identified gap in the literature related to 3D printing in construction and provides insights into the key risks affecting this disruptive technology.
Details
Keywords
Citra S. Ongkowijoyo, Argaw Gurmu and Andi Andi
The complexities in strait-crossing cable-stayed bridge project are increasing the risks. This study aims to identify and analyze the significant and worth-considered construction…
Abstract
Purpose
The complexities in strait-crossing cable-stayed bridge project are increasing the risks. This study aims to identify and analyze the significant and worth-considered construction risks of the first, biggest and longest spanned strait-crossing bridge project in Indonesia.
Design/methodology/approach
As many as 32 risk events were identified and determined as the risks that exist and can be represented in the Suramadu bridge project context. Data was collected through a design-based questionnaire disseminated to experts involved in the project as well as semi-formal interviews. Several quantitative methods were applied to analyze the significant risks, such as relative importance index, Spearman’s rank correlation test and Mann–Whitney U test.
Findings
The analyses reveal that “unexpected natural behavior” confirmed by both contractor and consultant parties is the most significant and crucial risk event. Another risk event found to be significant is the “delayed payment.” On the other hand, it is also found that several risks within the legal category are found to be less significant compared to other major risk events.
Research limitations/implications
The results of the present research should be interpreted in the context of several limitations. Given these possible concerns regarding the generalizability of the findings, along with the relatively low rate of participants in the current research, additional studies are needed to provide a more complete picture of stakeholder perceptions who are involved directly in the construction environment as well as to identify more construction risks specifically in the large-scale bridge project.
Practical implications
This study has provided fundamental contributions to the body of knowledge and practical implication to promote and assist decision-makers toward developing a comprehensive risk assessment of a large-scale bridge project.
Originality/value
The analyses of outcomes and discussion, as well as the findings of this research, have shed light on the construction risks understanding, which contributes to delivering a theoretical framework for achieving large-scale bridge project success.
Details
Keywords
Amneh Alkurdi, Hamzeh Al Amosh and Saleh F.A. Khatib
This study seeks to investigate the impact of board attributes on environmental, social and governance (ESG) performance, along with exploring the mediating role of carbon…
Abstract
Purpose
This study seeks to investigate the impact of board attributes on environmental, social and governance (ESG) performance, along with exploring the mediating role of carbon emissions in this relationship.
Design/methodology/approach
To address this objective, the panel data approach was used to analyze the data were collected from 1,621 European companies from 2017 to 2021.
Findings
This study shows that board gender diversity, audit committee independence, expertise and board meeting attendance help enhance ESG performance. On the contrary, board size and composition do not affect ESG performance. The findings also showed that board gender diversity, audit committee independence, expertise and board meeting attendance are negatively related to carbon emissions performance. However, board size is related positively to carbon emissions performance. This indicates that the larger boards of directors may have diverse experiences that enhance the environmental performance of companies. Furthermore, the finding showed companies that contribute to lowering carbon emissions are more willing to improve their ESG performance. Also, carbon emissions mediate the relationship between the board's attributes and ESG performance.
Originality/value
The study's results have significant implications for firm managers in enhancing the efficiency of board decisions in determining environmental practices that matter to various groups of stakeholders. In addition, this study provides valuable input to regulators and policymakers regarding strengthening the regulations and controlling tools that enhance environmental performance.
Details