Publication date: 5 October 2012

Nicholas Chileshe and Adwoa Boadua Yirenkyi‐Fianko

The purpose of this paper is to identify and assess the likelihood of occurrence and degree of impact of the risk factors on construction projects within the Ghanaian construction…

3013

Abstract

Purpose

The purpose of this paper is to identify and assess the likelihood of occurrence and degree of impact of the risk factors on construction projects within the Ghanaian construction industry.

Design/methodology/approach

A survey of randomly selected samples yielded responses from 34 contractors, 46 consultants, and 23 clients or owners (private and public) within the Ghanaian construction industry. Literature review is used to identify 25 relevant risk variables which were grouped into ten composite factors and then incorporated into the design of the survey instrument. Survey response data were subjected to descriptive statistics and analysis of variance (ANOVA), and subsequently the exposure rating levels were determined, which enabled the categorisation of the probability‐impact scores in low, medium and high levels.

Findings

Results of this study indicate a disparity of the ranking of the degree of occurrence and impact among the groups. There was a statistical difference at the p<0.05 level significant for five out of 25 risk factors occurrences as follows: “construction methods”, “inflation”, “weather condition”, “ground conditions and contaminant conditions” and “poor communication amongst project team” and only one for the degree of impact scores for “price fluctuation”. Based on the composite risk factors, the financial and economic factors were found to be the most likely to occur and have the most impact on projects, whereas legal risk factor was found to be a low weighted risk, as it had the least likelihood to occur and the least impact score. The post hoc comparisons using the Tukey HSD test also indicated differences between the contractor and clients in the ranking of construction methods risk variable, but no significant differences between contractors/consultants and clients/consultants.

Research limitations/implications

Geographically, only respondents from construction organisations in the Greater Accra Region were considered, which limits generalization of the findings. The research did not also distinguish foreign from local contractors in the classification, as literature has shown that the perception of the degree of impact and likelihood of occurrence of risk analysis could also vary according to the degree of ownership.

Originality/value

The paper makes a contribution by exploring the degree of risk occurrence and its impact on construction projects within a developing economy and much lesser studied context. The paper provides insights on the perception of risk among construction professions in Ghana and it also provides some insights on the current levels of risk for foreign contractors wishing to operate in Ghana.

Details

Journal of Engineering, Design and Technology, vol. 10 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 11 July 2008

I. Mañelele and M. Muya

The purpose of this paper is to discuss and highlight the results of a study that identified critical risks involved in the procurement of community‐based infrastructure projects…

1343

Abstract

Purpose

The purpose of this paper is to discuss and highlight the results of a study that identified critical risks involved in the procurement of community‐based infrastructure projects in Zambia.

Design/methodology/approach

Brainstorming was chosen as the method for identifying risks in the study. It was applied in the form of group discussions with project management committees at community level to identify potential risks affecting their particular projects.

Findings

The identified critical risks were classified into six categories: project initiation; community contribution and participation; budget and finance; skilled labour; materials procurement and technical supervision; and quality control. Several significant risk factors were identified in all these six categories in community‐based construction projects. The paper concludes that indeed there are critical risks in community‐based construction projects that require forward planning, assessment and mitigation.

Originality/value

The consequences of not assessing and managing construction risks in both conventional and community‐based procurement systems are that projects may experience time and cost overruns and lead to poor quality structures. It is therefore important to identify risks in community projects.

Details

Journal of Engineering, Design and Technology, vol. 6 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 13 May 2014

Nicholas Chileshe and Geraldine John Kikwasi

Despite the extensive research on critical success factors (CSFs), there is a paucity of studies that examine CSFs for the deployment of risk assessment and management processes…

3893

Abstract

Purpose

Despite the extensive research on critical success factors (CSFs), there is a paucity of studies that examine CSFs for the deployment of risk assessment and management processes in developing countries, particularly, Africa. The purpose of this paper is to investigate the perception of construction professionals on CSFs appertaining to the deployment of risk assessment and management practices (RAMP) in Tanzania with the aim of filling the knowledge gap.

Design/methodology/approach

The primary data were collected from 67 construction professionals working with clients (private and public), consultants, and contractor organisations (foreign and local) within the Tanzanian construction. Response data was subjected to descriptive and inferential statistics with one-way analysis of variance to examine the differences in the perception of the identified CSFs.

Findings

The descriptive and empirical analysis demonstrated a disparity of the ranking of the ten CSFs among the groups; however, the differences were not significant. Based on the overall sample, the results of the mean score ranking indicate that “awareness of risk management processes”; “team work and communications”; and “management style” were the three highly ranked CSFs whereas “co-operative culture”; “customer requirement”; and “positive human dynamics” were considered to be the least important.

Research limitations/implications

The study did not differentiate the perceptions of the CSFs according to the ownership (local or foreign), and the sample consisted of organisations in one industry operating in Tanzania. Consequently, the findings may not generalise to other industries or to organisations operating in other countries.

Practical implications

For RAMP to be implemented effectively, Tanzanian constructional-related organisations should consider the identified CSFs as a vehicle for improving project success through reduction of risk uncertainty. Furthermore, regardless of the type of organisation, “management style”, “team work and communication” are necessary for the successful deployment of RAMP.

Originality/value

This study makes a contribution to the body of knowledge on the subject within a previously unexplored context. The study provides insights on the drivers and enablers (CSFs) of risk assessment implementation across the Tanzania construction sector.

Details

Engineering, Construction and Architectural Management, vol. 21 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 12 July 2013

Taufika Ophiyandri, Dilanthi Amaratunga, Chaminda Pathirage and Kaushal Keraminiyage

The purpose of this paper is to investigate the critical success factors (CSFs) of community‐based post‐disaster housing reconstruction projects (CPHRP) during the…

1295

Abstract

Purpose

The purpose of this paper is to investigate the critical success factors (CSFs) of community‐based post‐disaster housing reconstruction projects (CPHRP) during the pre‐construction stage.

Design/methodology/approach

An extensive literature review and interviews were undertaken to establish selected factors contributing to the success of community‐based post disaster housing reconstruction projects. Following this, a questionnaire survey was administered to key stakeholders in order to perceive their view on CSFs of CPHRP. Data were analysed by deploying statistical software.

Findings

It was found that 12 factors are considered to be the CSFs: transparency and accountability, appropriate reconstruction policy/strategy, an understanding of the community‐based method, gathering trust from the community, facilitator capacity, good coordination and communication, sufficient funding availability, implementer capacity, having a significant level of community participation/control, government support, involvement of all community members, and successful beneficiary identification.

Practical implications

The establishment of CSFs in CPHRP helps key stakeholders to identify factors that must exist and go well during pre‐construction of CPHRP, in order to ensure the success of the programme.

Originality/value

The paper is very specific as it attempts to discover the CSFs of CPHRP during the pre‐construction stage.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 4 no. 2
Type: Research Article
ISSN: 1759-5908

Keywords

Access Restricted. View access options
Article
Publication date: 25 January 2022

Abner Lawangen

This paper is to contribute to addressing the knowledge gap on the roles of rural cooperatives in disaster risk reduction and management (DRRM).

294

Abstract

Purpose

This paper is to contribute to addressing the knowledge gap on the roles of rural cooperatives in disaster risk reduction and management (DRRM).

Design/methodology/approach

This study adopts a mixed-methods approach highlighting indigenous strategies of community engagement – the pantatabtaval/tong tongan (brainstorming and dialogs), pan-iestorya/dad-at (storytelling session) and field observations with 50 village-level cooperatives in Benguet, Philippines to understand their contributions to local DRRM.

Findings

Rural cooperatives in Benguet have evolved on their context of service from mere rural development to now include DRRM donations and aid for disaster-affected families, credit and loans are the most common services of these rural cooperative extended to their members to deal with risks of disasters.

Originality/value

Most research on cooperatives focuses on their contribution to socio-economic development and only few dealt with DRRM. This paper explores the link of these rural organizations with DRRM drawing evidence from cooperatives in the rural communities of Benguet, Philippines.

Details

Disaster Prevention and Management: An International Journal, vol. 31 no. 2
Type: Research Article
ISSN: 0965-3562

Keywords

Access Restricted. View access options
Article
Publication date: 6 February 2017

Nini Xia, Xueqing Wang, Ye Wang, Qiubo Yang and Xing Liu

Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the…

866

Abstract

Purpose

Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the project lifecycle with Bayesian Networks (BNs).

Design/methodology/approach

The framework includes three phases. In the qualitative phase, primary risks were identified by literature reviews and interviews; questionnaires were used to determine key risks at each project stage and causal relationships between stage-related risks. In the quantitation, brainstorming and questionnaires, and techniques of ranked nodes/paths, risk map and Bayesian truth serum were adopted. Then, a BN-based risk assessment model was developed, and risk analysis was conducted with AgenaRisk software.

Findings

Twenty key risks across the lifecycle were determined: some risks were recurring and different risks emerged at various stages with the construction and feasibility most risky. Results showed that previous stages’ risks significantly amplified subsequent stages’ risks. Based on the causality of stage-related risks, a qualitative model was easily constructed. Ranked nodes/paths facilitated the quantification by requiring less statistical knowledge and fewer parameters than traditional BNs. As articulated by a case, this model yielded very simple and easy-to-understand representations of risks and risk propagation pathways.

Originality/value

Rare research has developed a BN risk assessment model from the perspective of project stages. A structured model, a propagation network among individual risks, stage-related risks, and the final adverse consequence, has been designed. This research provides practitioners with a realistic risk assessment approach and further understanding of dynamic and stage-related risks throughout large infrastructures’ lifecycle. The framework can be modified and used in other real-world risk analysis where risks are complex and develop in stages.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 24 May 2018

Rana Khallaf, Nader Naderpajouh and Makarand Hastak

The purpose of this paper is to build upon the extensive application of risk registries in the construction literature and establish a systematic methodology to develop risk…

720

Abstract

Purpose

The purpose of this paper is to build upon the extensive application of risk registries in the construction literature and establish a systematic methodology to develop risk registries. Risk registries channel judgment of experts as a basis for risk analysis and should be tailored for each project to be more effective. Given their prevalence, there is a need for systematic integration of tacit and explicit knowledge to develop practical risk registries.

Design/methodology/approach

A combined approach is proposed using the systematic literature review (SLR) technique to integrate explicit knowledge and Delphi technique to integrate tacit knowledge in the development of risk registries. This two-step approach further increases the robustness of the registries by validating them through integrating and contrasting multiple forms of knowledge for a tailored risk registry.

Findings

The application of the proposed approach indicates that the use of multiple forms of knowledge can increase the robustness and practicality of risk registries. It also showcased its potential in the development of risk registries for complex projects. Examples include modification of risk factors obtained from the explicit sources of knowledge based on contextual tacit knowledge.

Originality/value

The proposed approach is an imperative step to standardize the development of risk registries. With its inherent validation process through integrating and contrasting tacit and explicit knowledge, practitioners can use this approach to develop practical risk registries for different categories of projects. Integrating different forms of knowledge can increase the impact of registries beyond risk assessment and in contexts such as decision making and performance assessment.