1 – 10 of 12Eleni Papadonikolaki, Algan Tezel, Ibrahim Yitmen and Per Hilletofth
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect…
Abstract
Purpose
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect construction businesses through smart contracts and crypto-economics. This paper explores the blockchain innovation ecosystem in construction.
Design/methodology/approach
Through a qualitative study of 23 diverse interviewees, the study explores how open or closed the blockchain innovation ecosystem in construction is and who its emerging orchestrators are.
Findings
The data showed that construction aims towards an open innovation blockchain ecosystem, although there are elements of hybridisation and closedness, each system pointing out to different orchestrators.
Practical implications
The study has implications for governments and large companies in construction, showing that open innovation initiatives need to be encouraged by policymakers through rules, regulations and government-sponsored demonstrator projects.
Social implications
The data showed that there is lack of readiness for business model change to support open innovation blockchain ecosystems in construction.
Originality/value
This is the first study applying the open innovation theory in the construction industry and sheds light into the phenomenon of blockchain, suggesting routes for further democratisation of the technology for policymakers and practitioners.
Details
Keywords
Xiaoning (Alice) Qian and Eleni Papadonikolaki
Blockchain technology is booming in many industries. Its application in supply chain management is also gradually increasing. Supply chain management (SCM) has long been committed…
Abstract
Purpose
Blockchain technology is booming in many industries. Its application in supply chain management is also gradually increasing. Supply chain management (SCM) has long been committed to reducing costs and increasing efficiency and is trying to optimise resources and reduce the sector's fragmentation. Trust has always been an important factor in managing supply chain relationships, and it also affects the efficiency of supply chain operations. To this end, this study aims to examine how trust is affected by the introduction of blockchain technology in construction supply chain management.
Design/methodology/approach
This study is based on semi-structured interviews and publicly available information from experts in blockchain and construction supply chain management. Through content analysis, the data are analysed thematically to explore how various types of trust, such as system-based, cognition-based and relation-based, are affected by blockchain technology.
Findings
Blockchain technology provides solutions for data tracking, contracting and transferring resources in supply chain management. These applications help enhance the various sources of trust in SCM and provide supply chain partners with protection mechanisms to avoid the risks and costs of opportunistic behaviour in collaboration, shifting trust from relational to system-based and cognition-based.
Research limitations/implications
This study focuses only on inter-organisational rather than interpersonal trust and empirical data from experts whose knowledge and cognition could be subjective.
Practical implications
Leveraging the potential of digitalisation to manage trust requires that leaders and managers actively try to improve contractual arrangements, information sharing and being open to new innovative technologies like blockchain.
Social implications
From a relational view of supply chain management, the extent to which blockchain technology can develop and spread depends on the readiness of the social capital to accept decentralised governance structures.
Originality/value
This study builds upon an original data set and discusses features and applications of blockchain technology, explores the sources and dimensions of trust in supply chain management and explains the impact of blockchain technology on trust.
Details
Keywords
Javad Bakhshi, Hamed Golzad, Igor Martek, M. Reza Hosseini and Eleni Papadonikolaki
This study aims to investigate the complexity factors associated with BIM-enabled projects. BIM has been widely promoted as a potential solution to numerous challenges that hinder…
Abstract
Purpose
This study aims to investigate the complexity factors associated with BIM-enabled projects. BIM has been widely promoted as a potential solution to numerous challenges that hinder productivity in construction projects, owing to its numerous advantages. Nevertheless, it is crucial to acknowledge the heightened complexity it introduces to project workflows, stakeholder coordination and information management.
Design/methodology/approach
This study employs the Delphi method to identify and extract complexity factors specific to BIM-enabled projects. A panel of industry and academic experts is engaged to discern and prioritise these factors based on their expertise and knowledge.
Findings
The study reveals a comprehensive list of 34 complexity factors that significantly impact BIM-enabled projects. Among the most influential factors are laws and regulations, variety of procurement methods, technical capabilities of teams, project manager competence, information transfer capacity, range of project deliverables and diversity of project locations. The findings highlight the importance of these factors and emphasise the need for proactive and adaptive management to navigate their impact and achieve positive project outcomes.
Originality/value
This study introduces the DEBACCS framework, a metric-based model designed to understand and evaluate complexity within BIM-enabled projects. DEBACCS stands for seven key dimensions: diversity, emergence, belonging, autonomy, connectivity, context and size. These dimensions represent essential aspects for gauging project complexity. By applying the concept of complexity from project management to BIM, the study offers valuable insights for practitioners and researchers. It provides a unique perspective on the challenges and considerations associated with implementing and managing BIM in construction projects. The findings have practical value for practitioners, enabling them to better understand and address the implications of complexity in BIM-enabled projects, ultimately leading to improved project outcomes.
Details
Keywords
Janet Chang, Klaudia Jaskula, Eleni Papadonikolaki, Dimitrios Rovas and Ajith Kumar Parlikad
This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction…
Abstract
Purpose
This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction phase. The significance of effective management of handover information is highlighted by global building failures, such as the Grenfell Tower fire in London, UK. Despite existing technological interventions, there remains a paucity of understanding regarding the factors contributing to the decline in the quality of handover information during the post-construction phase.
Design/methodology/approach
This study employed a multi-case studies approach across five higher education institutions. It involved conducting semi-structured interviews with 52 asset management professionals, uncovering the underlying reasons for the decline in handover information quality. Building on these insights, the study performed a mapping exercise to align these identified factors with blockchain technology features and information quality dimensions, aiming to evaluate blockchain’s potential in managing quality handover information.
Findings
The study findings suggest that blockchain technology offers advantages but has limitations in addressing all the identified quality issues of managing handover information. Due to the lack of an automated process and file-based information exchange, updating handover information still requires an error-prone manual process, leading to potential information loss. Additionally, no solutions are available for encoding drawings for updates and validation.
Originality/value
This study proposes a framework integrating blockchain to enhance the information management process and improve handover information quality.
Details
Keywords
M. Reza Hosseini, Julie Jupp, Eleni Papadonikolaki, Tim Mumford, Will Joske and Bahareh Nikmehr
This position paper urges a drive towards clarity in the key definitions, terminologies and habits of speech associated with digital engineering and building information modelling…
Abstract
Purpose
This position paper urges a drive towards clarity in the key definitions, terminologies and habits of speech associated with digital engineering and building information modelling (BIM). The ultimate goal of the paper is to facilitate the move towards arriving at an ideal definition for both concepts.
Design/methodology/approach
This paper takes the “explanation building” review approach in providing prescriptive guidelines to researchers and industry practitioners. The aim of the review is to draw upon existing studies to identify, describe and find application of principles in a real-world context.
Findings
The paper highlights the definitional challenges surrounding digital engineering and BIM in Australia, to evoke a debate on BIM and digital engineering boundaries, how and why these two concepts may be linked, and how they relate to emerging concepts.
Originality/value
This is the first scholarly attempt to clarify the definition of digital engineering and address the confusion between the concepts of BIM and digital engineering.
Details
Keywords
Mehran Oraee, M. Reza Hosseini, David Edwards and Eleni Papadonikolaki
The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across…
Abstract
Purpose
The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across the construction industry, the problems associated with the lack of collaboration among teams in BbCNs remain a major hindrance to reaping the full potential of BIM. Previous studies have been conceptual in nature. This paper, therefore, attempts to modify and validate existing conceptual models that describe collaboration in BbCNs.
Design/methodology/approach
To modify the conceptual model for collaboration in BbCNs, qualitative data through semi-structured interviews with BIM experts in the industry were collected and analysed using qualitative methods including the use of NVivo software.
Findings
The proposed model includes influential factors and their sub-factors to collaboration in BbCNs, as well as considering their indicators. Findings reveal that several overlooked concepts, particularly unfavourable BIM contractual arrangements, act as the root causes of the unwillingness of team members in BbCNs to engage in collaborative efforts.
Research limitations/implications
The study's findings must be viewed in light of several limitations. First, the interviewees in this study were based in Australia hence their perceptions of BIM collaboration are reflective of the sociotechnical setting of BIM-enabled projects in this country. Also, the findings are based on the perception of experts in the field, rather than analysis of performance measures or quantitative assessment of associations among collaboration outcomes and various factors. This, however, provides the field with fertile grounds for future research.
Practical implications
The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects.
Social implications
The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects.
Originality/value
Arguments provided in this study highlight the necessity of considering the contractual arrangement of BIM-related projects and foster the willingness of team members to collaborate. This can be addressed using clear and comprehensive BIM execution plans and clearly explaining the role of BIM managers in the process.
Details
Keywords
M. Reza Hosseini, Rogier Roelvink, Eleni Papadonikolaki, David John Edwards and Erika Pärn
Integrating building information modelling (BIM) into facility management (FM) has generated fervent debate within the extant literature given an increasing realisation amongst…
Abstract
Purpose
Integrating building information modelling (BIM) into facility management (FM) has generated fervent debate within the extant literature given an increasing realisation amongst practitioners that the majority of BIM benefits reside within the whole lifecycle management. Converting a building’s in-use data and information into tangible business knowledge to augment FM performance is crucial for business growth and prosperity. Yet curiously, scant academic attention has been paid in investigating the data and information hand-over process through BIM required by FM. The purpose of this paper is to address this knowledge gap.
Design/methodology/approach
The research approach adopted draws upon pertinent BIM in the FM literature and a qualitative discourse accrued via focus group meetings of Australian FM experts.
Findings
The study’s findings are presented as a data and information typology matrix that captures the associations among different forms of data ownership, FM service delivery categories and data and information typologies for using BIM in FM.
Practical implications
The analysis results will prove invaluable for policy-makers, researchers and practitioners by providing a relevant data and information typology and capturing the complex associations in the process of integrating BIM into FM.
Originality/value
This study contributes to the field by providing a better understanding of different forms of data and information, required by members of a FM team. The original insight shared here is the necessity to consider a distinctive array of interests and the potential for using different forms of data and information when integrating BIM into FM.
Details
Keywords
Tan Tan, Grant Mills, Xiaolin Ma and Eleni Papadonikolaki
Off-Site Construction (OSC) has received much government and public attention during and after COVID. Building Information Modelling (BIM) is an initiative discussed widely to…
Abstract
Purpose
Off-Site Construction (OSC) has received much government and public attention during and after COVID. Building Information Modelling (BIM) is an initiative discussed widely to promote OSC implementation. Although many policy promotions have been published, there are many challenges to implementing BIM and OSC in real life and questions of whether they really offer value to healthcare design professionals. This research aims to investigate BIM and OSC to understand their commonalities and differences of challenges by collecting empirical evidence from China’s healthcare construction.
Design/methodology/approach
This exploratory research adopted a mixed method with a questionnaire survey and interviews. A total of 261 questionnaires were received (with 183 valid), followed by 31 semi-structured interviews.
Findings
This research reveals that although both OSC and BIM face similar adoption challenges and suspicious attitudes in real-life projects, their challenges’ connotations and reasons are different. OSC faces scepticism for its customisation costs and technical constraints, while BIM is seen as limited in utility and complex to integrate. Highlighting these as socio-technical challenges, the research advocates for an integrated framework to effectively implement OSC and BIM, addressing both technical and collaborative needs in healthcare construction.
Originality/value
This research examines OSC and BIM within the context of healthcare construction, a focus that is relatively underexplored. The research provides a juxtaposition of the perceived and practical challenges of adopting these technologies, revealing a gap between the industry’s expectations and the current capabilities of OSC and BIM, thereby contributing to the development of modern methods of design in healthcare.
Details
Keywords
Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas
Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…
Abstract
Purpose
Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.
Design/methodology/approach
Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.
Findings
The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.
Originality/value
The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.
Details
Keywords
Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki
Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…
Abstract
Purpose
Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.
Design/methodology/approach
A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.
Findings
The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.
Originality/value
This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.
Details