EDWARD W. MERROW and WILLIAM H. CROKER
Chevron has successfully used benchmarking to improve the performance of our project management system.
Christopher Owen Cox and Hamid Pasaei
According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…
Abstract
Purpose
According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.
Study design/methodology/approach
This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.
Findings
The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.
Originality/value
This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.
Details
Keywords
Colette Russell and Joanne Meehan
In the UK, major IT public procurement projects regularly fail at significant cost to the taxpayer. The prevalence of these failures presents scholars with a challenge; to both…
Abstract
In the UK, major IT public procurement projects regularly fail at significant cost to the taxpayer. The prevalence of these failures presents scholars with a challenge; to both understand their genesis and to facilitate learning and prevention. Functional approaches have revealed numerous determinants of failure ranging from procurement specifications to risk escalation, but true and definitive causes remain elusive. However, since failure is not itself an absolute truth, but rather a concept which is reached when support is withdrawn, the survival of a project depends on there being sufficient belief in its legitimacy. We use critical hermeneutic methods and the conceptual lens of legitimacy to reveal powerful legitimating influences that enable and constrain action, but which are not analysed in the retrospective government inquiries that determine lessons learned.
Feng Jin, Wenwu Xiang, Zheng Ji and Bochen Zhang
The purpose of this paper is to quantify the evolutionary mechanism of coronavirus disease 2019 (COVID-19) impact on international construction multi-projects.
Abstract
Purpose
The purpose of this paper is to quantify the evolutionary mechanism of coronavirus disease 2019 (COVID-19) impact on international construction multi-projects.
Design/methodology/approach
From three concepts of complexity, stressor and detractor risks, a multi-project simulation model under COVID-19 outbreak is proposed to study the characteristics of contingency with three peaks of ordered and disordered states. Specially, COVID-19 brings forth mitigation fee, epidemic prevention fee, holdup fee and schedule delay fee of multi-projects. By integrating parametric model, Monte Carlo and chaos theory, a comparative analysis of its contingency with or without COVID-19 is conducted. Summarizing the simulated results, their total contingencies at certain risk tolerance are obtained at two status of static at one-time point and dynamic over time. Meanwhile, some major risks including detractors, complexities and stressors are screened out for mitigation, especially for epidemic prevention and control. Eventually, the real case is illustrated to demonstrate its validity.
Findings
It provides a quantitative analysis framework for the impact of epidemic, a once-in-a-century black swan event with a long tail, on construction multi-projects.
Practical implications
It conduct an effective model to quantify impacts of COVID-19 on international construction multi-projects for implementing effective counter-measures, which lay foundation for claims among different stakeholders.
Originality/value
The term of detractor risk is applied to describe COVID-19 and quantify its impact upon international construction multi-projects. Further, a hybrid model by integrating parametric model and Monte Carlo in type I/II model is proposed to simulate their contingencies at disordered states. Finally, the simulated outcomes of these models are used to guide effective risk control to meet the requirements by the client.
Details
Keywords
G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey
Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…
Abstract
Purpose
Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.
Design/methodology/approach
A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.
Findings
This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.
Practical implications
FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.
Originality/value
FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”
Details
Keywords
To propose a complementary approach to traditional project management competency training, and approach that is based on a different worldview.
Abstract
Purpose
To propose a complementary approach to traditional project management competency training, and approach that is based on a different worldview.
Design/methodology/approach
The research for this paper was based primarily on literature searches as well as conducting interviews with a number of project managers.
Findings
The current approach has limitations. Generally, it is good for doing projects in a stable environment.
Research limitations/implications
The new model for project management could be tested and compared to the traditional model.
Practical implications
The practical implication/consequence is an improvement in the project performance. Specifically, the new approach requires the project managers to mange the interaction of the parts of the project rather than managing each part separately.
Originality/value
The problem with project performance is paradigmatic, i.e. using a wrong mindset.
Details
Keywords
Through the energetic initiative of “The Globe” newspaper a Middle Classes Union has been formed for the purpose of organising that great body of people into an Alliance that…
Abstract
Through the energetic initiative of “The Globe” newspaper a Middle Classes Union has been formed for the purpose of organising that great body of people into an Alliance that shall be capable of making its power felt. A preliminary meeting was held recently under the presidency of Major J. R. Pretyman Newman, M.P., of gentlemen interested in the scheme recently outlined in “The Globe” for combining the Middle Classes in a Union for their own protection. All present were unanimous as to the necessity for the formation of such an organisation, and after discussion it was provisionally agreed that its title should be—
The statement of the Minister of Agriculture, Fisheries and Food, coming so quickly after the ban on the use of cyclamates in food and drink in the United States, indicates that…
Abstract
The statement of the Minister of Agriculture, Fisheries and Food, coming so quickly after the ban on the use of cyclamates in food and drink in the United States, indicates that the new evidence of carcinogenesis in animals, placed at the disposal of the authorities by the U.S. F.D.A., has been accepted; at least, until the results of investigations being carried out in this country are available. The evidence was as new to the U.S. authorities as to our own and in the light of it, they could no longer regard the substances as in the GRAS class of food additives. It is, of course, right that any substance of which there is the slightest doubt should be removed from use; not as the result of food neuroses and health scares, but only on the basis of scientific evidence, however remote the connection. It is also right that there should always be power of selection by consumers avoidance is usually possible with other things known to be harmful, such as smoking and alcohol; in other cases, especially with chemical additives to food and drink, there must be pre‐knowledge, so that those who do not wish to consume food or drink containing such additives can ascertain from labelling those commodities which contain them.