Article
Publication date: 1 January 1996

GARY D. HOLT, PAUL O. OLOMOLAIYE and FRANK C. HARRIS

The procedural and administrative aspects of UK tendering have remained largely unaltered for decades but this may soon change in light of the recent review of the construction…

3072

Abstract

The procedural and administrative aspects of UK tendering have remained largely unaltered for decades but this may soon change in light of the recent review of the construction sector, headed by Sir Michael Latham. This paper presents findings of a nationwide survey of UK construction contractors assessing their opinion of the Latham procurement recommendations, along with their opinion of the authors' proposals for alternative selection procedure. Contractor usage/opinion of current tendering methods, tendering documentation and contractual arrangements are also identified. Analysis techniques primarily involve the derivation of contractor preference, agreement and importance indices (Pri, Agi and Imi respectively). Results show that clients are attempting to cut costs by increased use of open tendering coupled with plan and specification tender documentation, but that savings are offset by clients ultimately paying for contractors' costs associated with their achieving contract award for only 1 in 5 bids. Generally, contractors are in tune with the ideals of the Latham review and characteristics pertaining to the HOLT (Highlight Optimum Legitimate Tender) selection technique.

Details

Engineering, Construction and Architectural Management, vol. 3 no. 1/2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 January 1994

GARY D. HOLT, PAUL O. OLOMOLAIYE and FRANK C. HARRIS

A quantitative contractor selection technique which embraces the pre‐qualification, evaluation and final selection processes is being developed. The emphasis is on evaluating…

775

Abstract

A quantitative contractor selection technique which embraces the pre‐qualification, evaluation and final selection processes is being developed. The emphasis is on evaluating contractors' performance potential in terms of their ability to achieve time, cost and quality standards. This approach is in contrast to the majority of current selection techniques which tend to prequalify, then discriminate predominantly on the cost component of tenders. The conceptual model is applied to a hypothetical but realistic scenario of a contractor competing for a small industrial contract. This illustrates the mechanics of the new technique, emphasizing that contractor selection should include identifying the contractor with the best performance potential and not merely the lowest bidder.

Details

Engineering, Construction and Architectural Management, vol. 1 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 March 2006

David J Edwards and Gary D Holt

The Control of Vibration at Work Regulations (CVWR), quantify workplace vibration exposure using exposure action, and exposure limit values (EAV and ELV respectively). Hand‐arm…

252

Abstract

The Control of Vibration at Work Regulations (CVWR), quantify workplace vibration exposure using exposure action, and exposure limit values (EAV and ELV respectively). Hand‐arm vibration (HAV) risk can be objectively assessed using hand‐tool vibration magnitude data, for comparison to the EAV and ELV. When considering risk controls, one disadvantage of this ‘focus’ on vibration magnitude, is that it might deflect appreciation of the economic implications of such controls, resulting from for example: restrictions on tool usage time; the need for operator rotas where continuous tool use is required; and complications in estimating labour costs because of these types of condition. Based on a sample of hand‐tools’ performance data, this research developed ‘hybrid’ (performance/vibration) dimensions for quantifying tools’ efficacy; representing (interalia) units of work achievable to reach the EAV and ELV. These hybrid dimensions characterize an alternative performance‐based (and therefore financially related) way of considering a tool’s ‘suitability’ within CVWR parameters; over and above the (selection) criterion of tool vibration magnitude. Analyses are then presented that investigate the time and cost ramifications of using multiple operators, to sustain continuous tool usage while keeping exposure levels within CVWR limits.

Details

Journal of Financial Management of Property and Construction, vol. 11 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Access Restricted. View access options
Book part
Publication date: 7 November 2018

Fiona M. Kay

Building on relational inequality theory, this paper incorporates social capital as a device to trace the flow of resources through relationships originating within and beyond…

Abstract

Building on relational inequality theory, this paper incorporates social capital as a device to trace the flow of resources through relationships originating within and beyond organizations. I draw on a survey of over 1,700 lawyers to evaluate key dynamics of social capital that shape earnings: bridging and bonding, reciprocity exchanges and sponsorship, and boundary maintenance. The findings show social capital lends a lift to law graduates through bridges to professional careers and sponsorship following job entry. Racial minorities, however, suffer a shortfall of personal networks to facilitate job searches, and once having secured jobs, minorities experience social closure practices by clients and colleagues that disadvantage them in their professional work. A sizeable earnings gap remains between racial minority and white lawyers after controlling for human and social capitals, social closure practices, and organizational context. This earnings gap is particularly large among racial minorities with more years of experience and those working in large law firms. The findings demonstrate the importance of identifying the interrelations that connect social network and organizational context to impact social inequality.

Access Restricted. View access options
Article
Publication date: 13 January 2025

Andrew D. Holt, Joseph A. Giordano and Nigel White

This paper aims to provide analysis on the state of UK commercial service charge accounting practices when the guiding regulatory framework changed to a mandatory professional…

27

Abstract

Purpose

This paper aims to provide analysis on the state of UK commercial service charge accounting practices when the guiding regulatory framework changed to a mandatory professional standard.

Design/methodology/approach

From a critical review of the accounting requirements of the Royal Institution of Chartered Surveyors (RICS) Professional Standard, the paper develops metrics for measuring the quality of service charge accounts. These metrics are used to measure accounting quality within 154 accounting statements prepared during the first year of the Standard’s implementation.

Findings

The paper identifies conceptual weaknesses in the RICS Professional Standard and poor levels of compliance with many of its accounting requirements. The findings suggest that long-standing issues remain unsolved and also identify new areas of concern within present accounting practices for UK commercial service charges.

Research limitations/implications

The data were obtained from accounting documents prepared by 68 landlords and 40 managing agents for the commercial clients of one UK service charge consultancy company. Although the population is representative of industrywide practice, further longitudinal analysis is required to improve generalisability.

Practical implications

The paper provides performance metrics that stakeholders can use for benchmarking accounting quality. The RICS needs to act to improve accounting practice or risk government intervention. Some corporate landlords must provide higher quality service charge accounts or risk potentially losing occupiers to competing schemes.

Originality/value

This work provides a unique dataset that explores the role of the RICS Professional Standard in improving UK service charge accounting practices.

Details

Journal of Corporate Real Estate , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-001X

Keywords

Access Restricted. View access options
Article
Publication date: 1 March 2001

M. SÖNMEZ, J.B. YANG and G.D. HOLT

Selecting the ‘best’ main contractor is a complex decision process for construction clients. It requires a large number of criteria to be simultaneously measured and evaluated…

376

Abstract

Selecting the ‘best’ main contractor is a complex decision process for construction clients. It requires a large number of criteria to be simultaneously measured and evaluated. Many of these criteria are related to one another in a complex way and therefore, they very often conflict insofar as improvement in one often results in decline of another(s). Furthermore, as contractors' attributes are expressed in both quantitative and qualitative terms, decision‐makers have to base their judgements on both quantitative data and experiential subjective assessments. In this paper, the evidential reasoning (ER) approach (which is capable of processing both quantitative and qualitative measures) is applied as a means of solving the contractor selection problem (CSP). The process of building a multiple criteria decision model of a hierarchical structure is presented, in which both quantitative and qualitative information is represented in a unified manner. The CSP is then fully investigated using the ER approach. Both the advantages of applying this model in practice and the analysis process itself are discussed.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 April 2001

CHEE H. WONG, GARY D. HOLT and PHIL HARRIS

The ‘lowest‐price wins’ philosophy has been a consistent theme of contractor selection over the years. To comprehensively elucidate this selection preference and compare it with…

1596

Abstract

The ‘lowest‐price wins’ philosophy has been a consistent theme of contractor selection over the years. To comprehensively elucidate this selection preference and compare it with the use of a multi‐criteria selection (MCS) approach in the tenderer evaluation process, this paper investigates MCS tender price selection preferences. That is, project‐specific criteria (PSC) and lowest‐price wins selection practices of UK construction clients, in both building and civil engineering works at in detail via results of the empirical survey. The investigation provides further insight into the evaluation of contractors' attributes (i.e. PSC). Levels of importance assigned (LIA) for each criterion were analysed (i.e. quantitative analysis of the differences in opinions and, variance amongst the respondents) in a multivariate statistical method. Importance attached by construction clients to the ‘lowest‐price wins’ philosophy is also presented. Contrast was made between the MCS approach and the ‘lowest‐price wins’ option amongst the surveyed construction clients. It was found that increased awareness of the use of PSC prevailed amongst the survey construction clients. This indicated that cost has to be tempered with the evaluation of PSC and the attempt of construction clients searching for a new evaluation paradigm (i.e. adoption of MCS approach rather than basing on the lowest‐price wins alone).

Details

Engineering, Construction and Architectural Management, vol. 8 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Book part
Publication date: 5 February 2016

Donald Tomaskovic-Devey and Dustin Avent-Holt

After multiple decades stumbling in the status attainment wilderness, the sociological study of inequality is now cultivating a new garden: the workplace generation of…

Abstract

After multiple decades stumbling in the status attainment wilderness, the sociological study of inequality is now cultivating a new garden: the workplace generation of inequalities. While our theories have long focused on contextually embedded social relations – often in production – as generating inequality, our methods have lagged, focusing instead on individual status attainment, abstracted from social relations including those at work. In this chapter, we outline first how we got into this mess, and then advocate a principled comparative methodological framework for studying the organizational generation of durable inequalities. We highlight the particular contribution of Randy Hodson to the original critique of individualistic status attainment research and his role in developing alternative methodologies, some of which we think should be further developed today.

Details

A Gedenkschrift to Randy Hodson: Working with Dignity
Type: Book
ISBN: 978-1-78560-727-1

Access Restricted. View access options
Article
Publication date: 1 January 2002

PETER E.D. LOVE, ZAHIR IRANI, EDDIE CHENG and HENG LI

The construction industry is highly fragmented and adversarial in nature, which has resulted in it being criticized for its poor project performance and lack of innovation. To…

926

Abstract

The construction industry is highly fragmented and adversarial in nature, which has resulted in it being criticized for its poor project performance and lack of innovation. To improve performance, particularly inter‐organizational relations, organizations need to consider the formation of alliances with their project partners. Some construction organ‐ izations are beginning to initiate short‐term alliances with their customers and suppliers as part of a supply chain management strategy. However, such short‐term alliances inhibit feedback, which in turn supports learning and the development of mutual trust and cooperation. It is proffered that construction organizations should consider developing long‐term alliances, so as to enable parties to form learning alliances. The implications of forming different types of strategic alliances/partnering in construction are discussed. An inter‐organizational model that can be used to support learning and is founded on the principles of total quality management (TQM) is described. A case study is used to demonstrate that cooperative relationships can be used to cultivate a culture for reflective learning and mutual trust, beyond merely project‐specific performance improvements.

Details

Engineering, Construction and Architectural Management, vol. 9 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 April 1998

D.G. PROVERBS, G.D. HOLT and P.O. OLOMOLAIYE

A contrast of site productivity levels for an in situ concrete operation (reinforcement fixing) on a high‐rise project amongst construction contractors from Germany, France and…

193

Abstract

A contrast of site productivity levels for an in situ concrete operation (reinforcement fixing) on a high‐rise project amongst construction contractors from Germany, France and the UK is given. The productivity rates provided by contractors' planning engineers for a model construction project form the basis of this evaluation. Conclusions drawn, based on relatively small samples, are considered approximations of the actual productivity levels in each international location. An analysis of variance based on international origin indicates significant differences between these productivity rates. Generally, amongst the sample surveyed, UK and German contractors exhibit the most efficient levels of labour productivity for the operations observed, whilst French contractors are by far the least productive. For the model building, UK contractors are the most productive, requiring less labour input than those from Germany and France. The UK contractors also demonstrate a high degree of performance variation. Leading on from these analyses, a construction (labour) cost comparison indicates the UK to be the most economic location. A comparison with previous research indicates contrasting findings. It is concluded that the performance ranking of French, German and UK contractors will vary depending upon the construction operations concerned, and therefore, assumptions regarding national contracting industries should not be based on individual operations. Contractors could benefit from developing closer links with their international counterparts since this would facilitate dissemination of European ‘best practice’.

Details

Engineering, Construction and Architectural Management, vol. 5 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords