Search results

1 – 10 of 244
Per page
102050
Citations:
Loading...
Available. Content available
Article
Publication date: 17 August 2012

415

Abstract

Details

Grey Systems: Theory and Application, vol. 2 no. 2
Type: Research Article
ISSN: 2043-9377

Available. Open Access. Open Access
Article
Publication date: 16 November 2023

Tao Wang, Shaoliang Wu, Hengqiong Jia, Zhao Wei, Haiyan Li, Piyan Shao, Shanqing Peng and Yi Shi

The construction of cement asphalt (CA) emulsified mortar can obviously disturb the slab status after the fine adjustment. To decrease or eliminate the influence of CA mortar…

239

Abstract

Purpose

The construction of cement asphalt (CA) emulsified mortar can obviously disturb the slab status after the fine adjustment. To decrease or eliminate the influence of CA mortar grouting on track slab geometry status, the effects of grouting funnel, slab pressing method, mortar expansion ratio, seepage ratio and grouting area on China Railway Track System Type (CRTS I) track slab geometry status were discussed in this paper.

Design/methodology/approach

Combined with engineering practice, this paper studied the expansion law of filling layer mortar, the liquid level height of the filling funnel, the pressure plate device and the amount of exudation water and systematically analyzed the influence of filling layer mortar construction on the state of track slab. Relevant precautions and countermeasures were put forward.

Findings

The results showed that the track slab floating values of four corners were different with the CA mortar grouting and the track slab corner near CA mortar grouting hole had the maximum floating values. The anti-floating effect of “7” shaped slab pressing device was more efficient than fixed-joint angle iron, and the slab floating value could be further decreased by increasing the amount of “7” shaped slab pressing devices. After CA mortar grouting, the track slab floating pattern had a close correlation with the expansion rate and water seepage rate of CA mortar over time and the expansion and water seepage rate of the mortar were faster when the temperature was high. Furthermore, the use of strip CA mortar filling under the rail bearing platform on both sides could effectively reduce the float under the track slab, and it could also save mortar consumption and reduce costs.

Originality/value

This study plays an important role in controlling the floating values, CA mortar dosage and the building cost of projects by grouting CA mortar at two flanks of filling space. The research results have guiding significance for the design and construction of China's CRTS I, CRTS II and CRTS III track slab.

Details

Railway Sciences, vol. 2 no. 4
Type: Research Article
ISSN: 2755-0907

Keywords

Available. Open Access. Open Access
Article
Publication date: 13 March 2024

Tao Wang, Shaoliang Wu, Hengqiong Jia, Shanqing Peng, Haiyan Li, Piyan Shao, Zhao Wei and Yi Shi

During the construction process of the China Railway Track System (CRTS) I type filling layer, the nonwoven fabric bags have been used as grouting templates for cement asphalt…

202

Abstract

Purpose

During the construction process of the China Railway Track System (CRTS) I type filling layer, the nonwoven fabric bags have been used as grouting templates for cement asphalt (CA) emulsified mortar. The porous structure of nonwoven fabrics endowed the templates with breathability and water permeability. The standard requires that the volume expansion rate of CA mortar must be controlled within 1%–3%, which can generate expansion pressure to ensure that the cavities under track slabs are filled fully. However, the expansion pressure caused some of the water to seep out from the periphery of the filling bag, and it would affect the actual mix proportion of CA mortar. The differences in physical and mechanical properties between the CA mortar under track slabs and the CA mortar formed in the laboratory were studied in this paper. The relevant results could provide important methods for the research of filling layer materials for CRTS I type and other types of ballastless tracks in China.

Design/methodology/approach

During the inspection of filling layer, the samples of CA mortar from different working conditions and raw materials were taken by uncovering the track slabs and drilling cores. The physical and mechanical properties of CA mortar under the filling layer of the slab were systematically analyzed by testing the electrical flux, compressive strength and density of mortar in different parts of the filling layer.

Findings

In this paper, the electric flux, the physical properties and mechanical properties of different parts of CA mortar under the track slab were investigated. The results showed that the density, electric flux and compressive strength of CA mortar were affected by the composition of raw materials for dry powders and different parts of the filling layer. In addition, the electrical flux of CA mortar gradually decreased within 90 days’ age. The electrical flux of samples with the thickness of 54 mm was lower than 500 C. Therefore, the impermeability and durability of CA mortar could be improved by increasing the thickness of filling layer. Besides, the results showed that the compressive strength of CA mortar increased, while the density and electric flux decreased gradually, with the prolongation of hardening time.

Originality/value

During 90 days' age, the electrical flux of the CA mortar gradually decreased with the increase of specimen thickness and the electrical flux of the specimens with the thickness of 54 mm was lower than 500 C. The impermeability and durability of the CA mortar could be improved by increasing the thickness of filling layer. The proposed method can provide reference for the further development and improvement of CRTS I and CRTS II type ballastless track in China.

Details

Railway Sciences, vol. 3 no. 2
Type: Research Article
ISSN: 2755-0907

Keywords

Available. Open Access. Open Access
Article
Publication date: 13 November 2023

Ming Gao, Anhui Pan, Yi Huang, Jiaqi Wang, Yan Zhang, Xiao Xie, Huanre Han and Yinghua Jia

The type 120 emergency valve is an essential braking component of railway freight trains, but corresponding diaphragms consisting of natural rubber (NR) and chloroprene rubber…

433

Abstract

Purpose

The type 120 emergency valve is an essential braking component of railway freight trains, but corresponding diaphragms consisting of natural rubber (NR) and chloroprene rubber (CR) exhibit insufficient aging resistance and low-temperature resistance, respectively. In order to develop type 120 emergency valve rubber diaphragms with long-life and high-performance, low-temperatureresistant CR and NR were processed.

Design/methodology/approach

The physical properties of the low-temperature-resistant CR and NR were tested by low-temperature stretching, dynamic mechanical analysis, differential scanning calorimetry and thermogravimetric analysis. Single-valve and single-vehicle tests of type 120 emergency valves were carried out for emergency diaphragms consisting of NR and CR.

Findings

The low-temperature-resistant CR and NR exhibited excellent physical properties. The elasticity and low-temperature resistance of NR were superior to those of CR, whereas the mechanical properties of the two rubbers were similar in the temperature range of 0 °C–150 °C. The NR and CR emergency diaphragms met the requirements of the single-valve test. In the low-temperature single-vehicle test, only the low-temperature sensitivity test of the NR emergency diaphragm met the requirements.

Originality/value

The innovation of this study is that it provides valuable data and experience for future development of type 120 valve rubber diaphragms.

Details

Railway Sciences, vol. 3 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

Available. Open Access. Open Access
Article
Publication date: 16 October 2024

Lei Tian, Yuming Sun and Yonggang Jia

To facilitate technical managers and field workers to master and understand the provisions of Technical Management Regulations for Railway more accurately, so as to better serve…

68

Abstract

Purpose

To facilitate technical managers and field workers to master and understand the provisions of Technical Management Regulations for Railway more accurately, so as to better serve the comprehensive revision of the Regulations, this paper carries out the research on the traceability and evolution of the provisions of the Regulations.

Design/methodology/approach

This paper studies and analyzes the evolution of the 11th edition of the Regulations by analyzing the relevance of clauses and summarizes the historical background of the development of calendar editions of the Regulations. The basic research on the traceability and evolution of the Regulations is carried out from four aspects: the continuity of the development of the Regulations, the authority of contents, the relevance of clauses and the richness of historical materials.

Findings

From the first edition of the Regulations issued by the former Ministry of Railways in 1950 to the 11th edition, there have been ten comprehensive revisions. There is a strong correlation and continuity between the calendar editions of the Regulations in terms of chapter structure and clauses. Studying the context of the terms of the Regulations is an important way to understand and master the current clauses of the Regulations.

Originality/value

Through the research on the traceability and evolution of the clauses of the Regulations, one is to explore the context of the development of railway technical equipment in China, the other is to clarify the historical background when the provisions were formulated and the third is to trace the development and evolution of the provisions. The revision of the Regulations is based on an accurate grasp of the context of the provisions, which can effectively judge the possible security risks caused by the revision of the provisions and avoid the possible risks in field implementation from the source.

Available. Open Access. Open Access
Article
Publication date: 28 March 2022

Yunfei Li, Shengbo Eben Li, Xingheng Jia, Shulin Zeng and Yu Wang

The purpose of this paper is to reduce the difficulty of model predictive control (MPC) deployment on FPGA so that researchers can make better use of FPGA technology for academic…

1565

Abstract

Purpose

The purpose of this paper is to reduce the difficulty of model predictive control (MPC) deployment on FPGA so that researchers can make better use of FPGA technology for academic research.

Design/methodology/approach

In this paper, the MPC algorithm is written into FPGA by combining hardware with software. Experiments have verified this method.

Findings

This paper implements a ZYNQ-based design method, which could significantly reduce the difficulty of development. The comparison with the CPU solution results proves that FPGA has a significant acceleration effect on the solution of MPC through the method.

Research limitations implications

Due to the limitation of practical conditions, this paper cannot carry out a hardware-in-the-loop experiment for the time being, instead of an open-loop experiment.

Originality value

This paper proposes a new design method to deploy the MPC algorithm to the FPGA, reducing the development difficulty of the algorithm implementation on FPGA. It greatly facilitates researchers in the field of autonomous driving to carry out FPGA algorithm hardware acceleration research.

Details

Journal of Intelligent and Connected Vehicles, vol. 5 no. 2
Type: Research Article
ISSN: 2399-9802

Keywords

Available. Open Access. Open Access
Article
Publication date: 5 May 2022

Jia He, Na Yan, Jian Zhang, Yang Yu and Tao Wang

This paper aims to optimize the charging schedule for battery electric buses (BEBs) to minimize the charging cost considering the time-of-use electricity price.

1570

Abstract

Purpose

This paper aims to optimize the charging schedule for battery electric buses (BEBs) to minimize the charging cost considering the time-of-use electricity price.

Design/methodology/approach

The BEBs charging schedule optimization problem is formulated as a mixed-integer linear programming model. The objective is to minimize the total charging cost of the BEB fleet. The charge decision of each BEB at the end of each trip is to be determined. Two types of constraints are adopted to ensure that the charging schedule meets the operational requirements of the BEB fleet and that the number of charging piles can meet the demand of the charging schedule.

Findings

This paper conducts numerical cases to validate the effect of the proposed model based on the actual timetable and charging data of a bus line. The results show that the total charge cost with the optimized charging schedule is 15.56% lower than the actual total charge cost under given conditions. The results also suggest that increasing the number of charging piles can reduce the charging cost to some extent, which can provide a reference for planning the number of charging piles.

Originality/value

Considering time-of-use electricity price in the BEBs charging schedule will not only reduce the operation cost of electric transit but also make the best use of electricity resources.

Details

Journal of Intelligent and Connected Vehicles, vol. 5 no. 2
Type: Research Article
ISSN: 2399-9802

Keywords

Available. Open Access. Open Access
Article
Publication date: 20 July 2020

Lijuan Shi, Zuoning Jia, Huize Sun, Mingshu Tian and Liquan Chen

This paper aims to study the affecting factors on bird nesting on electronic railway catenary lines and the impact of bird nesting events on railway operation.

3351

Abstract

Purpose

This paper aims to study the affecting factors on bird nesting on electronic railway catenary lines and the impact of bird nesting events on railway operation.

Design/methodology/approach

First, with one year’s bird nest events in the form of unstructured natural language collected from Shanghai Railway Bureau, the records were structured with the help of python software tool. Second, the method of root cause analysis (RCA) was used to identify all the possible influencing factors which are inclined to affect the probability of bird nesting. Third, the possible factors then were classified into two categories to meet subsequent analysis separately, category one was outside factors (i.e. geographic conditions related factors), the other was inside factors (i.e. railway related factors).

Findings

It was observed that factors of city population, geographic position affect nesting observably. Then it was demonstrated that both location and nesting on equipment part have no correlation with delay, while railway type had a significant but low correlation with delay.

Originality/value

This paper discloses the principle of impacts of nest events on railway operation.

Details

Smart and Resilient Transportation, vol. 2 no. 1
Type: Research Article
ISSN: 2632-0487

Keywords

Available. Open Access. Open Access
Article
Publication date: 14 December 2023

Huijuan Zhou, Rui Wang, Dongyang Weng, Ruoyu Wang and Yaoqin Qiao

The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making…

416

Abstract

Purpose

The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making the train stranded in the interval between stations. This study aims to reduce the impact of interrupt events and improve service levels.

Design/methodology/approach

To address this issue, this paper considers the constraints of train operation safety, capacity and dynamic passenger flow demand. It proposes a method for adjusting small loops during interruption events and constructs a train operation adjustment model with the objective of minimizing the total passenger waiting time. This model enables the rapid development of train operation plans in interruption scenarios, coordinating train scheduling and line resources to minimize passenger travel time and mitigate the impact of interruptions. Regarding the proposed train operation adjustment model, an improved genetic algorithm (GA) is designed to solve it.

Findings

The model and algorithm are applied to a case study of interruption events on Beijing Subway Line 5. The results indicate that after solving the constructed model, the train departure intervals can be maintained between 1.5 min and 3 min. This ensures both the safety of train operations on the line and a good match with passengers’ travel demands, effectively reducing the total passenger waiting time and improving the service level of the urban rail transit system during interruptions. Compared to the GA algorithm, the algorithm proposed in this paper demonstrates faster convergence speed and better computational results.

Originality/value

This study explicitly outlines the adjustment method of using short-turn operation during operational interruptions, with train departure times and station stop times as decision variables. It takes into full consideration safety constraints on train operations, train capacity constraints and dynamic passenger demand. It has constructed a train schedule optimization model with the goal of minimizing the total waiting time for all passengers in the system.

Available. Open Access. Open Access
Article
Publication date: 10 December 2020

Huiru Zhang, Limin Jia, Li Wang and Yong Qin

Based on complex network theory, a method for critical elements identification of China Railway High-speed 2 (CRH2) train system is introduced in this paper.

816

Abstract

Purpose

Based on complex network theory, a method for critical elements identification of China Railway High-speed 2 (CRH2) train system is introduced in this paper.

Design/methodology/approach

First, two methods, reliability theory and complex theory, are introduced, and the advantages and disadvantages for their application in identifying critical elements of high-speed train system are summarized. Second, a multi-layer multi-granularity network model including virtual and actual nodes is proposed, and the corresponding fusion rules for the same nodes in different layers are given.

Findings

Finally, taking CRH2 train system as an example, the critical elements are identified by using complex network theory, which provides a reference for train operation and maintenance.

Originality/value

A method of identifying key elements of CRH2 train system based on integrated importance indices is introduced, which is a meaningful extension of the application of complex network theory to identify key components.

Details

Smart and Resilient Transportation, vol. 2 no. 1
Type: Research Article
ISSN: 2632-0487

Keywords

1 – 10 of 244
Per page
102050