Search results
1 – 10 of 15Lukas Zenk, Dirk J. Primus and Stephan Sonnenburg
Do LEGO® SERIOUS PLAY® (LSP) workshops result in improved experience of flow components as well as higher levels of creative output than traditional meetings (MEET)? This research…
Abstract
Purpose
Do LEGO® SERIOUS PLAY® (LSP) workshops result in improved experience of flow components as well as higher levels of creative output than traditional meetings (MEET)? This research studies the extent to which LSP, as a specialized material-mediated and process-oriented cocreative workshop setting, differs from MEET, a traditional workshop setting. Hypotheses for differences in individual flow components (autotelic behavior, happiness, balance), group flow components (equal participation, continuous communication) and creative output were developed and tested in a quasi-experimental comparison between LSP and MEET.
Design/methodology/approach
The study was conducted with 39 practitioners in six teams from various industries. In total, 164 observations were collected during two workshops using the Experience Sampling Method. The creative output was assessed by peer evaluations of all participants, followed by structural analysis and quantitative group comparisons.
Findings
The results show that two components of individual flow experience (autotelic behavior, happiness) were significantly higher in LSP, and one of the components of group flow experience (continuous communication) was, as expected, significantly lower. Regarding creative output, the LSP teams outperformed the MEET teams. The study suggests that a process-oriented setting that includes time for individuals to independently explore their ideas using a different kind of material in the presence of other participants has a significant influence on the team result.
Practical implications
LSP can improve the components of participants' flow experience to have an impact on the creative output of teams. In cocreative settings like LSP, teams benefit from a combination of alone time and high-quality collaborative activities using boundary objects and a clear process to share their ideas.
Originality/value
This is the first quasi-experimental study with management practitioners as participants to compare LSP with a traditional and widespread workshop approach in the context of flow experience and creative output.
Details
Keywords
Duncan Maxwell and Rachel Couper
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…
Abstract
Purpose
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.
Design/methodology/approach
From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.
Findings
The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.
Originality/value
As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.