Search results

1 – 10 of over 2000
Article
Publication date: 23 January 2020

Zhuolin She, Quan Li, Manuel London, Baiyin Yang and Bin Yang

The purpose of this paper is to examine the relationships between CEO narcissism and strategic decision-making (SDM) processes (decision comprehensiveness and decision speed), and…

1892

Abstract

Purpose

The purpose of this paper is to examine the relationships between CEO narcissism and strategic decision-making (SDM) processes (decision comprehensiveness and decision speed), and to explore the mediating role of top management team (TMT) members’ participation in decision making and the moderating role of TMT power distance.

Design/methodology/approach

Data were collected from a multisource, time-lagged survey of 103 CEOs and their corresponding TMT members in China. Structural equation modeling was used to test the hypothesized relationships.

Findings

The results indicated that CEO narcissism was negatively related to decision comprehensiveness and positively related to decision speed. These relationships were mediated by TMT members’ participation in decision making, especially when TMT power distance was high.

Practical implications

The results show the potential negative effects of CEOs’ narcissistic personality and suggest ways to attenuate it by increasing TMT participation and decreasing TMT power distance.

Originality/value

This study is an initial attempt to empirically examine how and under what conditions CEOs’ narcissism is a barrier to more comprehensive and more deliberate (slower) SDM.

Details

Journal of Managerial Psychology, vol. 35 no. 1
Type: Research Article
ISSN: 0268-3946

Keywords

Article
Publication date: 14 October 2020

Yang Gao, Fuwei Wang, Shaohu Ding, Bin Yang, Lin Liu and Mohammad Salmani

This study aims to investigate the vibration effects on ball grid array lifetime.

Abstract

Purpose

This study aims to investigate the vibration effects on ball grid array lifetime.

Design/methodology/approach

Several finite element method simulations and experiments were performed.

Findings

An optimized circuit configuration was found.

Originality/value

The originality of paper is confirmed by authors.

Details

Soldering & Surface Mount Technology, vol. 33 no. 1
Type: Research Article
ISSN: 0954-0911

Keywords

Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2020

Qingchao Sun, Qingyuan Lin, Bin Yang, Xianlian Zhang and Lintao Wang

Bolted joints are the most common type of mechanical connections, and improving the anti-loosening performance of bolts for the reliable performance of mechanical and building…

Abstract

Purpose

Bolted joints are the most common type of mechanical connections, and improving the anti-loosening performance of bolts for the reliable performance of mechanical and building structures is highly significant.

Design/methodology/approach

Because of the lack of sufficient theoretical basis for the evaluation and design of anti-loosening bolts, a quantitative evaluation model exhibiting the following two evaluation criteria for anti-loosening bolts is introduced: bolt rotation angular acceleration criterion and critical transverse load criterion. Based on the relationship among bolt tension, transverse load and bolt rotation angular acceleration, a critical transverse load calculation model is put forward, and the mechanism by which the critical transverse load increases with the increase of bolt tension is revealed.

Findings

Based on the above model, a new type of anti-loosening bolt is designed, which generates additional bolt tension when the transverse load increases, and then improves the critical transverse load of the bolt. The effectiveness of the new type of anti-loosening bolt is verified by theoretical calculations and experiments.

Originality/value

The proposed model and method set a preliminary theoretical foundation for the evaluation of bolt anti-loosening performance and the design of a new anti-loosening bolt.

Details

Assembly Automation, vol. 40 no. 4
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 18 February 2019

Yijun Zhou, Yu Yang and Jyh-Bin Yang

Effective BIM application hinges on the development of appropriate strategies for its implementation. Though some strategies have been deployed to facilitate BIM implementation in…

3270

Abstract

Purpose

Effective BIM application hinges on the development of appropriate strategies for its implementation. Though some strategies have been deployed to facilitate BIM implementation in China, their outcomes are not clear. The purpose of this paper is to provide recommendations regarding appropriate strategies for promoting the development and implementation of BIM in China based on lessons learned from advanced implementation experiences in other countries.

Design/methodology/approach

First, existing strategies are investigated and barriers to BIM implementation mentioned in previous studies are summarized. Then, the identified barriers are mapped to the strategy contents. Finally, a comparative analysis on different areas is conducted to propose suggestions for identified items of BIM implementation strategies that need to be improved.

Findings

Six unaddressed barriers to BIM implementation strategies in China were identified from the mapping results: insufficient government lead/direction, organizational issues, legal issues, high cost of application, resistance to change of thinking mode and insufficient external motivation.

Originality/value

The findings of this study can be used to facilitate the development of appropriate strategies within the public and private sectors for promoting BIM implementation in China and elsewhere.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 October 2024

Yanyan Shi, Hao Su, Meng Wang, Hanxiao Dou, Bin Yang and Feng Fu

In the brain imaging based on electrical impedance tomography, it is sometimes not able to attach 16 electrodes due to space restriction caused by craniotomy. As a result of this…

Abstract

Purpose

In the brain imaging based on electrical impedance tomography, it is sometimes not able to attach 16 electrodes due to space restriction caused by craniotomy. As a result of this, the number of boundary measurements decreases, and spatial resolution of reconstructed conductivity distribution is reduced. The purpose of this study is to enhance reconstruction quality in cases of limited measurement.

Design/methodology/approach

A new data expansion method based on the shallow convolutional neural network is proposed. An eight-electrode model is built from which fewer boundary measurements can be obtained. To improve the imaging quality, shallow convolutional neural network is constructed which maps limited voltage data of the 8-electrode model to expanded voltage data of a quasi-16-electrode model. The predicted data is compared with the quasi-16-electrode data. Besides, image reconstruction based on L1 regularization method is conducted.

Findings

The results show that the predicted data generally coincides with the quasi-16-electrode data. It is found that images reconstructed with the data of eight-electrode model are the poorest. Nevertheless, imaging results when the limited data is expanded by the proposed method show large improvement, and there is a minor difference with the images recovered with the quasi-16-electrode data. Also, the impact of noise is studied, which shows that the proposed method is robust to noise.

Originality/value

To enhance reconstruction quality in the case of limited measurement, a new data expansion method based on the shallow convolutional neural network is proposed. Both simulation work and phantom experiments have demonstrated that high-quality images of cerebral hemorrhage and cerebral ischemia can be obtained when the limited measurement is expanded by the proposed method.

Details

Sensor Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0260-2288

Keywords

Open Access
Article
Publication date: 30 August 2021

Kailun Feng, Shiwei Chen, Weizhuo Lu, Shuo Wang, Bin Yang, Chengshuang Sun and Yaowu Wang

Simulation-based optimisation (SO) is a popular optimisation approach for building and civil engineering construction planning. However, in the framework of SO, the simulation is…

1683

Abstract

Purpose

Simulation-based optimisation (SO) is a popular optimisation approach for building and civil engineering construction planning. However, in the framework of SO, the simulation is continuously invoked during the optimisation trajectory, which increases the computational loads to levels unrealistic for timely construction decisions. Modification on the optimisation settings such as reducing searching ability is a popular method to address this challenge, but the quality measurement of the obtained optimal decisions, also termed as optimisation quality, is also reduced by this setting. Therefore, this study aims to develop an optimisation approach for construction planning that reduces the high computational loads of SO and provides reliable optimisation quality simultaneously.

Design/methodology/approach

This study proposes the optimisation approach by modifying the SO framework through establishing an embedded connection between simulation and optimisation technologies. This approach reduces the computational loads and ensures the optimisation quality associated with the conventional SO approach by accurately learning the knowledge from construction simulations using embedded ensemble learning algorithms, which automatically provides efficient and reliable fitness evaluations for optimisation iterations.

Findings

A large-scale project application shows that the proposed approach was able to reduce computational loads of SO by approximately 90%. Meanwhile, the proposed approach outperformed SO in terms of optimisation quality when the optimisation has limited searching ability.

Originality/value

The core contribution of this research is to provide an innovative method that improves efficiency and ensures effectiveness, simultaneously, of the well-known SO approach in construction applications. The proposed method is an alternative approach to SO that can run on standard computing platforms and support nearly real-time construction on-site decision-making.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2022

Weijie Zhou, Yi Zhang, Bin Yang, Xing Lei, Zhaowen Hu and Wei Wang

This study aims to investigate the microtopography transformation at a low-speed heavy-load interface with the lubrication of powder particles and its nonlinear friction effect on…

Abstract

Purpose

This study aims to investigate the microtopography transformation at a low-speed heavy-load interface with the lubrication of powder particles and its nonlinear friction effect on the sliding pair in contact.

Design/methodology/approach

Based on the universal mechanical tester (UMT) tribometer and VK shape-measuring laser microscope, comparative friction experiments were conducted with graphite powder lubrication. The friction coefficient with nonlinear fluctuations and the three-dimensional morphology of the boundary layer at the interface were observed and analyzed under different operating conditions. The effects on lubrication mechanisms and frictional nonlinearity at the sliding pair were focused on under different surface roughness and powder layer thickness conditions.

Findings

At a certain external load and sliding speed, the initial specimen surface with an appropriate initial roughness and powder thickness can store and bond the powder lubricant to form a boundary film readily. The relatively flat and firm boundary layer of powder at the microscopic interface can reduce the coefficient of friction and suppress its nonlinear fluctuation effectively. Therefore, proper surface roughness and powder layer thickness are beneficial to the graphite lubrication and stability maintenance of a friction pair.

Originality/value

This research is conducive to developing a deep understanding of the microtopography transformation with frictional nonlinearity at a low-speed heavy-load interface with graphite powder lubrication.

Details

Industrial Lubrication and Tribology, vol. 74 no. 5
Type: Research Article
ISSN: 0036-8792

Keywords

Article
Publication date: 16 June 2023

Jyh-Bin Yang and Tzu-Hua Lai

This study aims to review earned value management (EVM)-relative methods, including the original EVM, earned schedule method (ESM) and earned duration management (EDM(t)). This…

Abstract

Purpose

This study aims to review earned value management (EVM)-relative methods, including the original EVM, earned schedule method (ESM) and earned duration management (EDM(t)). This study then proposes a general implementation procedure and some basic principles for the selection of EVM-relative methods.

Design/methodology/approach

After completing an intensive literature review, this study conducts a case study to examine the forecasting performance of project duration using the EVM, ESM and EDM(t) methods.

Findings

When the project is expected to finish on time, ESM with a performance factor equal to 1 is the recommended method. EDM(t) would be the most reliable method during a project's entire lifetime if EDM(t) is expected to be delayed based on past experience.

Research limitations/implications

As this research conducts a case study with only one building construction project, the results might not hold true for all types of construction projects.

Practical implications

EVM, ESM and EDM(t) are simple and data-accessible methods. With the help of a general implementation procedure, applying all three methods would be better. The power of the three methods is definitely larger than that of choosing only one for complex construction projects.

Originality/value

Previous studies have discussed the advantages and disadvantages of EVM, ESM and EDM(t). This study amends the available outcomes. Thus, for schedulers or researchers interested in implementing EVM, ESM and EDM(t), this study can provide more constructive instructions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 October 2021

He-Wei Zhao and Li-bin Yang

This paper aims to discuss the precise altitude and velocity tracking control of a hypersonic vehicle, a global adaptive neural backstepping controller was studied based on a…

Abstract

Purpose

This paper aims to discuss the precise altitude and velocity tracking control of a hypersonic vehicle, a global adaptive neural backstepping controller was studied based on a disturbance observer (DOB).

Design/methodology/approach

The DOB combined with a radial basis function (RBF) neural network (NN) was used to estimate the disturbance terms that are generated by the flexible modes of the hypersonic vehicle system. A global adaptive neural method was introduced to approximate the unknown system dynamics, with robust control terms pulling the system transient states back into the neural approximation domain externally.

Findings

The globally uniformly ultimately bounded for all signals of a closed-loop system can be guaranteed by the proposed control algorithm. Additionally, the command filtered backstepping methods can avoid the explosion of the complexity problem caused by the backstepping design process. In addition, the effectiveness of the proposed controller can be verified by the simulation used in this study.

Research limitations/implications

Normally lateral dynamics issue should be discussed in the process of control system designed, the lateral dynamics are not included in the nonlinear dynamic model of hypersonic vehicle used in this paper, merely the longitudinal flight dynamics are discussed in this paper.

Originality/value

The flexible states in rigid modes are considered as the disturbance of the system, which is estimated by structuring DOB with NN approximations. The compensating tracking error and prediction error are used in the update law of RBF NN weight. The differential explosions complexity derived from the backstepping procedure is dealt with by using command filters.

Details

Aircraft Engineering and Aerospace Technology, vol. 94 no. 4
Type: Research Article
ISSN: 1748-8842

Keywords

1 – 10 of over 2000