Search results

1 – 3 of 3
Article
Publication date: 3 September 2024

Ziwang Xiao, Fengxian Zhu, Lifeng Wang, Rongkun Liu and Fei Yu

As an important load-bearing component of cable-stayed bridge, the cable-stayed cable is an important load-bearing link for the bridge superstructure and the load transferred…

Abstract

Purpose

As an important load-bearing component of cable-stayed bridge, the cable-stayed cable is an important load-bearing link for the bridge superstructure and the load transferred directly to the bridge tower. In order to better manage the risk of the cable system in the construction process, the purpose of this paper is to study a new method of dynamic risk analysis of the cable system of the suspended multi-tower cable-stayed bridge based on the Bayesian network.

Design/methodology/approach

First of all, this paper focuses on the whole process of the construction of the cable system, analyzes the construction characteristics of each process, identifies the safety risk factors in the construction process of the cable system, and determines the causal relationship between the risk factors. Secondly, the prior probability distribution of risk factors is determined by the expert investigation method, and the risk matrix method is used to evaluate the safety risk of cable failure quantitatively. The function expression of risk matrix is established by combining the probability of risk event occurrence and loss level. After that, the topology structure of Bayesian network is established, risk factors and probability parameters are incorporated into the network and then the Bayesian principle is applied to update the posterior probability of risk events according to the new information in the construction process. Finally, the construction reliability evaluation of PAIRA bridge main bridge cable system in Bangladesh is taken as an example to verify the effectiveness and accuracy of the new method.

Findings

The feasibility of using Bayesian network to dynamically assess the safety risk of PAIRA bridge in Bangladesh is verified by the construction reliability evaluation of the main bridge cable system. The research results show that the probability of the accident resulting from the insufficient safety of the cable components of the main bridge of PAIRA bridge is 0.02, which belongs to a very small range. According to the analysis of the risk grade matrix, the risk grade is Ⅱ, which belongs to the acceptable risk range. In addition, according to the reverse reasoning of the Bayesian model, when the serious failure of the cable system is certain to occur, the node with the greatest impact is B3 (cable break) and its probability of occurrence is 82%, that is, cable break is an important reason for the serious failure of the cable system. The factor that has the greatest influence on B3 node is C6 (cable quality), and its probability is 34%, that is, cable quality is not satisfied is the main reason for cable fracture. In the same way, it can be obtained that the D9 (steel wire fracture inside the cable) event of the next level is the biggest incentive of C6 event, its occurrence probability is 32% and E7 (steel strand strength is not up to standard) event is the biggest incentive of D9 event, its occurrence probability is 13%. At the same time, the sensitivity analysis also confirmed that B3, C6, D9 and E7 risk factors were the main causes of risk occurrence.

Originality/value

This paper proposes a Bayesian network-based construction reliability assessment method for cable-stayed bridge cable system. The core purpose of this method is to achieve comprehensive and accurate management and control of the risks in the construction process of the cable system, so as to improve the service life of the cable while strengthening the overall reliability of the structure. Compared with the existing evaluation methods, the proposed method has higher reliability and accuracy. This method can effectively assess the risk of the cable system in the construction process, and is innovative in the field of risk assessment of the cable system of cable-stayed bridge construction, enriching the scientific research achievements in this field, and providing strong support for the construction risk control of the cable system of cable-stayed bridge.

Details

International Journal of Structural Integrity, vol. 15 no. 5
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 14 February 2023

Zhixiu Wang, Lifeng Shi and Haiqian Cui

The operation mode of enterprises will affect its resource commitment in the host country, involving different costs and time, as well as risks. Yet, the current state of…

Abstract

Purpose

The operation mode of enterprises will affect its resource commitment in the host country, involving different costs and time, as well as risks. Yet, the current state of knowledge about how the institutional environment affects the operation mode change of international construction enterprises is equivocal. This study aims to explore the impact of a host country's institutional environment on the operation mode change of international construction enterprises.

Design/methodology/approach

First, this study proposes a model on the impact of the institutional environment on the operation mode change of international construction enterprises. Second, this study used the Worldwide Governance Indicators (WGI) published by the World Bank and a questionnaire survey to collect data. Finally, the study employs a multiple regression methodology to test the hypothesis and discusses the results.

Findings

Results highlight that the important impact of the institutional environment on the operation mode change of international construction enterprises. The results showed that enterprises are more willing to increase resource commitments under the condition of stable institutional environment. In addition, enterprises' market-specific experience and general international experience, as moderating variables, weaken the impact of the institutional environment on the operation mode change. However, general international experience has no significant moderating effect.

Practical implications

The findings of this study provide practical implications for the investment risk assessment of international construction enterprises. Enterprises need to consider the change in institutional quality and institutional instability of the host country, as well as their own international experience when changing operation mode.

Originality/value

This study extends internationalization theory to the international construction field and provided theoretical guidance for the mechanism of operation mode change of international construction enterprises.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 July 2024

Hao Zhang, Xingwei Li and Zuoyi Ding

Although many countries are focusing on the management of construction and demolition waste (CDW) resource utilization, the effect of risk aversion of the green innovation-led…

Abstract

Purpose

Although many countries are focusing on the management of construction and demolition waste (CDW) resource utilization, the effect of risk aversion of the green innovation-led enterprise on the performance of the CDW resource utilization supply chain is unclear when considering different green innovation contexts (green innovation led by the building materials remanufacturer or by the construction waste recycler). This study aims to investigate how the level of risk aversion of the green innovation-led enterprise affects CDW resource utilization under different green innovation contexts based on contingency theory.

Design/methodology/approach

Using Stackelberg game theory, this study establishes a decision model consisting of a building materials remanufacturer, construction waste recycler and CDW production unit and investigates how the level of risk aversion of the green innovation-led enterprise under different green innovation contexts influences the performance level of the supply chain.

Findings

The conclusions are as follows. (1) For the green innovation-led enterprise, the risk-averse behaviour is always detrimental to his own profits. (2) For the follower, the profits of the construction waste recycler are negatively correlated with the level of risk aversion of the green innovation-led enterprise in the case of a small green innovation investment coefficient. If the green innovation investment coefficient is high, the opposite result is obtained. (3) When the green innovation investment coefficient is low, the total supply chain profits decrease as the level of risk aversion of the green innovation-led enterprise increases. When the green innovation investment coefficient is high, total supply chain profit shows an inverted U-shaped trend with respect to the degree of risk aversion of the green innovation-led enterprise.

Originality/value

(1) This study is the first to construct a green innovation context led by different enterprises in the CDW resource utilization supply chain, which provides a new perspective on green management and operation. (2) This study is the first to explore the operation mechanism of the CDW resource utilization supply chain based on contingency theory, which provides new evidence from the CDW resource utilization supply chain to prove contingency theory. At the same time, this study examines the interactive effects of the green innovation cost coefficient and the degree of risk aversion of green innovation-led enterprises on the performance of supply chain members, expanding the contingency theory research on contingencies affecting enterprise performance. (3) This study will guide members of the CDW resource utilization supply chain to rationally face risks and achieve optimal supply chain performance.

Details

Management Decision, vol. 62 no. 12
Type: Research Article
ISSN: 0025-1747

Keywords

Access

Year

Last 6 months (3)

Content type

1 – 3 of 3