An evaluation method of construction reliability of cable system of cable-stayed bridge based on Bayesian network
International Journal of Structural Integrity
ISSN: 1757-9864
Article publication date: 3 September 2024
Issue publication date: 30 September 2024
Abstract
Purpose
As an important load-bearing component of cable-stayed bridge, the cable-stayed cable is an important load-bearing link for the bridge superstructure and the load transferred directly to the bridge tower. In order to better manage the risk of the cable system in the construction process, the purpose of this paper is to study a new method of dynamic risk analysis of the cable system of the suspended multi-tower cable-stayed bridge based on the Bayesian network.
Design/methodology/approach
First of all, this paper focuses on the whole process of the construction of the cable system, analyzes the construction characteristics of each process, identifies the safety risk factors in the construction process of the cable system, and determines the causal relationship between the risk factors. Secondly, the prior probability distribution of risk factors is determined by the expert investigation method, and the risk matrix method is used to evaluate the safety risk of cable failure quantitatively. The function expression of risk matrix is established by combining the probability of risk event occurrence and loss level. After that, the topology structure of Bayesian network is established, risk factors and probability parameters are incorporated into the network and then the Bayesian principle is applied to update the posterior probability of risk events according to the new information in the construction process. Finally, the construction reliability evaluation of PAIRA bridge main bridge cable system in Bangladesh is taken as an example to verify the effectiveness and accuracy of the new method.
Findings
The feasibility of using Bayesian network to dynamically assess the safety risk of PAIRA bridge in Bangladesh is verified by the construction reliability evaluation of the main bridge cable system. The research results show that the probability of the accident resulting from the insufficient safety of the cable components of the main bridge of PAIRA bridge is 0.02, which belongs to a very small range. According to the analysis of the risk grade matrix, the risk grade is Ⅱ, which belongs to the acceptable risk range. In addition, according to the reverse reasoning of the Bayesian model, when the serious failure of the cable system is certain to occur, the node with the greatest impact is B3 (cable break) and its probability of occurrence is 82%, that is, cable break is an important reason for the serious failure of the cable system. The factor that has the greatest influence on B3 node is C6 (cable quality), and its probability is 34%, that is, cable quality is not satisfied is the main reason for cable fracture. In the same way, it can be obtained that the D9 (steel wire fracture inside the cable) event of the next level is the biggest incentive of C6 event, its occurrence probability is 32% and E7 (steel strand strength is not up to standard) event is the biggest incentive of D9 event, its occurrence probability is 13%. At the same time, the sensitivity analysis also confirmed that B3, C6, D9 and E7 risk factors were the main causes of risk occurrence.
Originality/value
This paper proposes a Bayesian network-based construction reliability assessment method for cable-stayed bridge cable system. The core purpose of this method is to achieve comprehensive and accurate management and control of the risks in the construction process of the cable system, so as to improve the service life of the cable while strengthening the overall reliability of the structure. Compared with the existing evaluation methods, the proposed method has higher reliability and accuracy. This method can effectively assess the risk of the cable system in the construction process, and is innovative in the field of risk assessment of the cable system of cable-stayed bridge construction, enriching the scientific research achievements in this field, and providing strong support for the construction risk control of the cable system of cable-stayed bridge.
Keywords
Acknowledgements
This study is supported by five funds: The Fundamental Research Funds for the Central Universities (2572024BR07); The Key Research and Development Program of Heilongjiang Province, China (JD22A012); The Key Research and Development Plan Guidance Program of Heilongjiang Province, China (GZ20230065, GZ20210206); Science and Technology Project of Department of Transportation of Heilongjiang Province (HJK2023B001).
Citation
Xiao, Z., Zhu, F., Wang, L., Liu, R. and Yu, F. (2024), "An evaluation method of construction reliability of cable system of cable-stayed bridge based on Bayesian network", International Journal of Structural Integrity, Vol. 15 No. 5, pp. 1027-1050. https://doi.org/10.1108/IJSI-06-2024-0079
Publisher
:Emerald Publishing Limited
Copyright © 2024, Emerald Publishing Limited