A Light Aeroplane in Production: Some Details of the North American Navion Manufacturing and Tooling Processes Applied as the Outcome of Wartime Experience
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 January 1947
Abstract
ON a system of mechanized conveyors very similar to its wartime P‐51 Mustang line, North American Aviation, Inc. on the Los Angeles Municipal Airport is turning out Navions at the rate of six per day. Scheduled production called for ten per day before the end of 1946.
Citation
(1947), "A Light Aeroplane in Production: Some Details of the North American Navion Manufacturing and Tooling Processes Applied as the Outcome of Wartime Experience", Aircraft Engineering and Aerospace Technology, Vol. 19 No. 1, pp. 29-31. https://doi.org/10.1108/eb031462