Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

51 – 60 of 600
Applied filters:
Accounting and Finance
Environmental Management
Operations and Logistics
Public Sector Management
Clear all
Case study
Publication date: 6 January 2023

Umesh Mahtani, Arpita Neeraj Amarnani and Vithal Sukhathankar

▪ Students learn how an educational institute impacts water resources on the campus and its surrounding community.▪ Students acquire knowledge on how decision-making, related to…

Abstract

Learning outcomes

▪ Students learn how an educational institute impacts water resources on the campus and its surrounding community.

▪ Students acquire knowledge on how decision-making, related to natural resources, is influenced by the institute’s obligations towards surrounding communities and the long-term sustainability of the resources.

▪ Students become acquainted with the decision-making process adopted by an educational institute for achieving resource-efficient development on the campus.

▪ Students learn how to design evaluation methods for investments related to water conservation at an educational institute.

▪ Students become proficient with the payback method specifically when evaluating water-enhancing projects at an educational campus.

Case overview/synopsis

Dr Ajit Parulekar, Director at Goa Institute of Management (GIM), Goa, India, was evaluating options to improve the sources of water at GIM at the beginning of 2021. He was reviewing the projects proposed to meet the water requirement at the campus for the next five years (2021–2025). The projects were recommended by consultants (ENV Consultants Pvt Ltd) who proposed a total expenditure of US$68,667 which involved storage enhancement and water table upgradation (See Case Exhibit 11). The maintenance department had studied the plans but their projections showed that the execution of these projects and initiatives would still lead to a deficit of water in the future. Dr Parulekar reviewed the reports and weighed the expected tangible and intangible benefits from the proposed projects. The projects had to be carefully selected, keeping in mind the multiple objectives to be met: an increase in water supply within a short time, a financially optimum investment and a minimum impact on the surrounding community. The selected projects had to meet the long-term sustainability objective of resource efficiency at the campus.

Complexity academic level

Students studying finance, project appraisal, campus sustainability at graduate or postgraduate management programs.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Case study
Publication date: 16 December 2022

Chek Derashid, Zarifah Abdullah, Halimah@Nasibah Ahmad, Natrah Saad, Ayoib Che Ahmad and G.V. Muralidhara

Perform relevant analysis (financial and non-financial) related to investment decision-making.

Make decision based on the analysis.

Abstract

Learning outcomes

Perform relevant analysis (financial and non-financial) related to investment decision-making.

Make decision based on the analysis.

Case overview/synopsis

Jade Sdn. Bhd. (JADE), since its establishment, has been mainly involved in providing services in facility management and cleaning services. Apart from these main services, JADE was also involved in hospitality management, travel and tours, and agribusiness. The current involvements were already varied, and the Board was thinking of furthering the diversification activity to generate more revenues. As the Chief Executive Officer (CEO) of JADE, Ahmad was required to conduct the necessary analysis and provide his recommendation to the Board whether JADE should proceed with the purchase of Tulip Garden Hotel (TULIP). He had one month to act before proposing his recommendation to the Board.

Complexity academic level

Undergraduate and Postgraduate

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Case study
Publication date: 16 December 2022

Peeyush Pandey, Patel Jinil Ashvinbhai, Yushmita Singh, Tania Mittal, Ishank Goel, Bharat Kumar Mehta and Sayali Tapas

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants…

Abstract

Learning outcomes

The case primarily focused on a real-life problem and shows that existing operations management tools can be used to solve a complex problem. Through this case, the participants will learn the application of the factor loading method and aggregate planning.

Case overview/synopsis

This case revolves around the Modi Agro Pvt. Ltd, a mango procurement and distribution business established in 1994 by Mr Dhanush Modi in Mumbai, India. Mr Mahendra Modi, son of the company owner, observed that the different seasons of cultivation and varied customer demands lead to changing workforce requirements during the procurement process. In addition, the production quality, variety, available resources, procurement location and cost play a significant role in establishing a long-term relationship with the customers. This case highlights the problem faced by Mahendra in determining an appropriate location among all available options for mango procurement and the optimal workforce for each month to meet the varying customers’ demands.

Complexity academic level

The case can be used as teaching material for participants of the course Service Operations Management, Operations Management, Decision Analysis and Quantitative Techniques

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Case study
Publication date: 15 December 2022

Hetal Jhaveri and Ashutosh Dash

Identify and explain the factors that contribute to the success of a restaurant business. Analyse different sources of entrepreneurial finance. Identify and explain local…

Abstract

Learning outcomes

Identify and explain the factors that contribute to the success of a restaurant business.

Analyse different sources of entrepreneurial finance.

Identify and explain local entrepreneur’s expectations from a funding agency.

Evaluate investment decision-making criteria for entrepreneurial funding agencies.

Case overview/synopsis

Kartikey Rajput, the promoter of a food park Urban Chowk, was waiting for the Covid regulations in the country to be relaxed. The entrepreneur in him found a business opportunity to provide hygienic food with a beautiful ambience and floated a food park (Urban Chowk) with the support of his wife Nikita Agrawal in 2017 and the second edition amidst Covid in 2020. The business model was well-appreciated by food vendors as well as customers. Rajput could see future growth potential in urban India. But his aggressive business plan to open five food parks in different cities in the next three years was disrupted due to the Covid pandemic. The expansion required huge investments, and post-pandemic challenges were plenty. The decision to go beyond Ahmedabad required the selection of cities besides the major challenge of the financing choice. The new cities might have huge footfall potential but finding the right location at the right price was a different challenge. Rajput was also concerned with the sources of getting the required finances. The entrepreneur was contemplating and evaluating the alternative sources of finance available to a start-up.

Complexity academic level

This case is appropriate for a graduate and post-graduate level programme in the courses like entrepreneurial finance, entrepreneurship and strategy. This case can also be used in an executive programme on management and Management Development Programmes (MDPs) on entrepreneurship or entrepreneurial finance.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 1: Accounting and Finance.

Case study
Publication date: 12 December 2022

Archit Vinod Tapar, Deepika Jain and Archana Patro

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with…

Abstract

Learning outcomes

The learning outcomes are as follows: to decipher the role of technology in the supply chain management (SCM); to understand the importance of supply chain integration with various stakeholders in the supply chain in increasing efficiency and effectiveness; and to comprehend the challenges in the implementation of technology in SCM.

Case overview/synopsis

This case study presents Haryana’s challenges in implementing the digitization of the supply of food grains to the public. Mr Srinivas, a consultant to the Department of Food and Public Distribution, is required to suggest the future roadmap while accounting for the challenges faced in the digitization of the distribution of grains to the public in the state of Haryana. The students are expected to use the information given in the case and exhibits to discuss and critically think about the various stakeholders involved when change initiatives are implemented on an organizational level and recommend solutions based on the voices of various internal stakeholders.

Complexity academic level

Postgraduate/Masters in Business Administration/Masters in Management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 8 December 2022

Mayank Joshipura and Vasant Sivaraman

The learning outcomes of this study are as follows:1. Learn to analyze a hostile takeover bid from the perspectives of the acquirer, target firm’s management and a large…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:1. Learn to analyze a hostile takeover bid from the perspectives of the acquirer, target firm’s management and a large institutional investor in the target firm.2. Review the structuring, financing, valuation, mode of consideration, legal and regulatory aspects of a hostile takeover.3. Understand the role of the target firm’s board in a hostile takeover transaction.4. Address “to sell or not to sell” dilemma of a large institutional investor in the target firm in the event of a tender offer given financial and non-financial considerations.

Case overview/synopsis

On June 14, 2019, Pulak Prasad, Founder and Chief Executive Officer (CEO) at Nalanda Capital, in consultation with other managing partners at Nalanda Capital, had to decide whether to tender a 10.6% equity holding in Mindtree Ltd. in an unsolicited open offer made by Larsen and Toubro (L&T) Ltd. Until then, Nalanda Capital, led by Prasad, had aligned with the Mindtree founders and had led a campaign to thwart L&T’s bid to acquire Mindtree; L&T’s offer to acquire 31% of Mindtree shares was because of open on June 17, 2019 and it is time for Prasad and the management team to take a reasoned call – whether to stay in Mindtree or to exit? Associated aspects included – What could be the consequences of not selling the stake? What could be L&T’s game plan? Could Mindtree continue to create wealth for its shareholders under L&T?

Complexity academic level

This case is appropriate for Mergers & Acquisitions and Strategic Financial Management courses in modules focused on structuring, financing and takeover defence techniques in a hostile takeover transaction. The case is appropriate for graduate MBA and EMBA programmes.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 24 November 2022

Swapnil Garg

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish…

Abstract

Learning outcomes

The learning outcomes of this study are as follows: ■ understand organizational turnaround and its sustainability;■ applying the understanding of turnarounds to distinguish between operational and strategic levers of a turnaround strategy; ■ analyze and evaluate past and present turnarounds from a sustainability perspective; and ■ formulate managerial actions to make turnaround sustainable.

Case overview/synopsis

Braithwaite Company Ltd. (Braithwaite) was a specialized engineering firm headquartered in Kolkatta, India. It primarily undertook structural steel fabrication to make railway wagons and bridge structures. It was incorporated as a private enterprise almost a century back. However, since its nationalization five decades ago, it has been operating as a public sector undertaking (PSU) under the aegis of Indian Railways, a department of the Government of India. The case documents the past three decades of the firm’s journey, during which it experienced three episodic turnarounds. Details of the first two turnarounds are presented as the background, in light of which sustainability of the third turnaround is to be examined. The case explores the sustainability of organizational turnarounds from the perspective of the current Chairman and Managing Director (CMD), the case protagonist. Braithwaite underwent financial and operational distress in 1992, 2005 and 2015 and negotiated them under different leaders. These leaders from diverse backgrounds used distinct tactics and strategies to bring about organizational turnarounds. The case provides data and information to assess the sustainability of the third turnaround. Hence, it allows a class to explore the paradoxical observation that while “turnaround” inherently implies sustenance of good performance over time, turnaround sustainability is not spontaneous in the real world. The case deals with the performance issues of PSUs, which make significant contributions to the national economy in the case of emerging economies (for example, 5%–8% of the Indian National gross domestic product is contributed by PSUs; https://swarajyamag.com/ideas/psus-are-crucial-for-indias-growth-but-only-if-they-play-a-strategic-role). Under government ownership and management, the poor performance of PSUs is often attributed to bad decision-making by its top management. In contrast, Braithwaite’s top management’s sound contextual decision-making resulted in a jump in its performance during each turnaround phase, but unsound fundamentals resulted in the unsustainability of the turnarounds. Hence, the case enables an exploration of the unique challenges faced by PSU that emanate from legacy roles, monopolistic markets and dual purpose – the concurrent pursuit of profits and social welfare. Consequently, the case allows an examination of the reasons for the distress of PSUs and the viability of turnaround strategies in the context of the broader Business–Government–Society landscape in emerging economies.

Complexity academic level

The case is written for use in the MBA elective course covering “Strategic Revival and Turnaround Strategies.” It can be used at the beginning of the course to identify reasons for organizational failure/distress or in the later part of the course to discuss the implementation of operational and strategic turnaround strategies.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 15 November 2022

Desi Adhariani and Miranti Kartika Dewi

This case aims to help students achieve the following learning objectives: ■ to apply the Emergence of Social Enterprise in Europe (Emergence des Enterprises Sociales en Europe …

Abstract

Learning outcomes

This case aims to help students achieve the following learning objectives: ■ to apply the Emergence of Social Enterprise in Europe (Emergence des Enterprises Sociales en Europe – EMES) Network definitional framework to the case, and in doing so, have a useful framework to define social enterprises in emerging markets; ■ to identify the factors that can play important role in making strategic decisions in social enterprises; ■ to evaluate the sustainability of a social enterprise; and ■ to address the unique funding and financial challenges faced by social enterprises.

Case overview/synopsis

This case study discusses the dilemmas related to business expansion faced by Waste4Change (W4C), a waste management organization based in Bekasi, Jakarta, Indonesia. W4C was founded in 2014 by a group of young men who shared the idealism of changing the world by doing the right things. This principally involved protecting the environment and educating communities while maintaining economic profitability. However, idealism can sometimes create dilemmas within decision-making as an organization attempts to prevent market logic from dictating its direction. This case examines two different types of decision: the problem of securing a waste management contract when a permit had not been granted by the local government; and the problem of selecting the appropriate funding sources to enable the organization to grow. The first decision occurred in the context of a dilemma in 2017 when W4C expanded their waste management services to several regions in Indonesia but without having succeeded in securing a permit from the local government to provide such services. Attempts to provide such services without a formal legal permit would have been considered a violation of the law, even though the clients needed them (be it residents or companies) and the nature of the service in question had a positive connotation (i.e. maintaining the cleanliness of the city through waste management).The second decision concerned W4C’s plan to go public around 10 years from now. The CEO, Mohamad Bijaksana Junerosano, also known as Sano, has been considering this option since 2020 in a bid to grow the social enterprise. W4C differed from other startups; however, in the sense that while many startups will approach a plan to go public as an exit strategy, Sano wanted to preserve the idealism that had been a cornerstone of the enterprise since its inception. In other words, for W4C, going public was not just a means to an end.

Complexity academic level

Undergraduate as well as graduate courses that focus on sustainability, accounting, financing and strategy.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 15 November 2022

Anupam Saxena, Shalini Nath Tripathi and Swadesh Kumar Singh

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an…

Abstract

Learning outcomes

After working through the case and assignment questions, students will be able to understand the following aspects:▪ how good strategic planning can convert a crisis into an opportunity;▪ importance of service excellence and customer satisfaction through customer delight and customer feedback; and▪ utilisation of resources and excellent time management strategies.

Case overview/synopsis

This case discusses how vital teamwork and motivated leadership can convert a crisis such as Covid-19 into an opportunity. This case study talks about Uttar Pradesh Metro Rail Corporation (UPMRC), a metro rail corporation working to develop metro trains in the Indian state of Uttar Pradesh. The case discusses how challenging it was for the metro rail corporation to transform its processes in a short period and deal with the crisis on major fronts such as facilities maintenance, human resource management, ensuring safety and security of its staff and riders, motivation of staff, service quality and maintaining all operational aspects. The case discusses how UPMRC is a leader on all fronts and has excelled in its operational work. It talks about what challenges the lockdown and unlocking phase posed in front of the leadership and how teamwork, dedication to exemplary service quality and customer satisfaction gave the team the strength to make changes that improved their processes and helped them overcome the crisis.The case starts with a discussion of metro rail inception and incorporation of UPMRC and then how this newly formed metro has to face the challenges of pre-lockdown period where the team worked very hard for sanitisation and safety. The lockdown created a completely different set of challenges related to the facilities and the entire metro train systems, which was a difficult situation to deal because of restrictions and other challenges. However, the team dealt with situations with strength and strategic planning, leading to better managed processes and staff. The unlocking phase also gave many challenges that the team handled with a lot of care and efficiency.

Complexity academic level

This case is suitable for post-graduate-level courses on services marketing, service operations management, general management, crisis management and strategic management. Participants can use the case to develop an understanding of strategic planning and management.This case can also be used in the executive education program for managers to encourage them to think through challenges faced by metro rail corporations.

Supplementary materials

Teaching notes are available for educators only.

Subject Code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

51 – 60 of 600