Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 5 of 5
Applied filters:
Built Environment
Environmental Management
Operations and Logistics
Public Sector Management
Date Range: Last 3 months
Clear all
Case study
Publication date: 26 November 2024

Stephen T. Homer

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case…

Abstract

Learning outcomes

The learning outcomes are as follows: to analyse the issue(s) presented within specific case study context (C4); to formulate solutions to identified issue(s) within specific case study context (C5); and to synthesise a group plan to solve issue(s) within specific case study context (A4).

Case overview/synopsis

In 2017, China proclaimed that it would no longer accept plastic waste for recycling, this was in-line with China’s Operation “National Sword” to review the quality of these plastic imports to ensure their recyclability. This sent shock waves through a now globalised recycling network, with China previously having imported 95% of the EUs and 70% of US plastics that had been collected for recycling. This plastic backlog was then diverted to South-East Asian nations, particularly Malaysia, which this case focuses the discussion upon. While the potential for significant economic benefits drew the attention of illegitimate and unscrupulous businessmen alike, the environmental degradation from the often, low technological recycling processes and even burning of low-grade plastics brought profound negative impacts. This case focuses upon, then Minister, Yeo Bee Yin who led the Ministry of Energy, Science, Technology, Environment and Climate Change, in which she took an active and aggressive stance in attempt to stop Malaysia becoming the dumping ground for the global plastic crisis.

Complexity academic level

This case is appropriate for final year undergraduate and any postgraduate degrees in Business.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 4: Environmental Management.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 November 2024

Pratik Rajendra Satpute, Gautam Surendra Bapat and Shefali Joshi

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the…

Abstract

Learning outcomes

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the various operational procedures used to enhance a smooth group check-in in hotels; use the steps defined in group check-in procedure to improve service efficiency in hotel operations; and examine and evaluate the optimal solution for a smooth group check-in for hotels.

Case overview/synopsis

“The Big Fat Indian Wedding” delves into the challenges faced by Hotel Plaza Blu, a business hotel in Pune, Maharashtra, in 2023. A big wedding group was arriving at the hotel, which comprised almost 350 adults and 120 children. Mr Parag Patil, the front office manager, had done all the preparations for group arrival but just one hour before the arrival Mr Suresh Menon, the group coordinator, came and informed that 150 additional guests would be arriving, as the other hotel, where arrangements for these guests were made, had a major electricity generator breakdown and the hotel was in complete blackout. Patil had the challenge of formulating an action plan to achieve a smooth group check-in with the last-minute changes.

Complexity academic level

Executive development programmes and graduate-level courses in non-profit hospitality and tourism management might benefit from this case study. The operational management courses in the BBA, UG management programmes might all benefit from using this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 October 2024

Niaz Ahmed Bhutto, Abdul Rehman Shaikh and Sanober Shaikh

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the…

Abstract

Learning outcomes

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the procurement of services; evaluate the potential risks and challenges associated with relying on a single vendor for critical services; apply the four-stage model of crisis management to the breach of contract by Fresh Bites Catering; examine how adopting sustainable procurement practices, such as diversifying suppliers and establishing contingency plans, can mitigate these risks and ensure business continuity; and analyze the dynamics, roles and potential conflicts between the principal (Multan University) and agent (Fresh Bites Catering) using the principal–agent theory (PAT).

Case overview/synopsis

This case study explores the challenges and implications of sustainable procurement within the context of Multan University’s cafeteria services. It delves into the sudden contract breach by Fresh Bites Catering, a long-time partner responsible for providing central cafeteria services, and examines the resulting operational crisis faced by the university. This case study highlights key procurement processes, including vendor selection, contract management and adherence to sustainability principles, as well as the risks associated with single-vendor dependency. By applying frameworks such as the PAT, the four-stage model of crisis management and sustainable procurement practices, this case study encourages students to critically assess the failures in contract enforcement, risk mitigation and service continuity. Additionally, it stimulates discussion on the benefits of robust risk management strategies, multi-vendor approaches and clear contract terms to prevent future disruptions in essential services. This case study serves as a valuable tool for understanding how procurement strategies influence organizational performance and long-term sustainability in higher education institutions.

Complexity academic level

This is a decision-making case and can be taught in Master of Business Administration courses in purchase and supply management and operations management. This case study is mainly written to make students understand and analyze the potential risks of a single vendor, the benefits of diversifying suppliers and sustainable procurement.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 6 September 2024

Rajkumari Mittal, Parul Sinha and Bikramjit Rishi

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions…

Abstract

Learning outcomes

This case study will help business management students learn the dynamics of distribution management in the rural context. After working through the case and assignment questions, the students will be able to:▪ Understand the transformation of rural retail from traditional models to organized modern retail;▪ Understand the opportunities and challenges of rural markets with specific reference to automobile products;▪ Identify and evaluate the various distribution channels available for rural markets; and▪ Devise a suitable rural-centric distribution model for automobile products following an appropriate logistics system.

Case overview/synopsis

Manan Motors, a dealership of Honda Motorcycle & Scooter India (HMSI) Private Limited in Hathras City of Uttar Pradesh province in India, has been operating successfully for the past two decades. Mr Manoj Bansal, the director at Manan Motors, was primarily targeting the urban markets with 60% dependency on the scooter portfolio of HMSI. But multiple pressures like stringent vehicle emission norms, price rise of two-wheelers and the impact of the pandemic took a toll upon the urban business of Honda Motorcycle and Scooter India Limited and subsequently upon Manan Motors. The sales for HMSI dipped from 15,121 million units in 2020–2021 to 13,466 million units in 2021–2022. Consequently, Bansal decided to alter the business strategy of Manan Motors and shift its focus from the urban to the rural territory of Hathras, where it could foresee demand for entry-level two-wheelers (engine capacity between 75 and 110 cc). Rural markets were developing, so Bansal realized that supplying a low-cost, low-end model to the rural Indian market was an opportunity for his dealership. Bansal’s decision to focus on the rural vertical of its two-wheeler business stirred several questions that floated in his mind. Should they manage distribution on their own, or through some channel members, or should they follow a rural-specific modern retail model?

Complexity academic level

The case study is designed for use by a postgraduate or executive-level audience for subjects such as sales and distribution management, distribution management and rural marketing. Students will understand the concept of distribution management and associated keywords specific to rural markets. The case study provides an opportunity to discuss and decide how a company can penetrate the rural market and also discusses the opportunities and challenges of rural distribution.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 5 of 5