Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Catherine Vanaise and Gwyneth Edwards
The data set used to write this case was collected from 83 public sources, including company communications, company journals and reports and the company website, along with…
Abstract
Research methodology
The data set used to write this case was collected from 83 public sources, including company communications, company journals and reports and the company website, along with newspaper articles, industry reports, scientific articles and case studies. The data set was used to analyse both the industry and firm in which Arup operated to draw conclusions about the firm’s strategy and competitive advantage, specifically, as it relates to trust and knowledge management.
Case overview/synopsis
Alan Belfield, an employee of Arup Group Limited for 29 years, and the company’s chairman since 2019, had witnessed significant growth since he first joined the firm. Operating globally, Arup had a proud past; since 1946, the company had served 6,931 clients across 143 countries, leading to its important contribution to many world-renowned landmarks within the built environment. From 2018 to 2020, revenue at the global multiservice engineering company had grown almost £250m [1] to £1.809bn.
Over the past few years and as 2021 came to an end, the global engineering services industry had experienced a flood of mergers and acquisitions, as the industry grew towards maturity and clients looked for full-service solutions. Arup’s strategy had proven successful in the past, evidenced by its capacity to grow revenues and partake in the design of well-known structures and buildings. However, with the trend towards consolidation, as Arup headed into 2022, how could the firm retain its position as one of the global leaders in the industry over time?
Complexity academic level
The case can be used in business courses on global strategic management at the bachelor and master levels, as it applies key strategic management concepts within a global context. The case focuses primarily on the transnational corporation (Bartlett and Ghoshal, 2002) and how it creates value through strategy and structure. Instructors who wish to integrate the human resource management aspect into the course are provided with optional material, including an additional reading, along with an assignment question and associated analysis and teaching guidance.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
Jamie O’Brien, John-Gabriel Licht and Joy M. Pahl
Public data such as news reports, interviews and memos were used to craft the case. In addition, the technical reports released by the National Transportation Safety Board (NTSB)…
Abstract
Research methodology
Public data such as news reports, interviews and memos were used to craft the case. In addition, the technical reports released by the National Transportation Safety Board (NTSB), along with secondary data in the form of expert accounts and congressional hearings were used to round out the synopsis of the case study.
Case overview/synopsis
This case explores the Boeing–McDonnell Douglas merger and its impact on Boeing’s corporate culture, ethics and strategic decision-making. After the merger, Boeing shifted from a culture focused on engineering excellence to one emphasizing cost-cutting and shareholder value. This cultural shift contributed to the development failures and ethical lapses that resulted in the 737 MAX crisis, which involved two fatal crashes. The case is designed for courses in Strategic Management or Organizational Behavior.
Complexity academic level
Strategic Management or Organizational Behavior
Details
Keywords
This case was developed from published sources. Three types of data were used to develop this case. The accounting data were compiled by the case researcher from bank financial…
Abstract
Research methodology
This case was developed from published sources. Three types of data were used to develop this case. The accounting data were compiled by the case researcher from bank financial statements such as Form 10-K, Form 8-K and quarterly Financial Highlights issued by the bank. Market data were compiled from data providers such as FactSet, Yahoo! Finance, Pitchbook and the Federal Reserve System. Reports on market developments were gathered from major news outlets such as CNBC, The Wall Street Journal, Fortune and S&P Global.
Case overview/synopsis
Interest rate risk played a big role in the banking crisis of 2023. For Silicon Valley Bank (SVB), which specialized in providing banking services to venture-backed startups in the technology and life sciences sectors, its exposure to interest rate risk and the lack of hedging against interest rate risk had played a crucial role both directly and indirectly in the bank’s failure. This case study discussed the various channels that interest rate risk played in SVB’s failure as well as other risk factors that include an unusually high percentage of uninsured deposits and a high securities-to-asset ratio compared to its industry peers.
In the low interest rate years of 2020 and 2021, startups were able to fundraise a record amount of funding from venture capital (VC) investors. As many startups deposited their funds at SVB, they became an important and concentrated depositor base for the bank and held large deposit accounts that easily exceeded the $250,000 limit insurable by the Federal Deposit Insurance Corporation. SVB benefited from the large deposit inflows in 2020 and 2021. The bank used some of the deposits to fund its loan portfolio, but most of the deposits were used to purchase debt securities such as US Treasuries and agency-used mortgage-backed securities. In fact, SVB’s investments in securities as a percentage of total assets were more than double its peers in the large banking organization (LBO) group, while the amount of loans funded as a percentage of total assets was almost half of its LBO peers.
As interest rates increased rapidly throughout 2022, bond prices fell. SVB experienced unrealized losses of $15.2bn in its held-to-maturity securities portfolio, which was almost equivalent to its equity of $16bn at the time. However, SVB implemented little or no hedging against the risk of rising interest rates. At the same time, fundraising activities slowed in the VC sector amid high interest rates and, thus, SVB’s startups clients had to draw on past deposits to continue to fund their operations. This resulted in SVB experiencing significant deposit outflows throughout 2022.
On March 8, 2023, SVB announced that it had sold all $21bn of its available-for-sale securities portfolio and suffered an $1.8bn in realized losses, which was greater than its entire last year’s net income. Markets jittered following the news. Over the next two days, depositors rushed to withdraw $142bn of deposits that represented 82% of its last year’s total deposits. Unable to withstand the crippling weight of deposit withdrawal, on March 10 the parent company of SVB filed for bankruptcy.
Complexity and academic level
Given the multiplexity of the banking crisis of 2023, this case study specifically discussed the collapse of SVB, which was the second largest bank failure at the time of its collapse. This case would be valuable for finance and economics students to learn how various risk factors interact that precipitated SVB’s failure. While there were many risk factors at play, this case study homes in on how SVB’s exposure to interest rate risk and the lack of hedging contributed to its downfall. For purpose of pedagogy, this case also explains how a bank could use on-balance-sheet as well as off-balance-sheet methods to hedge interest rate risk. This case is appropriate for courses in Risk Management, Derivatives as well as Financial Markets and Institutions with a focus on interest rate risk and its corresponding hedging methods. A course in Money and Banking may also find this case relevant. Before starting, it is assumed that students have already taken foundational finance and macroeconomics courses, have a basic understanding of financial statement analysis and its interpretations, derivative instruments such as futures and swaps, as well as have prior experience with basic duration calculations.
Details
Keywords
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business