Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 3 of 3
Applied filters:
Accounting and Finance
Built Environment
Environmental Management
Date Range: Last 3 months
Clear all
Case study
Publication date: 21 November 2024

Desi Adhariani

The learning outcomes are as follows: to evaluate the suitability of Surplus business model from accounting, finance, strategy and cultural perspectives; to identify the factors…

Abstract

Learning outcomes

The learning outcomes are as follows: to evaluate the suitability of Surplus business model from accounting, finance, strategy and cultural perspectives; to identify the factors that contribute to the reluctance of business partners to join Surplus ecosystem and to suggest solutions; to identify the factors that contribute to the reluctance of consumers to join Surplus ecosystem and to suggest solutions; and to address unique funding and financial challenges faced by Surplus.

Case overview/synopsis

This case study discussed the challenges faced by Surplus Indonesia, a company founded upon the belief that a harmonious balance can be achieved between profitability and environmental stewardship. Stemming from the founder’s encounter with leftover food going to waste after buffets, Surplus embarked on a pioneering initiative using an application technology to address food wastage at the consumer level. Collaborating with various stakeholders such as retail outlets, restaurants, bakeries, cafes and hotels, the goal was to combat food waste while supporting Sustainable Development Goals 2, 12 and 13: Zero Hunger, Responsible Consumption & Production and Climate Action, respectively. Each meal saved through the Surplus app not only translated to reduced expenses for businesses but also contributed to reducing greenhouse gas emissions from landfills. Surplus’ overarching mission was to cut food waste and loss in Indonesia by half by 2030, fostering an environment where food waste is virtually nonexistent in the nation.

Complexity academic level

Undergraduate as well as graduate courses that focus on sustainability, accounting, financing and strategy

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 23 September 2024

Siraj A. Bhayo, Nimra Gul Pathan, Ghulam Abbas, Narandar Kumar and Nazeer Ahmed

After completion of the case study, the students will be able to define and compute equivalent units of production, apply management accounting procedures for manufacturing…

Abstract

Learning outcomes

After completion of the case study, the students will be able to define and compute equivalent units of production, apply management accounting procedures for manufacturing businesses (Furqani Sugar Mills), calculate product cost and track product cost flows and prepare process cost summary using the weighted average method. By studying this case, learners will gain insights into the challenges and financial complexities faced by a sugar mill and how strategic decisions and economic analysis can impact the sustainability and profitability of such businesses.

Case overview/synopsis

This case study explained the problem Mr Zoraiz, chief financial officer (CFO) of Furqani Sugar Mill, was facing. The problems started in the month of November 2020. Mill’s owner Mr Jabbar asked him for suggestions that employees should not be laid off. So he was analysing and estimating the cost of production when increasing production. He was focusing on cost reduction in process or increasing production, and utilization of resources efficiently and effectively. This case study focused on the market segment of the sugar industry for process costing. Furqani Sugar Mill, founded in 1992 in Pakistan (Company Document), had a noble mission to improve the lives of local peasants by producing sugar and molasses. Pakistan heavily relied on agribusiness, particularly sugar production, which contributed significantly to manufacturing. However, Furqani Sugar Mill faced a dire situation despite its vital role. During the sugarcane season, it struggled due to a shortage of raw materials, primarily sugarcane. Zoraiz, the CFO, grappled with running the mill below total capacity in recent years due to two significant issues: government-fixed sugar prices and limited sugarcane supply from local farmers. The high cost of sugarcane hindered Zoraiz’s desire to operate at total capacity. Zoraiz, Furqani’s CFO, must decide what he can do so that the mill can operate at its total capacity. The future of Furqani Sugar Mill hung in the balance as Zoraiz navigated complex financial decisions while striving to uphold the mill’s legacy and commitment to the local community.

Complexity academic level

This case study is suitable for teaching in several modules, notably managerial accounting and control systems, management accounting decision-making and cost and management accounting. Specifically, it covers performance management and process costing in management accounts. It is appropriate for teaching at the undergraduate and postgraduate levels.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and finance.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 3 of 3