Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 4 of 4
Applied filters:
Built Environment
Operations and Logistics
Public Sector Management
Tourism and Hospitality
Other/ no country
Clear all
Case study
Publication date: 24 November 2023

Eduardo Russo and Ariane Roder Figueira

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of…

Abstract

Learning outcomes

Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of the main biases that affect making decisions in environments of high uncertainty; and build and apply judgment models to support decision-making processes.

Case overview/synopsis

Motivated by recent international events responsible for causing supply shock and great volatility in the price of imported fertilizers, Brazil, which in 2022 was responsible for producing only 15% of all the fertilizer consumed by its agribusiness, ran against time by launching a new national fertilizer plan (PNF). The plan proposed to boost Brazil’s national fertilizer industry to fulfil a long-term vision of reducing the country’s external dependence by 2050. While awaiting the first results of the PNF, this case study casts the student participants in the role of Breno Castelães, chief advisor of the special secretariat for strategic affairs of the presidency of the republic, whose role is to recommend the country’s position in the face of external pressures to adopt international embargoes of Russian fertilizers because of its war with Ukraine.

Complexity academic level

This case study is suitable for undergraduate and graduate students of business administration and public management courses who want to deal with topics such as public policy, judgment and decision-making.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 10: Public sector management.

Details

Emerald Emerging Markets Case Studies, vol. 13 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 22 August 2023

Ranit Sinha, Sidhartha S. Padhi and Amol S. Dhaigude

The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change…

Abstract

Learning outcomes

The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change management and cost-benefit analysis concepts. The study aims to encourage them to use the data given in the case and exhibits to compare and contrast physical and digital supply chains (SC); design the digitized version of the traditional SC; examine the nitty-gritty of technology adoption in the SC context; develop the change management plans for the successful adoption and implementation of SC digitization; design the risk register and Explore the business process management; and conduct the return on investment analysis.

Case overview/synopsis

Amber Yen, Chief Operating Officer Apparel Sourcing at Ransys Partners Ltd (RSL), was presented with the task of reducing physical sample production cost and time without impeding order pipeline. RSL was experiencing significant capacity constrain during the COVID-19 crisis, failing to deliver physical samples to international brands. To win large export orders, RSL had to adopt a new innovative way to reduce the sample approval process while meeting customer requirements. Ms Yen wanted to convert the entire sample approval process into a digital mode. She was facing multiple challenges related to the design, implementation and adoption of the digital sample approval process to coordinate the entire SC. She had limited time and was grappling with other impending constraints such as increasing cost, intense competition, demanding customers, shortage of labor due to COVID-19, reducing the bottom line. It was her time to test the idiom “necessity is the mother of innovation”.

Complexity academic level

The target audience for this case is management or business school students. This case can be used to teach digitization of SC, operations management, organization behavior, digitization of enterprises, IT for business, new service development, supplier management technology adoption, and change management in management or business schools.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 20 January 2017

Sarang Deo, Avidan Ben Har, Bill Shields and Mihir Naware

Roger Osayende, a former management consultant, must advise the Ministry of Health of Ektu, a fictional country in Central Africa, on how to implement a new point-of-care…

Abstract

Roger Osayende, a former management consultant, must advise the Ministry of Health of Ektu, a fictional country in Central Africa, on how to implement a new point-of-care diagnostic test for infants with HIV. In Ektu, mothers often transmitted HIV infection to infants during pregnancy, delivery, or breastfeeding due to inadequate resources to invest in prevention efforts. The existing procedure to diagnose infants with HIV required collecting dried blood samples at more than two hundred healthcare facilities around the country and transporting them to a central laboratory in the capital for testing. This process was characterized by significant delays due to long transportation times, batching of samples in transportation and processing in the lab, and concomitant congestion in the lab. This delay resulted in loss to follow-up, that is, lost patients due to mothers not collecting their infants' results. A new point-of-care device was about to be introduced, which would obviate the need for this centralized processing and the resulting diagnostic delay. The key decision under consideration is where to place the devices to maximize their effectiveness.

Understand the importance of making public health decisions based on a data-driven, logical framework   Uncover the link between operational performance of the healthcare system and health outcomes at the population level   Appreciate the relevance of operational decisions in enhancing or diminishing the effectiveness of a medical technology   Use process analysis concepts to characterize various components of delays

1 – 4 of 4