Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Jeynakshi Ladsawut and Tasneem Mustun
Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption…
Abstract
Learning outcomes
Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption of new media such as social media transforms the elements of the marketing mix and evaluate the marketing mix strategies and their influence on future buying behaviours.
Case overview/synopsis
Founded in 2012, “Gecko Kids” is a designer clothing brand based in Mauritius, renowned for its vibrant and playful designs catering to children's fashion and lifestyle. Inspired by the lively spirit of Mauritius, Gecko Kids offers a diverse range of clothing and accessories designed to ignite children's imaginations and celebrate their sense of adventure. In addition to its captivating designs, Gecko Kids, under the leadership of its lead designer, Varnee Moodely, is committed to sustainability, using organic and ethically sourced materials wherever possible. Through responsible manufacturing processes and partnerships with local artisans, the brand strives to minimise its environmental footprint while supporting the communities that inspire its creations. After 32 years in operation, the brand finds itself struggling with challenges stemming from its current marketing mix strategy. This case study delves into the brand’s struggles across the 4Ps – product, price, place and promotion – and explores potential solutions, especially in the 21st century where most companies are adopting digital marketing strategies. Can the company rectify the repercussions of an inadequate marketing plan to sustain the Gecko Kids brand as a thriving local Mauritian entity?
Complexity academic level
This case study is suitable for undergraduate-level programmes in marketing.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 8: Marketing.
Details
Keywords
Eduardo Russo and Ariane Roder Figueira
Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of…
Abstract
Learning outcomes
Upon completion of this case study, students are expected to be able to reflect on strategic industry sectors and the formulation of long-view public policies; understand some of the main biases that affect making decisions in environments of high uncertainty; and build and apply judgment models to support decision-making processes.
Case overview/synopsis
Motivated by recent international events responsible for causing supply shock and great volatility in the price of imported fertilizers, Brazil, which in 2022 was responsible for producing only 15% of all the fertilizer consumed by its agribusiness, ran against time by launching a new national fertilizer plan (PNF). The plan proposed to boost Brazil’s national fertilizer industry to fulfil a long-term vision of reducing the country’s external dependence by 2050. While awaiting the first results of the PNF, this case study casts the student participants in the role of Breno Castelães, chief advisor of the special secretariat for strategic affairs of the presidency of the republic, whose role is to recommend the country’s position in the face of external pressures to adopt international embargoes of Russian fertilizers because of its war with Ukraine.
Complexity academic level
This case study is suitable for undergraduate and graduate students of business administration and public management courses who want to deal with topics such as public policy, judgment and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 10: Public sector management.
Details
Keywords
Ranit Sinha, Sidhartha S. Padhi and Amol S. Dhaigude
The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change…
Abstract
Learning outcomes
The case depicts an opportunity for undergraduate and postgraduate students to be exposed to the basic digitization of supply chain management, technology adoption, change management and cost-benefit analysis concepts. The study aims to encourage them to use the data given in the case and exhibits to compare and contrast physical and digital supply chains (SC); design the digitized version of the traditional SC; examine the nitty-gritty of technology adoption in the SC context; develop the change management plans for the successful adoption and implementation of SC digitization; design the risk register and Explore the business process management; and conduct the return on investment analysis.
Case overview/synopsis
Amber Yen, Chief Operating Officer Apparel Sourcing at Ransys Partners Ltd (RSL), was presented with the task of reducing physical sample production cost and time without impeding order pipeline. RSL was experiencing significant capacity constrain during the COVID-19 crisis, failing to deliver physical samples to international brands. To win large export orders, RSL had to adopt a new innovative way to reduce the sample approval process while meeting customer requirements. Ms Yen wanted to convert the entire sample approval process into a digital mode. She was facing multiple challenges related to the design, implementation and adoption of the digital sample approval process to coordinate the entire SC. She had limited time and was grappling with other impending constraints such as increasing cost, intense competition, demanding customers, shortage of labor due to COVID-19, reducing the bottom line. It was her time to test the idiom “necessity is the mother of innovation”.
Complexity academic level
The target audience for this case is management or business school students. This case can be used to teach digitization of SC, operations management, organization behavior, digitization of enterprises, IT for business, new service development, supplier management technology adoption, and change management in management or business schools.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 9: Operations and Logistics.
Details
Keywords
Prashanth Kumar Sreram and Savitha Chilakamarri
The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…
Abstract
Learning outcomes
The learning outcomes of this study are as follows:
1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;
2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and
3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.
Case overview/synopsis
On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.
Complexity academic level
Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 2: Built environment.
Details
Keywords
Eduard Maltsev and Tetiana Kuznietsova
Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and…
Abstract
Learning outcomes
Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and the organization. Students understand the value of working with different stakeholders (partners, headquarters). Students can analyze the role of focusing on a client and apply client-centric way of thinking. Students can apply the concept of the transformational idea to create (synthesize) possible solutions for the presented dilemma.
Case overview/synopsis
This case tells the transformation story of the logistics company Ekol Ukraine, which began in 2013. This company was the most successful branch of Ekol Logistics, an international corporation operating in 13 countries. From 2013 till 2021, Ekol Ukraine experienced a crisis related to the start of a conflict between Ukraine and Russian militants. It proved its ability to cope with challenges, gained almost complete autonomy from the head office, transformed the business model and culture and achieved considerable success in building an ecosystem.
Having this stage of transformation completed by 2021, the company reached a plateau and had to decide what the following changes would be. In 2021, only 14% of Ukrainian businesses used outsourcing logistics services (like the ones Ekol Ukraine provided). The remaining 86% had in-house logistics and were not ready to change the model. So, Ekol Ukraine faced a problem: how could a logistics provider grow in a market that was not mentally ready to outsource?
Complexity academic level
MBA programs.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Yaryna Boychuk, Artem Kornetskyy, Liudmyla Kryzhanovska, Andrew Rozhdestvensky and Yaryna Stepanyuk
The learning outcomes of this paper is as follows: to structure the impact investing phenomenon and distinguish it from traditional investing or philanthropy, including the…
Abstract
Learning outcomes
The learning outcomes of this paper is as follows: to structure the impact investing phenomenon and distinguish it from traditional investing or philanthropy, including the motivation of investors in impact investing projects; to analyse stakeholders in impact investing projects according to four main categories; to structure the implementation model of the theory of change in the context of impact investing; to build managerial decisions concerning the development of impact investing projects in crisis situations.
Case overview/synopsis
The case describes the development path of the Promprylad.Renovation project from its concept to the critical moment at the end of 2018. Yuriy Fyliuk – the case protagonist, acts as the main ideologist and leader of the project, the essence of which is the establishment of an innovation centre on the area of the old Promprylad plant in Ivano-Frankivsk. Impact investing was selected as the main project development tool, as it allows for attracting investors who share the aspiration for positive change of the city and potential financial benefit. The project is implemented in several stages as follows: partner involvement (Insha Osvita, MitOst, Pact Ukraine and LvBS), vision finalisation and research (together with Stanford Research Institute, Zotov & Co, FORMA Architects, Moris Group, etc.), the launch of the pilot floor (attracting more than $683,000 from allocated grants and more than $590,000 of private investments). Open equity crowdfunding and the purchase of the entire plant, with its subsequent renovation, should be the next stage. As of 2017, agreements have been reached to pay fully for the purchase of the plant by the end of 2019. After a successful pilot and lengthy negotiations, it was agreed that $1,000,000 should be paid by the end of 2018 and $2,000,000 by the end of 2019 to complete the buyout. However, as of the end of 2018, martial law was proclaimed in Ukraine. Hence, considering the risks, a major US investor refuses to contribute. The main dilemma is either to find a suitable solution to complete the buyout of the plant or to stop the project.
Complexity academic level
This case can be used in the master’s programmes of business schools (MBA, Executive MBA, Entrepreneurship, etc.), as well as in training programmes for public and state sector managers. The case study will be particularly useful for mixed groups with representatives from different sectors of the economy. This case study might be taught in the following disciplines: social entrepreneurship, social investing, leadership and crisis management. The subject of impact investing allows recognition of the benefits of combined cross-sectoral efforts over joint projects.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 7: Management science.
Details
Keywords
Sarang Deo, Avidan Ben Har, Bill Shields and Mihir Naware
Roger Osayende, a former management consultant, must advise the Ministry of Health of Ektu, a fictional country in Central Africa, on how to implement a new point-of-care…
Abstract
Roger Osayende, a former management consultant, must advise the Ministry of Health of Ektu, a fictional country in Central Africa, on how to implement a new point-of-care diagnostic test for infants with HIV. In Ektu, mothers often transmitted HIV infection to infants during pregnancy, delivery, or breastfeeding due to inadequate resources to invest in prevention efforts. The existing procedure to diagnose infants with HIV required collecting dried blood samples at more than two hundred healthcare facilities around the country and transporting them to a central laboratory in the capital for testing. This process was characterized by significant delays due to long transportation times, batching of samples in transportation and processing in the lab, and concomitant congestion in the lab. This delay resulted in loss to follow-up, that is, lost patients due to mothers not collecting their infants' results. A new point-of-care device was about to be introduced, which would obviate the need for this centralized processing and the resulting diagnostic delay. The key decision under consideration is where to place the devices to maximize their effectiveness.
Understand the importance of making public health decisions based on a data-driven, logical framework Uncover the link between operational performance of the healthcare system and health outcomes at the population level Appreciate the relevance of operational decisions in enhancing or diminishing the effectiveness of a medical technology Use process analysis concepts to characterize various components of delays
Details
Keywords
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business