Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 2 of 2
Applied filters:
Built Environment
Marketing
Other/ no country
Clear all
Case study
Publication date: 5 August 2024

Jeynakshi Ladsawut and Tasneem Mustun

Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption…

Abstract

Learning outcomes

Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption of new media such as social media transforms the elements of the marketing mix and evaluate the marketing mix strategies and their influence on future buying behaviours.

Case overview/synopsis

Founded in 2012, “Gecko Kids” is a designer clothing brand based in Mauritius, renowned for its vibrant and playful designs catering to children's fashion and lifestyle. Inspired by the lively spirit of Mauritius, Gecko Kids offers a diverse range of clothing and accessories designed to ignite children's imaginations and celebrate their sense of adventure. In addition to its captivating designs, Gecko Kids, under the leadership of its lead designer, Varnee Moodely, is committed to sustainability, using organic and ethically sourced materials wherever possible. Through responsible manufacturing processes and partnerships with local artisans, the brand strives to minimise its environmental footprint while supporting the communities that inspire its creations. After 32 years in operation, the brand finds itself struggling with challenges stemming from its current marketing mix strategy. This case study delves into the brand’s struggles across the 4Ps – product, price, place and promotion – and explores potential solutions, especially in the 21st century where most companies are adopting digital marketing strategies. Can the company rectify the repercussions of an inadequate marketing plan to sustain the Gecko Kids brand as a thriving local Mauritian entity?

Complexity academic level

This case study is suitable for undergraduate-level programmes in marketing.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 8: Marketing.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

1 – 2 of 2