Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 5 of 5
Applied filters:
Built Environment
Environmental Management
Management Science
Other/ no country
Clear all
Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 31 October 2022

Eduard Maltsev and Tetiana Kuznietsova

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and…

Abstract

Learning outcomes

Students comprehend the importance of the transformational idea and apply it in their leadership. Students can analyze how to spread the transformational idea across the team and the organization. Students understand the value of working with different stakeholders (partners, headquarters). Students can analyze the role of focusing on a client and apply client-centric way of thinking. Students can apply the concept of the transformational idea to create (synthesize) possible solutions for the presented dilemma.

Case overview/synopsis

This case tells the transformation story of the logistics company Ekol Ukraine, which began in 2013. This company was the most successful branch of Ekol Logistics, an international corporation operating in 13 countries. From 2013 till 2021, Ekol Ukraine experienced a crisis related to the start of a conflict between Ukraine and Russian militants. It proved its ability to cope with challenges, gained almost complete autonomy from the head office, transformed the business model and culture and achieved considerable success in building an ecosystem.

Having this stage of transformation completed by 2021, the company reached a plateau and had to decide what the following changes would be. In 2021, only 14% of Ukrainian businesses used outsourcing logistics services (like the ones Ekol Ukraine provided). The remaining 86% had in-house logistics and were not ready to change the model. So, Ekol Ukraine faced a problem: how could a logistics provider grow in a market that was not mentally ready to outsource?

Complexity academic level

MBA programs.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Case study
Publication date: 16 August 2021

Yaryna Boychuk, Artem Kornetskyy, Liudmyla Kryzhanovska, Andrew Rozhdestvensky and Yaryna Stepanyuk

The learning outcomes of this paper is as follows: to structure the impact investing phenomenon and distinguish it from traditional investing or philanthropy, including the…

Abstract

Learning outcomes

The learning outcomes of this paper is as follows: to structure the impact investing phenomenon and distinguish it from traditional investing or philanthropy, including the motivation of investors in impact investing projects; to analyse stakeholders in impact investing projects according to four main categories; to structure the implementation model of the theory of change in the context of impact investing; to build managerial decisions concerning the development of impact investing projects in crisis situations.

Case overview/synopsis

The case describes the development path of the Promprylad.Renovation project from its concept to the critical moment at the end of 2018. Yuriy Fyliuk – the case protagonist, acts as the main ideologist and leader of the project, the essence of which is the establishment of an innovation centre on the area of the old Promprylad plant in Ivano-Frankivsk. Impact investing was selected as the main project development tool, as it allows for attracting investors who share the aspiration for positive change of the city and potential financial benefit. The project is implemented in several stages as follows: partner involvement (Insha Osvita, MitOst, Pact Ukraine and LvBS), vision finalisation and research (together with Stanford Research Institute, Zotov & Co, FORMA Architects, Moris Group, etc.), the launch of the pilot floor (attracting more than $683,000 from allocated grants and more than $590,000 of private investments). Open equity crowdfunding and the purchase of the entire plant, with its subsequent renovation, should be the next stage. As of 2017, agreements have been reached to pay fully for the purchase of the plant by the end of 2019. After a successful pilot and lengthy negotiations, it was agreed that $1,000,000 should be paid by the end of 2018 and $2,000,000 by the end of 2019 to complete the buyout. However, as of the end of 2018, martial law was proclaimed in Ukraine. Hence, considering the risks, a major US investor refuses to contribute. The main dilemma is either to find a suitable solution to complete the buyout of the plant or to stop the project.

Complexity academic level

This case can be used in the master’s programmes of business schools (MBA, Executive MBA, Entrepreneurship, etc.), as well as in training programmes for public and state sector managers. The case study will be particularly useful for mixed groups with representatives from different sectors of the economy. This case study might be taught in the following disciplines: social entrepreneurship, social investing, leadership and crisis management. The subject of impact investing allows recognition of the benefits of combined cross-sectoral efforts over joint projects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Case study
Publication date: 1 October 2011

Joseph Khoury and Luciano Barin-Cruz

Sustainable development (in under-developed rural communities).

Abstract

Subject area

Sustainable development (in under-developed rural communities).

Study level/applicability

Bachelor's degree.

Case overview

The case follows six young adults from Quebec, who are mandated with a three-month agro-environmental project in the fight against desertification and poverty, in Kamaka, a village in the Sahel region of Mali. The project's central element is the development of a community garden that would ensure the diversification of the community's nutritional diet, and the rehabilitation of the environment. The mandate also consists of various environmental awareness workshops pertaining to efficient energy consumption, composting, and solar food drying techniques. The project, in its fourth year of collaboration between the Quebec organization and their local Malian partner, does not seem to have been yielding the desired results. The team is faced with the challenges of understanding the opportunities and limitations of the project so that they can try to succeed where previous teams have failed; while overcoming the organizational and logistical shortfalls that they faced prior to the start of their work, as they simultaneously struggled to adapt to their totally new context.

Expected learning outcomes

How to prepare for, approach, and carry out local community development projects – environmental and/or social – in under-developed regions such as Mali. Mainly, how to create a shared vision with the concerned community; build an effective multi-stakeholder network; and ultimately co-create sustainable value (as per the proposed Senge model).

Supplementary materials

Teaching notes and short documentary online link.

Case study
Publication date: 24 November 2003

Jenny Mead, Patricia H. Werhane, R. Edward Freeman and Andrew C. Wicks

This case presents the dilemma of a multinational oil and gas company, ExxonMobil, as it factors in the ethical issues related to the environment and cultural differences in…

Abstract

This case presents the dilemma of a multinational oil and gas company, ExxonMobil, as it factors in the ethical issues related to the environment and cultural differences in deciding whether to proceed with building a pipeline in Chad and Cameroon, two of the poorest and most corrupt developing countries in West Africa. The many players in this project included the World Bank--which cofinanced the project and put restrictions into place that would hopefully prevent pipeline-related government corruption in both Chad and Cameroon--and many environmental and human rights groups that warned of potential disaster. The case also covers the environmental and social analysis of the areas that would be affected by the pipeline.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

1 – 5 of 5