Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Jeynakshi Ladsawut and Tasneem Mustun
Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption…
Abstract
Learning outcomes
Through analysis and discussion of the case study, students should be able to understand the marketing mix concept in the context of the retail industry, analyse how the adoption of new media such as social media transforms the elements of the marketing mix and evaluate the marketing mix strategies and their influence on future buying behaviours.
Case overview/synopsis
Founded in 2012, “Gecko Kids” is a designer clothing brand based in Mauritius, renowned for its vibrant and playful designs catering to children's fashion and lifestyle. Inspired by the lively spirit of Mauritius, Gecko Kids offers a diverse range of clothing and accessories designed to ignite children's imaginations and celebrate their sense of adventure. In addition to its captivating designs, Gecko Kids, under the leadership of its lead designer, Varnee Moodely, is committed to sustainability, using organic and ethically sourced materials wherever possible. Through responsible manufacturing processes and partnerships with local artisans, the brand strives to minimise its environmental footprint while supporting the communities that inspire its creations. After 32 years in operation, the brand finds itself struggling with challenges stemming from its current marketing mix strategy. This case study delves into the brand’s struggles across the 4Ps – product, price, place and promotion – and explores potential solutions, especially in the 21st century where most companies are adopting digital marketing strategies. Can the company rectify the repercussions of an inadequate marketing plan to sustain the Gecko Kids brand as a thriving local Mauritian entity?
Complexity academic level
This case study is suitable for undergraduate-level programmes in marketing.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 8: Marketing.
Details
Keywords
Prashanth Kumar Sreram and Savitha Chilakamarri
The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…
Abstract
Learning outcomes
The learning outcomes of this study are as follows:
1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;
2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and
3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.
Case overview/synopsis
On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.
Complexity academic level
Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 2: Built environment.
Details
Keywords
Joseph Khoury and Luciano Barin-Cruz
Sustainable development (in under-developed rural communities).
Abstract
Subject area
Sustainable development (in under-developed rural communities).
Study level/applicability
Bachelor's degree.
Case overview
The case follows six young adults from Quebec, who are mandated with a three-month agro-environmental project in the fight against desertification and poverty, in Kamaka, a village in the Sahel region of Mali. The project's central element is the development of a community garden that would ensure the diversification of the community's nutritional diet, and the rehabilitation of the environment. The mandate also consists of various environmental awareness workshops pertaining to efficient energy consumption, composting, and solar food drying techniques. The project, in its fourth year of collaboration between the Quebec organization and their local Malian partner, does not seem to have been yielding the desired results. The team is faced with the challenges of understanding the opportunities and limitations of the project so that they can try to succeed where previous teams have failed; while overcoming the organizational and logistical shortfalls that they faced prior to the start of their work, as they simultaneously struggled to adapt to their totally new context.
Expected learning outcomes
How to prepare for, approach, and carry out local community development projects – environmental and/or social – in under-developed regions such as Mali. Mainly, how to create a shared vision with the concerned community; build an effective multi-stakeholder network; and ultimately co-create sustainable value (as per the proposed Senge model).
Supplementary materials
Teaching notes and short documentary online link.
Details
Keywords
Jenny Mead, Patricia H. Werhane, R. Edward Freeman and Andrew C. Wicks
This case presents the dilemma of a multinational oil and gas company, ExxonMobil, as it factors in the ethical issues related to the environment and cultural differences in…
Abstract
This case presents the dilemma of a multinational oil and gas company, ExxonMobil, as it factors in the ethical issues related to the environment and cultural differences in deciding whether to proceed with building a pipeline in Chad and Cameroon, two of the poorest and most corrupt developing countries in West Africa. The many players in this project included the World Bank--which cofinanced the project and put restrictions into place that would hopefully prevent pipeline-related government corruption in both Chad and Cameroon--and many environmental and human rights groups that warned of potential disaster. The case also covers the environmental and social analysis of the areas that would be affected by the pipeline.
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business