Publication date: 1 February 2001

ZDZISŁAW HEJDUCKI and JULIUSZ MROZOWICZ

This paper presents and describes basic properties of construction work organization methods which use time couplings. In addition, fundamental methods of construction work…

117

Abstract

This paper presents and describes basic properties of construction work organization methods which use time couplings. In addition, fundamental methods of construction work organization, which enable the scheduling and synchronization of construction works and take into account several constraints encountered in practice, are also discussed.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 1 February 2004

Zdzisław Hejducki

This paper presents the algorithm of construction work graphic schedule which considers the proper sequencing problem. Describes the algorithm step by step, i.e. the construction…

955

Abstract

This paper presents the algorithm of construction work graphic schedule which considers the proper sequencing problem. Describes the algorithm step by step, i.e. the construction work organisation methods with zero couplings between realisation means, work fronts, and their combination. It also shows the calculation process of limit possible minimum by considering technical and organisation limits. In the second part of the paper, the practical example which shows the method and the optimisation algorithm for the work organisation method with zero couplings between realisation means is presented.

Details

Engineering, Construction and Architectural Management, vol. 11 no. 1
Type: Research Article
ISSN: 0969-9988