Search results
1 – 10 of 36Hasan Fevzi Cugen, Semra Arslan Selcuk and Yusuf Arayici
Building Information Modelling in building processes brings significant efficiency gains. However, its use in restoration projects is still experimental. On the other hand, more…
Abstract
Purpose
Building Information Modelling in building processes brings significant efficiency gains. However, its use in restoration projects is still experimental. On the other hand, more than traditional methods are needed for communication, collaboration, and shared understanding. Hence, the main research question is how to enhance these aspects in multinational projects with information transparency challenges and the need for shared understanding among stakeholders. This research aims to develop and propose a hybrid modelling approach that integrates traditional and BIM-based information process workflows through testing and evaluating to what extent BIM can be used in restoration projects without excessive efforts.
Design/methodology/approach
Considering this aim, the case study, the Mahmud Pasha Hammam as the heritage building, a 15th-century structure located in Serbia, was studied with the action research strategy to enable action-based learning by doing. Alongside the 2D documentation as the traditional method for the existing structure, restoration design proposals were also produced for the new additions to the heritage structure with BIM.
Findings
A new BIM use scenario was experimented with and proposed, proving BIM implementation's potential impact on heritage restoration projects. A hybrid model was developed that meets the requirements of existing regulations and specifications, where restoration proposals were visualized quickly, quantity take-off was produced, and technical drawings were generated instantly.
Originality/value
This hybrid modelling workflow integrates HBIM with traditional methods in restoration projects to improve communication, efficiency, and collaboration in a real-time professional project.
Details
Keywords
Ozan Koseoglu, Mehmet Sakin and Yusuf Arayici
The purpose of this paper is to develop a solid understanding of how integrated building information modeling (BIM) is implemented in a mega project such as the (Istanbul Grand…
Abstract
Purpose
The purpose of this paper is to develop a solid understanding of how integrated building information modeling (BIM) is implemented in a mega project such as the (Istanbul Grand Airport IGA) construction project, which is the main case study in the research methodology.
Design/methodology/approach
The paper examines and identifies the lean efficiency gains achieved in the IGA project and highlights the synergies between BIM and lean concepts based on the facts and figures from the case study analysis. In complex projects, there is a vital need for a comprehensive approach that would enable successful managing of design and construction information via accurate modeling, collaboration and integration throughout the project lifecycles covering various disciplines.
Findings
The research findings in the paper make a significant impact in understanding the strategic perception for BIM as a new way of working methodology for the construction industry in Turkey, since the IGA project has become not only a key learning hub for the Turkish construction industry, but also a global landmark for digital construction and project delivery. In addition it proves the mutual synergies between BIM and lean practices.
Originality/value
The IGA project is a mega-scale airport construction project with features beyond building industry challenges, and it should be designed and constructed with tight deadlines and budgets and be operated afterwards in an effective and efficient way. Can lean and BIM help for timely and on-budget completion of the project and could they support the management of the airport facility after handover? The paper also discusses the lean and BIM implementation in the project in relation to the BIM Level 3 requirements.
Details
Keywords
Yusuf Arayici, Onur Behzat Tokdemir and Mohamad Kassem
This research aims to identify and measure the correlations between building information modelling (BIM) and lean construction (LC) principles at the design and construction…
Abstract
Purpose
This research aims to identify and measure the correlations between building information modelling (BIM) and lean construction (LC) principles at the design and construction phases.
Design/methodology/approach
The study investigates BIM-LC principles correlations using the Istanbul Grant Airport (IGA) as a case study. The Delphi technique, performed quantitatively, contributes to the identification and quantification of a set of correlations between 11 selected BIM uses and 13 LC principles, which are supported with practical examples from the case study.
Findings
Together, the two research methods provide an evidence-based approach to understand the correlations between BIM and LC. The correlation analysis results in 46 correlations, and the correlations between the LC principles and BIM uses are intensified with the LC principles.
Practical implications
A quantitative understanding BIM use and LC principles correlations and appreciation of their specific uses can guide the practical implementation of BIM and LC, especially in large and mega projects.
Originality/value
BIM and LC practices represent approaches to improve performance in construction projects. While BIM has both information technology (IT) and process perspectives, the LC approach is mainly a process and product-oriented philosophy for project efficiency, effectiveness and the elimination of non-value-adding activities and waste. Many studies have investigated how the two approaches complement each other and concluded that their combined implementation in projects can improve efficiency and effectiveness. However, to date an analytical and granular investigation identifying and measuring correlations between BIM and LC based on empirical data is lacking. This paper fills that gap with an evidence-based analysis of the tightness of coupling and correlations between BIM uses and LC principles.
Details
Keywords
Charalambos Pitros and Yusuf Arayici
The study looks at the characteristics of upswings and downswings for UK housing cycles. Specifically, the purpose of this paper is to empirically analyse cycles in house prices…
Abstract
Purpose
The study looks at the characteristics of upswings and downswings for UK housing cycles. Specifically, the purpose of this paper is to empirically analyse cycles in house prices and housing affordability on the characteristics of persistence, magnitude and severity.
Design/methodology/approach
The paper draws upon the triangular methodology of cycles and utilises housing data from the last three decades.
Findings
From an empirical perspective, the study obtained four main results. First, the graphical trajectory of cycles in house price and housing affordability is highly synchronized. Second, upturns in both cycles tend to be longer than downturns on average. Third, the recent upturn in house prices and housing affordability is characterised by larger duration, magnitude and severity than the earlier case. Fourth, the latest downturn in both cycles is highly synchronised in terms of time occurrence, persistence, magnitude and severity; in addition, in both cases, the latest downturn is considerably smaller than the previous one. The study additionally indicates that on average the length of a complete house price and housing affordability cycle is 19 years on a peak-to-peak basis.
Research limitations/implications
This paper is essentially exploratory and raises a number of questions for further investigation. Future research should, first, arrive at a more nuanced definition of affordability and, second, examine causality. The fact that two phenomena appear to have some significant synchronicity is not an indication that they are interdependent, although logic would suggest they might be.
Originality/value
This is among the few papers that analyses cycles in UK house prices. It is the first study that draws attention to the housing affordability cycle and the first to compare cycles in house prices with cycles in housing affordability.
Details
Keywords
Charalambos Pitros and Yusuf Arayici
The purpose of this paper is to provide a decision support model for the early diagnosis of housing bubbles in the UK during the maturity process of the phenomenon.
Abstract
Purpose
The purpose of this paper is to provide a decision support model for the early diagnosis of housing bubbles in the UK during the maturity process of the phenomenon.
Design/methodology/approach
The development process of the model is divided into four stages. These stages are driven by the normal distribution theorem coupled with the case study approach. The application of normal distribution theory is allowed through the usage of several parametric tools. The case studies tested in this research include the last two UK housing bubbles, 1986 to 1989 and 2001/2002 to 2007. The central hypothesis of the model is that during housing bubbles, all speculative activities of market participants follow an approximate synchronisation, and therefore, an irrational, synchronous and periodic increase on a wide range of relevant variables must occur to anticipate the bubble component. An empirical application of the model is conducted on UK housing market data over the period of 1983-2011.
Findings
The new approach successfully identifies the well-known UK historical bubble episodes over the period of 1983-2011. The study further determines that for uncovering housing bubbles in the UK, house price changes have the same weight with the debt–burden ratio when their velocity is positive. Finally, the application of this model has led us to conclude that the model’s outputs fluctuate approximately in line with phases of the UK real estate cycle.
Originality/value
This paper proposes a new measure for studying the presence of housing bubbles. This measure is not simply an ex post detection technique but dating algorithms that use data only up to the point of analysis for an on-going bubble assessment, giving an early warning diagnostic that can assist market participants and regulators in market monitoring.
Details
Keywords
Yusuf Arayici, Ghassan Aouad and Vian Ahmed
Collaborative working using Information and Communication Technologies (ICT) systems in construction has become a reality as many activities are performed globally with actors…
Abstract
Collaborative working using Information and Communication Technologies (ICT) systems in construction has become a reality as many activities are performed globally with actors located in various geographical locations. Computer Integrated Construction (CIC) is the type of ICT system that binds a fragmented and geographically distributed set of construction stakeholders collaborating together. Although the concept of CIC has been the subject of research for many years, its uptake has been very limited due to the development of the technology and its effective implementation. Research in this area is still premature and does not pay much attention to the development and implementation of the prototypes in the industry. As a result, the research developments have remained as prototypes although they have captured industrial interest. However, ongoing research within the field of construction IT is stressing that it is crucial to define research methodologies for human centred and adaptive CIC developments through industry‐wide knowledge sharing. The aim of this paper, through triangulated research strategy of interviews, surveys and case study is to justify the need for a requirements engineering process as a CIC development methodology for adaptive and user‐centred systems developments and as a guideline to bridge the gap between industry and the research community. The case study project is the DIVERCITY system development undertaken by researchers and practitioners across Europe to develop a shared virtual construction design and briefing environment that enables the construction industry to better undertake the client briefing and design review phases of a construction project.
Details
Keywords
Saznizam Sazmee Sinoh, Faridah Othman and Zainah Ibrahim
This paper aimed to identify critical success factors (CSFs) of building information modeling (BIM) implementation among architectural, engineering and construction (AEC) firms in…
Abstract
Purpose
This paper aimed to identify critical success factors (CSFs) of building information modeling (BIM) implementation among architectural, engineering and construction (AEC) firms in Malaysia using quantitative statistical methods.
Design/methodology/approach
A questionnaire survey was conducted on the population of all AEC firms in Malaysia to rank the relative importance of 15 success factors (SFs) for BIM implementation in the firm on a 5-point Likert scale. The sampling frame consisted of all members registered with the Construction Industry Development Board (CIDB) from which 184 responses were received. The distinction between SFs and CSFs was achieved by a normalized mean cutoff value. Principal component analysis (PCA) was used to determine the relative groupings of the CSFs and structural equation modeling (SEM) were used to examine the underlying relationships between the CSF groupings.
Findings
Results of this study validated 11 previously identified CSFs for successful implementation of BIM among Malaysian AEC firms. Non-technical factors such as management, leadership and coordination were found to have higher relevance compared to technical factors such as software and hardware. Ranking analysis of the CSFs found internal coordination factors to have more importance compared to external coordination factors. PCA revealed 4 principal components (PCs) from the 11 CSFs. Together, these four PCs explain 74.3% of the variance in the data. Also, six hypothesized relationships between these groupings were supported using PLS-SEM.
Research limitations/implications
This study found an interaction between internal and external coordination factors for the implementation of BIM. Future research could explore the dynamics of both intra- and inter-firm coordination, which may create an environment suitable for BIM implementation.
Practical implications
This study provides Malaysian AEC firms with a general strategy on how to approach the implementation of BIM within the firm. In addition, government initiatives should focus on increasing BIM competency of graduates entering the workforce. This can be achieved through the development of a national BIM curriculum. Apart from that, the implementation of BIM requires a radical shift in the traditional building delivery process, not just simply acquiring new software and hardware.
Originality/value
This study revealed that the interactions between different firms at the industry level can influence successful implementation of BIM at the firm level. CSFs for BIM implementation at the firm level have been extensively studied. However, few studies exist which explore the inter-firm collaborations at the industry level that facilitate successful BIM implementation.
Details
Keywords
The transformation of cities from the industrial age (unsustainable) to the knowledge age (sustainable) is essentially a “whole life cycle” process consisting of planning…
Abstract
Purpose
The transformation of cities from the industrial age (unsustainable) to the knowledge age (sustainable) is essentially a “whole life cycle” process consisting of planning, development, operation, reuse and renewal. During this transformation, a multi‐disciplinary knowledge base, created from studies and research about the built environment aspects is fundamental: historical, architectural, archeologically, environmental, social, economic, etc., and critical. Although there are a growing number of applications of 3D VR modelling applications, some built environment applications such as disaster management, environmental simulations, computer‐aided architectural design and planning require more sophisticated models beyond 3D graphical visualization such as multifunctional, interoperable, intelligent, and multi‐representational. Advanced digital mapping technologies such as 3D laser scanner technologies can be enablers for effective e‐planning, consultation and communication of users' views during the planning, design, construction and lifecycle process of the built environment. These technologies can be used to drive the productivity gains by promoting a free‐flow of information between departments, divisions, offices, and sites; and between themselves, their contractors and partners when the data captured via those technologies are processed and modelled into building information modelling (BIM). The use of these technologies is a key enabler to the creation of new approaches to the “Whole Life Cycle” process within the built and human environment for the twenty‐first century. This paper aims to look at this subject.
Design/methodology/approach
The paper describes the research towards BIM for existing structures via the point cloud data captured by the 3D laser scanner technology. A case study building is used to demonstrate how to produce 3D CAD models and BIM models of existing structures based on designated techniques.
Findings
The paper finds that BIM can be achieved for existing structures by modelling the data captured with 3D laser scanner from the existing world. This can be accomplished by adapting appropriate automated data processing and pattern recognition techniques through applied science research.
Practical implications
BMI will enable automated and fast data capture and modelling for not only in design and planning, building refurbishment, effective heritage documentation and VR modelling but also disaster management, environmental analysis, assessment and monitoring, GIS implementation, sophisticated simulation environments for different purposes such as climate change, regeneration simulation for complexity and uncertainty and so on. As a result, it will increase the capability for fast production of virtual reality models and comprehensive and sophisticated simulation platforms.
Originality/value
The paper provides useful information on BMI for existing structures.
Details
Keywords
Yusuf Arayici and Ghassan Aouad
This paper aims at proposing a process of requirements engineering for the human centred, adaptive computer integrated construction systems development through industry wide…
Abstract
Purpose
This paper aims at proposing a process of requirements engineering for the human centred, adaptive computer integrated construction systems development through industry wide information sharing.
Design/methodology/approach
The research strategy is based on case study research methodology. The EU‐funded DIVERCITY project was analysed. This project was undertaken by a European consortium of researchers and practitioners from the construction industry. They developed a virtual environment that enables the industry to undertake collaboratively the client briefing and design reviews and the construction stages.
Findings
DIVERCITY's requirements engineering approach has the potential to provide opportunities for research to determine the appropriate requirements engineering techniques for the development of the systems and their effective implementation in the construction industry.
Originality/value
The main contribution of the research is the construction of the requirements engineering process for the development of the computer integrated construction systems.
Details