Search results

1 – 10 of 251
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 1 September 2005

Yusuf Arayici, Ghassan Aouad and Vian Ahmed

Collaborative working using Information and Communication Technologies (ICT) systems in construction has become a reality as many activities are performed globally with actors…

916

Abstract

Collaborative working using Information and Communication Technologies (ICT) systems in construction has become a reality as many activities are performed globally with actors located in various geographical locations. Computer Integrated Construction (CIC) is the type of ICT system that binds a fragmented and geographically distributed set of construction stakeholders collaborating together. Although the concept of CIC has been the subject of research for many years, its uptake has been very limited due to the development of the technology and its effective implementation. Research in this area is still premature and does not pay much attention to the development and implementation of the prototypes in the industry. As a result, the research developments have remained as prototypes although they have captured industrial interest. However, ongoing research within the field of construction IT is stressing that it is crucial to define research methodologies for human centred and adaptive CIC developments through industry‐wide knowledge sharing. The aim of this paper, through triangulated research strategy of interviews, surveys and case study is to justify the need for a requirements engineering process as a CIC development methodology for adaptive and user‐centred systems developments and as a guideline to bridge the gap between industry and the research community. The case study project is the DIVERCITY system development undertaken by researchers and practitioners across Europe to develop a shared virtual construction design and briefing environment that enables the construction industry to better undertake the client briefing and design review phases of a construction project.

Details

Construction Innovation, vol. 5 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Available. Content available
Article
Publication date: 19 October 2018

Zeeshan Aziz and Yusuf Arayici

1017

Abstract

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Access Restricted. View access options
Article
Publication date: 5 April 2011

Y. Arayici, P. Coates, L. Koskela, M. Kagioglou, C. Usher and K. O'Reilly

This paper aims to present a systematic approach for building information modelling (BIM) implementation for architectural SMEs at the organizational level

13960

Abstract

Purpose

This paper aims to present a systematic approach for building information modelling (BIM) implementation for architectural SMEs at the organizational level

Design/methodology/approach

The research is undertaken through a knowledge transfer partnership (KTP) project between the University of Salford and John McCall Architects (JMA) a SME based in Liverpool. The overall aim of the KTP is to develop lean design practice through BIM adoption. The BIM implementation approach uses a socio‐technical view, which does not only consider the implementation of technology but also considers the socio‐cultural environment that provides the context for its implementation. The action research oriented qualitative and quantitative research is used for discovery, comparison, and experimentation as it provides “learning by doing”.

Findings

The strategic approach to BIM adoption incorporated people, process and technology equally and led to capacity building through the improvements in process, technological infrastructure and upskilling of JMA staff to attain efficiency gains and competitive advantages.

Originality/value

The paper introduces a systematic approach for BIM adoption based on the action research philosophy and demonstrates a roadmap for BIM adoption at the operational level for SME companies.

Details

Structural Survey, vol. 29 no. 1
Type: Research Article
ISSN: 0263-080X

Keywords

Access Restricted. View access options
Article
Publication date: 11 July 2008

Yusuf Arayici

The transformation of cities from the industrial age (unsustainable) to the knowledge age (sustainable) is essentially a “whole life cycle” process consisting of planning…

6154

Abstract

Purpose

The transformation of cities from the industrial age (unsustainable) to the knowledge age (sustainable) is essentially a “whole life cycle” process consisting of planning, development, operation, reuse and renewal. During this transformation, a multi‐disciplinary knowledge base, created from studies and research about the built environment aspects is fundamental: historical, architectural, archeologically, environmental, social, economic, etc., and critical. Although there are a growing number of applications of 3D VR modelling applications, some built environment applications such as disaster management, environmental simulations, computer‐aided architectural design and planning require more sophisticated models beyond 3D graphical visualization such as multifunctional, interoperable, intelligent, and multi‐representational. Advanced digital mapping technologies such as 3D laser scanner technologies can be enablers for effective e‐planning, consultation and communication of users' views during the planning, design, construction and lifecycle process of the built environment. These technologies can be used to drive the productivity gains by promoting a free‐flow of information between departments, divisions, offices, and sites; and between themselves, their contractors and partners when the data captured via those technologies are processed and modelled into building information modelling (BIM). The use of these technologies is a key enabler to the creation of new approaches to the “Whole Life Cycle” process within the built and human environment for the twenty‐first century. This paper aims to look at this subject.

Design/methodology/approach

The paper describes the research towards BIM for existing structures via the point cloud data captured by the 3D laser scanner technology. A case study building is used to demonstrate how to produce 3D CAD models and BIM models of existing structures based on designated techniques.

Findings

The paper finds that BIM can be achieved for existing structures by modelling the data captured with 3D laser scanner from the existing world. This can be accomplished by adapting appropriate automated data processing and pattern recognition techniques through applied science research.

Practical implications

BMI will enable automated and fast data capture and modelling for not only in design and planning, building refurbishment, effective heritage documentation and VR modelling but also disaster management, environmental analysis, assessment and monitoring, GIS implementation, sophisticated simulation environments for different purposes such as climate change, regeneration simulation for complexity and uncertainty and so on. As a result, it will increase the capability for fast production of virtual reality models and comprehensive and sophisticated simulation platforms.

Originality/value

The paper provides useful information on BMI for existing structures.

Details

Structural Survey, vol. 26 no. 3
Type: Research Article
ISSN: 0263-080X

Keywords

Access Restricted. View access options
Article
Publication date: 18 October 2021

John Peter Cooney, David Oloke and Louis Gyoh

This study aims to demonstrate the possibility of showing the functionality of complex microbial groups, within ancient structures within a process of refurbishment on a heritage…

245

Abstract

Purpose

This study aims to demonstrate the possibility of showing the functionality of complex microbial groups, within ancient structures within a process of refurbishment on a heritage building information modelling (BIM) platform.

Design/methodology/approach

Both a qualitative and qualitative research method will be used throughout, as observational and scientific results will be obtained and collated. This path being; phenomena – acquisition tools – storage – analysis tools – literature. Using this methodology, one pilot study within the scope of demolition and refurbishment, using suitable methods of collecting and managing data (structural or otherwise), will be used and generated by various software and applications. The principle methods used for the identification of such micro-organisms will incorporate a polymerase chain reaction method (PCR), to amplify DNA and to identify any or all spores present. The BIM/historical BIM (HBIM) process will be used to create a remotely-based survey to obtain and collate data using a laser scanner to produce a three-dimensional point cloud model to evaluate and deduce the condition, make-up and stature of the monument. A documentation management system will be devised to enable the development of plain language questions and an exchange information requirement, to identify such documentation required to enable safe refurbishment and to give health and safety guidance. Four data sampling extractions will be conducted, two for each site, within the research, for each of the periods being assessed, that being the Norman and Tudor areas of the monument.

Findings

From laboratory PCR analysis, results show a conclusive presence of micro-organism groups and will be represented within a hierarchical classification, from kingdom to species.

Originality/value

The BIM/HBIM process will highlight results in a graphical form to show data collected, particularly within the PCR application. It will also create standardisation and availability for such data from ancient monuments to make available all data stored, as such analysis becomes substantially important to enable the production of data sets for comparison, from within the framework of this research.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Article
Publication date: 16 November 2022

Ahmet Gökçe Akpolat

This study aims to examine the impact of some real variables such as real effective exchange rates, real mortgage rates, real money supply, real construction cost index and…

780

Abstract

Purpose

This study aims to examine the impact of some real variables such as real effective exchange rates, real mortgage rates, real money supply, real construction cost index and housing sales on the real housing prices.

Design/methodology/approach

This study uses a nonlinear autoregressive distributed lag (NARDL) model in the monthly period of 2010:1–2021:10.

Findings

The real effective exchange rate has a positive and symmetric effect. The decreasing effect of negative changes in real money supply on real housing prices is higher than the increasing effect of positive changes. Only positive changes in the real construction cost index have an increasing and statistically significant effect on real house prices, while only negative changes in housing sales have a small negative sign and a small increasing effect on housing prices. The fact that the positive and negative changes in real mortgage rates are negative and positive, respectively, indicates that both have a reducing effect on real housing prices.

Originality/value

This study suggests the first NARDL model that investigates the asymmetric effects on real housing prices instead of nominal housing prices for Turkey. In addition, the study is the first, to the best of the authors’ knowledge, to examine the effects of the five real variables on real housing prices.

Details

International Journal of Housing Markets and Analysis, vol. 17 no. 3
Type: Research Article
ISSN: 1753-8270

Keywords

Access Restricted. View access options
Article
Publication date: 31 May 2019

Maria Christina Georgiadou

This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value…

11109

Abstract

Purpose

This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value and practical implications of BIM implementation in residential projects by evaluating practitioners’ perspectives working in the Greater London Area (GLA).

Design/methodology/approach

The paper outlines the general status quo of BIM adoption and maturity in the UK. It then discusses the feasibility of BIM use in residential projects drawing on an online survey and complementary semi-structured interviews with building professionals. The cross-comparison between the evidence base and literature review uncovers the specific benefits, challenges and risks to BIM implementation in the house building sector.

Findings

BIM is an evaluation methodology that helps the management of digital information throughout the project lifecycle. At a conceptual level, a BIM-enabled project offers quality assurance and on-time delivery, collaboration and communication improvement, visual representation and clash detection and whole lifecycle value. The findings, however, suggest that the most frequently reported benefits are related to collaboration and the blend of product (software) and process innovation, whilst lifecycle thinking and waste reduction are often overlooked. At present, there is widespread awareness on BIM but with a financial barrier to invest in developing digital capabilities, particularly for small- and medium-sized enterprises.

Practical implications

The paper concludes with a critical commentary on the lack of strategic leadership in both the supply and demand side. The role of policy to streamline commercial drivers for whole lifecycle costing in procurement is endorsed to drive the change management required to address the short-term mind-set of senior management and wider fragmentation of the construction industry, also serving as a research question for further research and development in the field.

Originality/value

There are relatively few studies evaluating BIM perspectives in UK residential projects. This paper explores the feasibility and “real-life” value of BIM in housing practice, drawing on views and experiences of building professionals in GLA. In particular, the research findings provide an evidence base evaluating the extent to which the house building industry has the expertise and capability to operate in a BIM environment and to comply with the Level 2 mandate and explore which of the generic barriers and drivers of BIM-readiness are more relevant to the design and construction of housing projects.

Access Restricted. View access options
Article
Publication date: 13 April 2018

Christopher James Roberts, Erika Anneli Pärn, David John Edwards and Clinton Aigbavboa

Advancements in digital technologies have provided significant opportunities to improve the Architecture, Engineering, Construction and Owner-operated (AECO) sector’s performance…

1953

Abstract

Purpose

Advancements in digital technologies have provided significant opportunities to improve the Architecture, Engineering, Construction and Owner-operated (AECO) sector’s performance through superior data management, streamlined processes and cooperative working practices. However, whilst academic literature widely espouses these benefits during the design and construction phases of development, research suggests that the operational phase of a building’s lifecycle has yet to fully realise performance improvements available through the application of digital modelling technology. The purpose of this paper is to synthesise extant digital modelling, asset management and emergent digital asset management literature, to report upon the beneficial implications of digitalised asset management and identify obstacles hampering its adoption in industry.

Design/methodology/approach

A componential synthesis of future work reported upon in extant literature is organised into thematic categories that indicate potential research avenues and a trajectory for digital asset management research and practice.

Findings

Themes identified include: imprecise Building Information Modelling definitions; isolated software development; data interoperability; intellectual property and virtual property rights; and skills and training requirements. Notably, increased environmental performance also arose as a theme requiring further research but received considerably less academic coverage than the other obstacles identified.

Originality/value

The work presents a comprehensive review of digital technologies utilised within the AECO sector and as such provides utility to researchers, policy makers and practitioners to enhance their knowledge capabilities.

Details

International Journal of Building Pathology and Adaptation, vol. 36 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords

Access Restricted. View access options
Article
Publication date: 25 April 2018

Taqiadden Almuntaser, Muizz O. Sanni-Anibire and Mohammad A. Hassanain

The adoption of building information modeling (BIM) technology in the global architecture, engineering and construction (AEC) industries is steadily increasing. However…

2577

Abstract

Purpose

The adoption of building information modeling (BIM) technology in the global architecture, engineering and construction (AEC) industries is steadily increasing. However, developing countries such as Saudi Arabia are still lagging behind. The purpose of this paper is to present a framework for BIM adoption in the AEC industry in Saudi Arabia through a case study.

Design/methodology/approach

The study adopted a two-pronged approach. First, the various stages, benefits and challenges of BIM implementation in a local AEC firm’s pilot project were documented. Then, a BIM maturity measurement of the pilot project was conducted, and identification of the areas where improvements can be made.

Findings

BIM implementation provided several benefits and efficiency gains. These include a faster design processes, effective reuse of information and overall client satisfaction. Challenges faced include a lack of interest by clients and industry stakeholders, inadequate experience of the BIM team, and lack of mentorship from a BIM champion. The findings of the BIM maturity measurement were presented as an implementation framework in the five process areas and ten subject areas of the Project Management Institute’s (PMI) project management framework.

Originality/value

Though, frameworks, guidelines and protocols have been developed to facilitate the successful adoption of BIM, the issue is not a case of “one size fits all.” This study thus introduces the much needed awareness in the research and professional domain in Saudi Arabia. It also presents the proposed framework in the PMI framework, which is an incremental innovation to previous work.

Details

International Journal of Managing Projects in Business, vol. 11 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Access Restricted. View access options
Article
Publication date: 8 November 2019

Abdullah Al-Yami and Muizz O. Sanni-Anibire

Although there is a boom in the construction industry in the Kingdom of Saudi Arabia (KSA), it is yet to fully adopt building information modeling (BIM), which has received a lot…

1816

Abstract

Purpose

Although there is a boom in the construction industry in the Kingdom of Saudi Arabia (KSA), it is yet to fully adopt building information modeling (BIM), which has received a lot of attention in the US, UK and Australian construction industries. Thus, the purpose of this paper is to provide the current state of the art in BIM implementation in Saudi Arabia, as well as perceived benefits and barriers through a case study.

Design/methodology/approach

A broad overview of BIM, the construction industry in KSA and the research and implementation of BIM in KSA was presented in this study. The research further established the perceived benefits and barriers of BIM implementation through a case study of a local AEC firm. A questionnaire survey was used to obtain lessons learned from the BIM team of the pilot project and was further analyzed using the RII approach.

Findings

The study’s findings include the lack of policy initiatives in KSA to enforce BIM in the construction industry, as well as the lack of sufficient research in the domain of BIM in KSA. Furthermore, the case study also revealed that the most important benefit of BIM adoption is “detection of inter-disciplinary conflicts in the drawings to reduce error, maintain design intent, control quality and speed up communication,” whereas the most important barrier is “the need for re-engineering many construction projects for successful transition towards BIM.”

Originality/value

The study provides a background for enhanced research towards the implementation of BIM in Saudi Arabia and also demonstrates the potential benefits and barriers in BIM implementation.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of 251
Per page
102050