Search results
1 – 6 of 6Kexin Zhang, Tianyu Qi, Dachao Li, Xingwei Xue and Zhimin Zhu
The paper aims to investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening, and health…
Abstract
Purpose
The paper aims to investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening, and health monitoring after reinforcement were carried out. The results of concrete strain and deflection show that the flexural strength and stiffness of the strengthened beam are improved.
Design/methodology/approach
This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. High strength, low relaxation steel strand with high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with prestressed steel strand and steel plate was described. Ultimate bearing capacity of the bridge after strengthening was discussed based on finite element model.
Findings
The cumulative upward deflection of the second span the third span was 39.7 mm, which is basically consistent with the theoretical value, and the measured value is smaller than the theoretical value. The deflection value of the second span during data acquisition was −20 mm–10 mm, which does not exceed the maximum deflection value of live load, and the deflection of the bridge is in a safe state during normal use. Thus, this strengthened way with prestressed steel wire rope is feasible and effective.
Originality/value
This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. To investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening and health monitoring after reinforcement were carried out.
Details
Keywords
Kexin Zhang, Dachao Li, Xinyuan Shen, Wenyu Hou, Yanfeng Li and Xingwei Xue
This paper aims to describe carbon fiber reinforced plastics (CFRP) bars as a way to strengthen a 40-year-old stone arch bridge. To investigate effectiveness of the strengthening…
Abstract
Purpose
This paper aims to describe carbon fiber reinforced plastics (CFRP) bars as a way to strengthen a 40-year-old stone arch bridge. To investigate effectiveness of the strengthening method, fielding-load tests were carried out before and after strengthening.
Design/methodology/approach
High-strength CFRP bars with minor radius, high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with CFRP bars – including CFRP bars cutting, crack grouting, original structural surface treatment, implant drilling, CFRP bars installation and pouring mortar – was described. Ultimate bearing capacity of the bridge after strengthening was discussed.
Findings
The results of concrete stress and deflection show that the strength and stiffness of the strengthened bridge are improved. The strengthened way with CFRP bars is feasible and effective.
Originality/value
This paper describes CFRP bars as a way to strengthen a 40-year-old stone arch bridge.
Details
Keywords
Kexin Zhang, Qi Tianyu, Li Dachao, Xue Xingwei, Fayue Wu and Xinfeng Liu
In order to understand the status of the bridge reinforcement process, the construction process monitoring of the reinforced bridge is carried out. The T-beam bridge was tested…
Abstract
Purpose
In order to understand the status of the bridge reinforcement process, the construction process monitoring of the reinforced bridge is carried out. The T-beam bridge was tested using the truck loading test. The displacements and concrete strains of the bridge at mid-span were measured during the test.
Design/methodology/approach
This paper describes an innovative technique, external prestressing, used to strengthen a 36-year-old prestressed T-beam bridge. This paper introduces the construction process of the prestressed reinforcement method, and makes a theoretical analysis of the reinforced bridge through the establishment of the reinforcement model.
Findings
This study showed that the structural capacity and performance of the bridge were enhanced with externally prestressed steel strand strengthening.
Originality/value
The innovative reinforcement method of prestressed T-shaped bridge is put forward, which has guiding significance for similar bridge reinforcement and maintenance.
Details
Keywords
Kexin Zhang, Dachao Li and Xingwei Xue
In this paper, taking a p-section girder cable-stayed bridge as an example, the construction monitoring and load test of the bridge are implemented.
Abstract
Purpose
In this paper, taking a p-section girder cable-stayed bridge as an example, the construction monitoring and load test of the bridge are implemented.
Design/methodology/approach
In order to ensure the safety of cable-stayed bridge structure in construction and achieve the internal force state of the completed bridge, the construction process is monitored for liner and stress of the p-section girder, construction error and safety state during construction. At the same time, to verify whether the bridge can meet the design requirements, the static and dynamic load tests are done.
Findings
The results of construction monitoring show that the stress state of the structure during construction is basically consistent with the theoretical calculation and design requirements. The final measured stress state of the structure is within the allowable range of the cable-stayed bridge, and the structural stress state is normal and meets the specification requirements. The load tests results show that the measured deflection of the midspan section of the main girder is less than the theoretical calculation value. The maximum deflection of the main girder is 48.03 mm, which is less than 54.25 mm of the theoretical value, indicating that the main girder has sufficient structural stiffness. Under the dynamic load test, the natural frequency of the three spans of the bridge is less than the theoretical frequency.
Originality/value
This study can provide important reference value for the construction and maintenance of similar p-section girder cable-stayed bridges.
Details
Keywords
Xingwei Li, Jingru Li, Jinrong He, Yicheng Huang, Xiang Liu, Jiachi Dai and Qiong Shen
The surging market demand for green construction materials has brought opportunities for construction materials enterprises' greenwashing behavior (GWB). This study aims to…
Abstract
Purpose
The surging market demand for green construction materials has brought opportunities for construction materials enterprises' greenwashing behavior (GWB). This study aims to establish the causal relationship among the influencing factors of GWB and reveal the key influencing factors from the perspective of Chinese construction materials enterprises under multi-agent interactions.
Design/methodology/approach
This study is based on stakeholder theory, resource-based theory and the green development behavior and performance of industrial enterprises (GDBP-IE). First, with the literature analysis, an index framework of the influencing factors of enterprises' GWB was constructed from five dimensions (including 15 factors): environmental regulation, public scrutiny, market environment, corporate resources and corporate green development (GD) performance. Second, the interactive relationship among influencing factors was obtained by a questionnaire survey. Finally, the data are processed and analyzed with the grey-DEMATEL (Decision-making Trial and Evaluation Laboratory) method.
Findings
Among the factors, corporate information transparency has the greatest impact on the other factors, and consumer green preferences are most influenced by others. The most critical and important factor is the corporate social performance factor. In China, corporate social performance, corporate information transparency, corporate size and media supervision are the key factors influencing the GWB of construction materials enterprises.
Originality/value
This study provides a new perspective on the literature related to GWB by considering multi-agent interactions and extends the evidence from the construction materials industry for research on the drivers or influencing factors of enterprises' bad environmental behavior. Furthermore, it adds insights from China for further research on the governance strategies of GWB in other countries.
Details
Keywords
P.A. Montenegro, José A.F.O. Correia, Abilio M.P. de Jesus and Rui A.B. Calçada