Article
Publication date: 2 January 2024

Xin Zou and Zhuang Rong

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling…

Abstract

Purpose

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling problem (RCRSP) models assume that there is only one sequence in performing the sub-activities of each activity, resulting in an inefficient resource allocation. This paper proposes a novel repetitive scheduling model for solving RCRSP with soft logic.

Design/methodology/approach

In this paper, a constraint programming model is developed to solve the RCRSP using soft logic, aiming at the possible relationship between parallel execution, orderly execution or partial parallel and partial orderly execution of different sub activities of the same activity in repetitive projects. The proposed model integrated crew assignment strategies and allowed continuous or fragmented execution.

Findings

When solving RCRSP, it is necessary to take soft logic into account. If managers only consider the fixed logic between sub-activities, they are likely to develop a delayed schedule. The practicality and effectiveness of the model were verified by a housing project based on eight different scenarios. The results showed that the constraint programming model outperformed its equivalent mathematical model in terms of solving speed and solution quality.

Originality/value

Available studies assume a fixed logic between sub-activities of the same activity in repetitive projects. However, there is no fixed construction sequence between sub-activities for some projects, e.g. hotel renovation projects. Therefore, this paper considers the soft logic relationship between sub-activities and investigates how to make the objective optimal without violating the resource availability constraint.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 March 2021

Xin Zou, Lihui Zhang and Qian Zhang

The purpose of this research is to develop a time-cost optimization model to schedule repetitive projects while considering limited resource availability.

Abstract

Purpose

The purpose of this research is to develop a time-cost optimization model to schedule repetitive projects while considering limited resource availability.

Design/methodology/approach

The model is based on the constraint programming (CP) framework; it integrates multiple scheduling characteristics of repetitive activities such as continuous or fragmented execution, atypical activities and coexistence of different modes in an activity. To improve project performance while avoiding inefficient hiring and firing conditions, the strategy of bidirectional acceleration is presented and implemented, which requires keeping regular changes in the execution modes between successive subactivities in the same activity.

Findings

Two case studies involving a real residential building construction project and a hotel refurbishing project are used to demonstrate the application of the proposed model based on four different scenarios. The results show that (1) the CP model has great advantages in terms of solving speed and solution quality than its equivalent mathematical model, (2) higher project performance can be obtained compared to using previously developed models and (3) the model can be easily replicated or even modified to enable multicrew implementation.

Originality/value

The original contribution of this research is presenting a novel CP-based repetitive scheduling optimization model to solve the multimode resource-constrained time-cost tradeoff problem of repetitive projects. The model has the capability of minimizing the project total cost that is composed of direct costs, indirect costs, early completion incentives and late completion penalties.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 December 2024

Xin Zou and Lihui Zhang

The purpose of this study is to develop a novel approach that addresses time-cost tradeoffs in repetitive construction projects while considering the uncertainty in activity…

Abstract

Purpose

The purpose of this study is to develop a novel approach that addresses time-cost tradeoffs in repetitive construction projects while considering the uncertainty in activity durations and the risk preferences of planners.

Design/methodology/approach

Our study involves work in three aspects. Firstly, it employs triangular fuzzy numbers to represent activity durations in different units, which facilitates the management of scenarios characterized by limited historical data or the presence of ambiguous information. Secondly, it introduces a fuzzy chance-constrained programming model, which is aimed at minimizing the project budget while ensuring that the risks associated with cost overruns and schedule delays are confined to specified limits. Thirdly, it advances an enhanced genetic algorithm, integrating an electromagnetism-like mechanism and a scheduling repair process, to improve the efficiency and effectiveness of the optimization process.

Findings

A real-life street renovation project was analyzed to demonstrate the applicability of the proposed algorithm. The analysis explored three common types of risk preferences: risk-averse, risk-neutral and risk-loving. The results indicate that the proposed algorithm surpasses existing fuzzy repetitive scheduling methods in terms of risk management. It effectively generates schedules that align with the risk preferences of planners and provides worst-case estimates of project performance.

Originality/value

This research makes a significant contribution to the field by developing a fuzzy chance-constrained programming model and an associated optimization algorithm that is specifically designed for time-cost tradeoffs in repetitive construction projects. A key distinction is that this study considers the risk preferences of planners, which sets it apart from previously developed models. As a result, it provides a practical approach for effective risk management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 May 2020

Lihui Zhang, Guyu Dai, Xin Zou and Jianxun Qi

Interrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to…

Abstract

Purpose

Interrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to mitigate the negative impact caused by work continuity uncertainty based on the notion of robustness.

Design/methodology/approach

This paper develops a float-based robustness measurement method for the work continuity uncertainty in repetitive projects. A multi-objective optimization model is formulated to generate a schedule that achieves a balance between crew numbers and robustness. This model is solved using two modules: optimization module and decision-making module. The Monte Carlo simulation is designed to validate the effectiveness of the generated schedule.

Findings

The results confirmed that it is necessary to consider the robustness as an essential factor when scheduling a repetitive project with uncertainty. Project managers may develop a schedule that is subject to delays if they only make decisions according to the results of the deadline satisfaction problem. The Monte Carlo simulation validated that an appropriate way to measure robustness is conducive to generating a schedule that can avoid unnecessary delay, compared to the schedule generated by the traditional model.

Originality/value

Available studies assume that the work continuity is constant, but it cannot always be maintained when affected by uncertainty. This paper regards the work continuity as a new type of uncertainty factor and investigates how to mitigate its negative effects. The proposed float-based robustness measurement can measure the ability of a schedule to absorb unpredictable and harmful interruptions, and the proposed multi-objective scheduling model provides a way to incorporate the uncertainty into a schedule.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 September 2020

Xin Zou, Guangchuan Wu and Qian Zhang

Repetitive projects play an important role in the construction industry. A crucial point in scheduling this type of project lies in enabling timely movement of crews from unit to…

Abstract

Purpose

Repetitive projects play an important role in the construction industry. A crucial point in scheduling this type of project lies in enabling timely movement of crews from unit to unit so as to minimize the adverse effect of work interruptions on both time and cost. This paper aims to examine a repetitive scheduling problem with work continuity constraints, involving a tradeoff among project duration, work interruptions and total project cost (TPC). To enhance flexibility and practicability, multi-crew execution is considered and the logic relation between units is allowed to be changed arbitrarily. That is, soft logic is considered.

Design/methodology/approach

This paper proposes a multi-objective mixed-integer linear programming model with the capability of yielding the optimal tradeoff among three conflicting objectives. An efficient version of the e-constraint algorithm is customized to solve the model. This model is validated based on two case studies involving a small-scale and a practical-scale project, and the influence of using soft logic on project duration and total cost is analyzed via computational experiments.

Findings

Using soft logic provides more flexibility in minimizing project duration, work interruptions and TPC, especial for non-typical projects with a high percentage of non-typical activities.

Research limitations/implications

The main limitation of the proposed model fails to consider the learning-forgetting phenomenon, which provides space for future research.

Practical implications

This study assists practitioners in determining the “most preferred” schedule once additional information is provided.

Originality/value

This paper presents a new soft logic-based mathematical programming model to schedule repetitive projects with the goal of optimizing three conflicting objectives simultaneously.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 July 2012

Alberto De Marco, Giulio Mangano and Xin‐Yu Zou

The purpose of this paper is to determine the fundamental factors influencing the equity share in build‐operate‐transfer (BOT) investments in relation to the project risk profile.

Abstract

Purpose

The purpose of this paper is to determine the fundamental factors influencing the equity share in build‐operate‐transfer (BOT) investments in relation to the project risk profile.

Design/methodology/approach

The relationships between risk factors and equity participation into the capital structure of a BOT contract are examined using regression analysis of a dataset of toll road projects.

Findings

Results suggest that the inflation rate, the size of the investment, the construction period, the solidity of the vehicle company, and the organizational structure of the project are significant variables of the equity portion of financing.

Practical implications

The analysis may support project promoters by providing better understanding of the factors that might facilitate high debt leverages and by providing lending institutions with valuable information to integrate the method of determining the appropriate debt resources to be injected into a BOT project.

Originality/value

The paper contributes towards growing the body of knowledge regarding the way public‐private partnership initiatives are carried over and helps refine the capital structures of BOT projects.

Details

Built Environment Project and Asset Management, vol. 2 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 December 2022

Xinhong Zou, Hongchang Ding and Jinhong Li

This paper aims to present a sliding mode control method based on disturbance observer (DO) for improving the reaching law of permanent magnet synchronous motor (PMSM).

Abstract

Purpose

This paper aims to present a sliding mode control method based on disturbance observer (DO) for improving the reaching law of permanent magnet synchronous motor (PMSM).

Design/methodology/approach

Aiming at the insufficiency of the traditional exponential reaching law used in sliding mode variable structure control, an exponential reaching law related to the speed error is proposed. The improved exponential reaching law can adaptively adjust the size of the constant velocity term in the reaching law according to the size of the speed error, so as to adaptively adjust the speed of the system approaching the sliding mode surface to overcome the control deviation and improve the dynamic and steady state performance. To improve the anti-interference ability of the system, a DO is proposed to observe the external disturbance of the system, and the observed value is used to compensate the system. The stability of the system is analyzed by Lyapunov theorem. The effectiveness of this method is proved by simulation and experiment.

Findings

Simulation and experiment show that the proposed method has the advantages of fast response and strong anti-interference ability.

Research limitations/implications

The proposed method cannot observe the disturbance caused by the change of internal parameters of the system.

Originality/value

A sliding mode control method for PMSM is proposed, which has good control performance. The proposed method can effectively suppress chattering, ensure fast response speed and have strong anti-interference ability. The effectiveness of the algorithm is verified by simulation and experiment.

Details

COMPEL - The international journal for computation and mathematics in electrical and electronic engineering , vol. 42 no. 6
Type: Research Article
ISSN: 0332-1649

Keywords

Article
Publication date: 21 November 2024

Jianhui Mao, Bo Yu and Chao Guan

Explore the impact of Party organization embedding on firm green governance.

Abstract

Purpose

Explore the impact of Party organization embedding on firm green governance.

Design/methodology/approach

The regression analysis method.

Findings

The findings show that Party organization embedding significantly enhances the green governance effects of firms, with this effect being more pronounced in environments with high-quality internal control. Moreover, the study reveals that Party organization embedding facilitates green governance through mechanisms such as reducing agency costs and optimizing management decisions. Agency costs have a negative transmission effect, while management decisions have a positive transmission effect, with the quality of internal control playing a crucial moderating role.

Research limitations/implications

Most existing studies on firm green governance have focused on aspects such as the heterogeneity of management teams (Liu, 2019; Wu et al., 2019), executive green cognition (Fineman and Clarke, 1996; Huang and Wei, 2023), organizational structure and the involvement of controlling families (Bertrand and Schoar, 2006; Symeou et al., 2019), with limited attention to the unique role of Party organizations’ incentive and restraint mechanisms, supervisory power and management functions in firm green governance. Additionally, while scholars have examined the impact of political embedding in firms, including Party organization embedding as a specific form of political embedding, and find that it affects various aspects of business performance (Chang and Wong, 2004; Gu and Yang, 2023), governance quality (Li et al., 2020; Huang and Yang, 2024), agency costs (Qian, 2000; Wang and Ma, 2014), excessive management compensation (Chang and Wong, 2004; Chen et al., 2014), social externalities and audit needs (Faccio, 2006; Cheng, 2022), there is still insufficient discussion on how Party organization embedding promotes firm green governance. Particularly in the context of China’s unique system and using Chinese data, there is a need for more in-depth research on the impact of Party organization embedding on firm green governance. This paper addresses this research gap by empirical analysis.

Practical implications

Overall, this study has significant theoretical and practical implications. Theoretically, it enriches the literature on Party organization embedding and firm green governance, filling a gap in the intersection research of firm governance and green governance. Practically, on the one hand, this paper’s findings demonstrate that the involvement of Party organizations in firm governance plays a significant role in enhancing green governance. This supports the modernization of firm governance in China, establishes a micro-level foundation for achieving the strategic goals of “carbon peaking and carbon neutrality” and offers empirically-backed insights into green transformation for policymakers. The research also provides practical policy recommendations for strengthening Party building efforts within firms and optimizing government-business relations, thereby facilitating the deep integration of Party building with business operations. On the other hand, this study highlights that the unique feature of China’s corporate governance system, Party organization embedding, can effectively enhance green governance. This offers empirical support for leveraging the strengths of China’s firm governance model and provides valuable governance strategies for firms in other countries and regions to improve their green governance practices.

Social implications

This study’s social implications are significant as it highlights the broader societal benefits that arise from integrating Party organization involvement into firm governance structures, especially within the context of green governance. By improving the green governance practices of firms, Party organization embedding helps to address pressing environmental issues such as pollution, carbon emissions and resource depletion, which ultimately contributes to healthier living environments and a more sustainable society. The emphasis on green governance supports China’s national strategy for sustainable development and demonstrates a governance model that balances economic growth with environmental stewardship. Additionally, the study underscores the role of Party organizations in fostering social responsibility, equity and cohesion by ensuring that firm decision-making aligns with both economic and social welfare goals. This model of governance provides a framework that can serve as a reference for other countries and regions looking to enhance environmental protection efforts while maintaining social stability and economic progress.

Originality/value

This study offers original insights by exploring the distinctive role of Party organization embedding in enhancing firm green governance within the unique context of China’s political and economic systems. Unlike previous research, which has primarily focused on conventional governance structures, this paper delves into the underexplored area of how Party organizations influence firm-level green governance. By examining the direct and indirect effects of Party organization embedding, this study expands current understanding of corporate governance models that integrate political structures, providing a novel perspective on how firms can achieve both economic and environmental objectives. The findings not only contribute to the literature on green governance but also present a valuable model for emerging economies that are pursuing sustainable development. This research thus provides a meaningful addition to the dialogue on corporate governance innovation and environmental responsibility.

Details

China Finance Review International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1398

Keywords

Article
Publication date: 20 June 2022

Changlong Ye, Yunfei Du, Suyang Yu, Qiang Zhao and Chunying Jiang

With the development of automation technology, the accuracy, bearing capacity and self-adaptation requirements of wheeled mobile robots are more and more demanding under various…

Abstract

Purpose

With the development of automation technology, the accuracy, bearing capacity and self-adaptation requirements of wheeled mobile robots are more and more demanding under various complex conditions, which will urge designers such shortcomings as the low accuracy, poor flexibility and weak obstacle crossing ability of traditional heavy haul vehicles and improve the wear resistance and bearing capacity of traditional omnidirectional wheels.

Design/methodology/approach

The optimal configuration for heavy payload transportation is obtained by building sliding friction consumption model of traditional wheels with different driving types based on Hertz tangential contact theory. The heavy payload omnidirectional wheel with a double-wheel steering and a coupled differential wheel driving is designed with the optimal configuration. The wheel consists of a differential gear train unit and a nonindependent suspension unit. Kinematics model of the wheel is established and relative parameters are optimized.

Findings

The prototype experiments show that the wheel has higher motion accuracy and environment adaptability. The results are consistent with the theoretical calculation, which show that the accuracy is more than 50% higher than that of differential prototype. The motion stability and the accuracy of the coupled differential omnidirectional wheel are better than those of the traditional omnidirectional wheels during the moving and obstacle crossing process under complex conditions, which verifies the correctness and advantages of the design.

Originality/value

Aiming at the specific application of heavy payload omnidirectional transportation, a new omnidirectional mobile mechanism with a two-wheel coupling drive structure and an adaptive mechanism is proposed. The simulation and experimental results show that it can realize the high-precision heavy-load omnidirectional movement, the effective contact with the ground and improve the adaptability to the rugged ground. It is flexible, simple and modular and can be widely applied to transportation, exploration, detection and other related industrial fields.

Details

Industrial Robot: the international journal of robotics research and application, vol. 49 no. 6
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 8 August 2019

Yanyu Wang, Xin Su, Huan Wang and Renyu Zou

As the carrier of knowledge, intellectual capital plays a crucial role in technology capability. However, most of the previous studies focus on technological capability from a…

1281

Abstract

Purpose

As the carrier of knowledge, intellectual capital plays a crucial role in technology capability. However, most of the previous studies focus on technological capability from a static perspective, rather than take dynamic technology capability into consideration. Based on this research gap, the purpose of this paper is to investigate the effects of intellectual capital and its sub-dimensions on dynamic technology capability, measuring by the factor scores of five technological input and output variables.

Design/methodology/approach

The authors combine the system dynamic method and empirical study to guarantee the internal and external validity. Specifically, the authors design the system dynamic model and simulation to analyze the system mechanism of intellectual capital and its sub-dimensions on dynamic technology capabilities from four cause and effect feedback loops. Then, the authors propose eight hypotheses based on this system dynamic model. In the empirical test phase, the authors employed a panel data set pertaining to Chinese manufacturing firms from 2007 to 2017, and adopted the fixed effect panel model according to Hausman test.

Findings

The authors find that intellectual capital efficiency (ICE) and its sub-dimensions (i.e. human capital efficiency, organizational capital efficiency and capital employed efficiency (CEE) have significantly positive impacts on dynamic technology capability. The results also show that the positive effects of ICE and OC on dynamic technology capability would be strengthened in state-owned enterprises compared with non-state-owned enterprises, while this moderation effect is weakened on the relationship between CEE and dynamic technology capability.

Originality/value

In this study, the authors first introduce the system dynamic method to explore the relationship of intellectual capital and dynamic technology capability, which is a valuable trial on combining system science and empirical study. Additionally, the authors continue to expand the dynamic technology capability from the intellectual capital perspective, and also find the moderating effect from the ownership aspect. It is beneficial to the theoretical development of intellectual capital and dynamic technology capability. Furthermore, the authors provide significant inspirations and implications for enterprise’s managers.

Details

Journal of Intellectual Capital, vol. 20 no. 4
Type: Research Article
ISSN: 1469-1930

Keywords