Search results

1 – 3 of 3
Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 October 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Udara Ranasinghe, Aparna Samaraweera, Raufdeen Rameezdeen, Sasanka Gallage, William Robert Newman, Benjamin James White and Delvin Noel Tze Wei Lim

Many work-related factors particularly affect the mental well-being of young construction workers and subsequently affect their productivity at work. Young construction workers in…

Abstract

Purpose

Many work-related factors particularly affect the mental well-being of young construction workers and subsequently affect their productivity at work. Young construction workers in South Australia are more vulnerable than other workers because they consider the distress arising from work-related factors to be part of adapting to a new work life. Therefore, this study seeks to draw out the work-related factors that affect the mental well-being of young construction workers.

Design/methodology/approach

The study employed a sequential mixed method approach including a preliminary qualitative case study and a quantitative survey. Around 20 interviews across two organisations were conducted in the initial case study and content analysis was used to contextualise the factors and identify new factors. Then, the outcome of the case study was fed into a questionnaire survey for further analysis. The survey received 43 valid responses. Principal component analysis (PCA) was performed on the survey outcome to assess and categorise the work-related factors.

Findings

The findings indicate ten prominent work-related factors contributing to poor mental well-being of young construction workers related to three main categories of factors, namely “nature of work”, “task-related stress” and “unsupportive behaviour”. The work-related factors that have the greatest impact on mental well-being are the machoism culture of industry, work overload and workplace bullying.

Originality/value

The outcome from this study enhances the understanding of key work-related factors affecting the mental well-being of young construction workers. Research findings would also help inform the development of clear, industry-informed initiatives tailored to protect and support young construction workers.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 24 August 2023

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, Jorge Ochoa Paniagua, Aparna Samaraweera and Larissa Statsenko

This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at…

Abstract

Purpose

This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at each stage of the offsite construction supply chain (OSC-SC) to compile contributions to knowledge and thereby determine the future research directions to improve supply chain resilience (SCR).

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 99 peer-reviewed journal papers published between 2015 and mid-2022 were shortlisted and analysed through the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines.

Findings

The bibliometric analysis revealed that the research focusing on supply chain issues and developing best practices in offsite construction adopt case study approaches to investigate the research problems comprehensively. The content analysis revealed the lack of up-to-date knowledge in the construction workforce regarding OSC; low preparedness for the changes brought by the SC uncertainties; the lack of a proper procurement model for OSC; lack of end-to-end visibility of the supply chain to identify uncertainties and lack of national or government standards on OSC-SC, as some of the key problems instigating the identified the uncertainties.

Originality/value

This study clarifies the current knowledge by systematically presenting uncertainties at each stage of the OSC-SC. Moreover, it provides a framework and proposes that future research should focus specifically on individual/team, organisational, supply chain/network and sector/national/supranational levels to improve SCR.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 3 of 3