Search results

1 – 3 of 3
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 23 June 2021

Serkan Altuntas, Türkay Dereli and Zülfiye Erdoğan

This study aims to propose a service quality evaluation model for health-care services.

761

Abstract

Purpose

This study aims to propose a service quality evaluation model for health-care services.

Design/methodology/approach

In this study, a service quality evaluation model is proposed based on the service quality measurement (SERVQUAL) scale and machine learning algorithm. Primarily, items that affect the quality of service are determined based on the SERVQUAL scale. Subsequently, a service quality assessment model is generated to manage the resources that are allocated to improve the activities efficiently. Following this phase, a sample of classification model is conducted. Machine learning algorithms are used to establish the classification model.

Findings

The proposed evaluation model addresses the following questions: What are the potential impact levels of service quality dimensions on the quality of service practically? What should be prioritization among the service quality dimensions and Which dimensions of service quality should be improved primarily? A real-life case study in a public hospital is carried out to reveal how the proposed model works. The results that have been obtained from the case study show that the proposed model can be conducted easily in practice. It is also found that there is a remarkably high-service gap in the public hospital, in which the case study has been conducted, regarding the general physical conditions and food services.

Originality/value

The primary contribution of this study is threefold. The proposed evaluation model determines the impact levels of service quality dimensions on the service quality in practice. The proposed evaluation model prioritizes service quality dimensions in terms of their significance. The proposed evaluation model finds out the answer to the question of which service quality dimensions should be improved primarily?

Details

Kybernetes, vol. 51 no. 2
Type: Research Article
ISSN: 0368-492X

Keywords

Access Restricted. View access options
Article
Publication date: 1 January 2004

Birdogˇan Baki, Türkay Dereli and Adil Baykasogˇlu

Enterprise resource planning (ERP) is a game plan for planning and monitoring all of the resources of a manufacturing company. It has been recognized as an effective management…

1811

Abstract

Enterprise resource planning (ERP) is a game plan for planning and monitoring all of the resources of a manufacturing company. It has been recognized as an effective management system leading to excellent planning and scheduling capability and significant improvements in productivity. It also provides dramatic increases in customer service, much higher inventory turns, and greater reduction in materials costs. The enterprise resource management (ERM) organizational assessment checklist provides a simple and practical reference to determine whether companies are ready for today’s competitive business environment. In this study, the checklist has been surveyed within the companies using ERP systems through a questionnaire. The survey data were analyzed to determine whether the companies (using ERP software) in Turkey are ready to implement ERM..

Details

Journal of Manufacturing Technology Management, vol. 15 no. 1
Type: Research Article
ISSN: 1741-038X

Keywords

Access Restricted. View access options
Article
Publication date: 1 May 2020

Emre Cevikcan and Mehmet Bulent Durmusoglu

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition…

278

Abstract

Purpose

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition to providing uniform workload balancing and skill improving environment. In assembly systems, RC inspires the development of walking worker assembly line (WWAL). On the other hand, U-type assembly lines (UALs) may provide higher worker utilization, lower space requirement and more convenient internal logistics when compared to straight assembly lines. In this context, this study aims to improve assembly line performance by generating RC cycles on WWAL with respect to task assignment characteristics of UAL within reasonable walking distance and space requirement. Therefore, a novel line configuration, namely, segmented rabbit chase-oriented U-type assembly line (SRCUAL), emerges.

Design/methodology/approach

The mathematical programming approach treats SRCUAL balancing problem in a hierarchical manner to decrease computational burden. Firstly, segments are generated via the first linear programming model in the solution approach for balancing SRCUALs to minimize total number of workers. Then, stations are determined within each segment for forward and backward sections separately using two different pre-emptive goal programming models. Moreover, three heuristics are developed to provide solution quality with computational efficiency.

Findings

The proposed mathematical programming approach is applied to the light-emitting diode (LED) luminaire assembly section of a manufacturing company. The adaptation of SRCUAL decreased the number of workers by 15.4% and the space requirement by 17.7% for LED luminaire assembly system when compared to UAL. Moreover, satisfactory results for the proposed heuristics were obtained in terms of deviation from lower bound, especially for SRCUAL heuristics I and II. Moreover, the results indicate that the integration of RC not only decreased the number of workers in 40.28% (29 instances) of test problems in U-lines, but also yielded less number of buffer points (48.48%) with lower workload deviation (75%) among workers in terms of coefficient of variation.

Practical implications

This study provides convenience for capacity management (assessing capacity and adjusting capacity by changing the number of workers) for industrial SRCUAL applications. Meanwhile, SRCUAL applications give the opportunity to increase the capacity for a product or transfer the saved capacity to the assembly of other products. As it is possible to provide one-piece flow with equal workloads via walking workers, SRCUAL has the potential for quick realization of defects and better lead time performance.

Originality/value

To the best of the authors’ knowledge, forward–backward task assignments in U-type lines have not been adapted to WWALs. Moreover, as workers travel overall the line in WWALs, walking time increases drastically. Addressing this research gap and limitation, the main innovative aspect of this study can be considered as the proposal of a new line design (i.e. SRCUAL) which is sourced from the hybridization of UALs and WWAL as well as the segmentation of the line with RC cycles. The superiority of SRCUAL over WWAL and UAL was also discussed. Moreover, operating systematic for SRCUAL was devised. As for methodical aspect, this study is the first attempt to solve the balancing problem for SRCUAL design.

Details

Assembly Automation, vol. 40 no. 3
Type: Research Article
ISSN: 0144-5154

Keywords

1 – 3 of 3
Per page
102050