Article
Publication date: 8 August 2016

Serdar Durdyev and Syuhaida Ismail

The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry.

2150

Abstract

Purpose

The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry.

Design/methodology/approach

Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels.

Findings

Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.

Originality/value

It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.

Details

Structural Survey, vol. 34 no. 4/5
Type: Research Article
ISSN: 0263-080X

Keywords

Available. Open Access. Open Access
Article
Publication date: 28 September 2021

Mohammed Hamza Momade, Serdar Durdyev, Dave Estrella and Syuhaida Ismail

This study reviews the extent of application of artificial intelligence (AI) tools in the construction industry.

6601

Abstract

Purpose

This study reviews the extent of application of artificial intelligence (AI) tools in the construction industry.

Design/methodology/approach

A thorough literature review (based on 165 articles) was conducted using Elsevier's Scopus due to its simplicity and as it encapsulates an extensive variety of databases to identify the literature related to the scope of the present study.

Findings

The following items were extracted: type of AI tools used, the major purpose of application, the geographical location where the study was conducted and the distribution of studies in terms of the journals they are published by. Based on the review results, the disciplines the AI tools have been used for were classified into eight major areas, such as geotechnical engineering, project management, energy, hydrology, environment and transportation, while construction materials and structural engineering. ANN has been a widely used tool, while the researchers have also used other AI tools, which shows efforts of exploring other tools for better modelling abilities. There is also clear evidence of that studies are now growing from applying a single AI tool to applying hybrid ones to create a comparison and showcase which tool provides a better result in an apple-to-apple scenario.

Practical implications

The findings can be used, not only by the researchers interested in the application of AI tools in construction, but also by the industry practitioners, who are keen to further understand and explore the applications of AI tools in the field.

Originality/value

There are no studies to date which serves as the center point to learn about the different AI tools available and their level of application in different fields of AEC. The study sheds light on various studies, which have used AI in hybrid/evolutionary systems to develop effective and accurate predictive models, to offer researchers and model developers more tools to choose from.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Access Restricted. View access options
Article
Publication date: 8 September 2021

Serdar Durdyev, Saeed Reza Mohandes, Amir Mahdiyar and Syuhaida Ismail

Homebuyers' motivation to purchase the green building (GB) is vital for the widespread adoption of greener practices and for tackling the adverse impact of the built environment…

705

Abstract

Purpose

Homebuyers' motivation to purchase the green building (GB) is vital for the widespread adoption of greener practices and for tackling the adverse impact of the built environment. In this regard, through the lenses of qualified and competent GB developers (GBD) and real estate agents (REAs) using judgment sampling technique, this paper aims to evaluate the factors stimulating the purchase intention of Malaysian homebuyers.

Design/methodology/approach

The study uses the interval-valued fuzzy Delphi method (IVFDM) to identify influential factors, while the cybernetic fuzzy analytic hierarchy process (CFAHP) for prioritizing the identified factors according to their significance in nationwide promotion of GBs is utilized.

Findings

The findings, which are consistent with those reported in the literature and validated by the focus group, uncover the most prominent factors that drive the purchase intention of GB homebuyers. The results indicate that the homebuyers are familiar with the benefits of GB; however, the benefits are not sufficient to overcome the perceived “high cost” of green practices. Hence, homebuyers still seek financial incentives, which is a clear indication that financial issues are the most motivating factor.

Practical implications

Increase in informative promotion of GB is necessary, particularly among prospective homebuyers in developing countries where GB adoption is in its infancy. Frontline players (those who are responsible for wider promotion) can utilize the factors that this study found to be important to identify appropriate steps to increase prospective homebuyers' motivation for purchasing greener dwellings.

Originality/value

The contribution of this paper is threefold. First, review and identification of the most cited determinants that have been reported in the context of the subject. Second, this paper presents the most significant determinants in a developing country setting through the lenses of Malaysian experts in the area. Third, improvement measures could be implemented in Malaysia and other developing countries to promote the GB paradigm with an aim to make the building environment more sustainable.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 22 July 2019

Serdar Durdyev, M. Reza Hosseini, Igor Martek, Syuhaida Ismail and Mehrdad Arashpour

The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia.

1199

Abstract

Purpose

The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia.

Design/methodology/approach

Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique.

Findings

Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier.

Research limitations/implications

Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005).

Practical implications

Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework.

Originality/value

Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 17 September 2021

Sanaz Tabatabaee, Mojtaba Ashour, Saeed Reza Mohandes, Haleh Sadeghi, Amir Mahdiyar, M. Reza Hosseini and Syuhaida Ismail

Green walls (GWs), comprising living walls and green facades, have been touted as environmentally friendly products in architectural design. GWs can be viable in every aspect of…

607

Abstract

Purpose

Green walls (GWs), comprising living walls and green facades, have been touted as environmentally friendly products in architectural design. GWs can be viable in every aspect of sustainability; they provide residents of buildings with a wide range of economic, social and environmental benefits. Despite this, the adoption rate of GW is still in its infancy stage, and the existing literature concerning the hindrances inhibiting GW adoption is very limited. To address these gaps, the aim of this paper is to identify and prioritize the hindrances to GW adoption in Hong Kong.

Design/methodology/approach

After identifying 17 hindrances through an in-depth review of literature, the fuzzy Delphi method (FDM) is employed to refine the hindrances based on the local context with the help of 21 qualified experts in the field. Subsequently, Fuzzy Parsimonious Analytic Hierarchy Process (FPAHP) is exploited as a recently developed technique to prioritize the identified hindrances.

Findings

Results reveal that the most significant hindrances to the adoption of GW are maintenance cost, high installation cost, difficulties in maintenance, sophisticated implementation and inducement to fire. Findings call for scholars to address ways to improve GW installation practices and methods in order to eradicate the hindrances and provide lessons for policymakers, assisting them in facilitating the larger-scale adoption of GW.

Originality/value

Considering the dearth of studies on hindrances to the adoption of GWs, this paper provides a comprehensive outlook of the issue, providing knowledge that can be used as a building block for future scholars within the field. It also provides valuable insights for stakeholders within the construction industry about the hindrances to the adoption of GWs which could direct their efforts toward better implementation of it.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Article
Publication date: 8 November 2022

Sanaz Tabatabaee, Mojtaba Ashour, Haleh Sadeghi, Seyed Amirali Hoseini, Saeed Reza Mohandes, Amir Mahdiyar, Syuhaida Ismail and M. Reza Hosseini

To come up with a prudent decision on the installation of an appropriate green wall (GW) on buildings, this study presents a novel decision-making algorithm. The proposed…

301

Abstract

Purpose

To come up with a prudent decision on the installation of an appropriate green wall (GW) on buildings, this study presents a novel decision-making algorithm. The proposed algorithm considers the importance of barriers hampering GW adoption, as well as their relationships with regard to different types of GWs existing in a contextual setting.

Design/methodology/approach

The proposed methodological approach is based on the integration of qualitative and quantitative techniques by employing focus group discussion, fuzzy-based best-worst method and fuzzy TOPSIS.

Findings

Based on the experiences of qualified experts involved in related projects in Hong Kong, the following conclusions are drawn: (1) cost, installation and maintenance-related barriers are perceived to have the highest importance, (2) modular living wall system is the most suitable GW system for the context of Hong Kong and (3) existing barriers are found to have a pivotal role in the ranking of the most suitable GW systems.

Practical implications

The findings provide valuable insight not only for policymakers and stakeholders, but also for establishing a methodological approach that can assist decision-makers in identifying the most beneficial GW system rather than the most applicable one. This could have significant implications and introduce potential changes to the common way of practice within the industry and lay the foundation for wider adoption of GW.

Originality/value

While previous studies have investigated the sustainability-related issues of GW façade applications, the current body of knowledge is deprived of a comprehensive methodological approach for the selection of the most suitable GW systems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Access Restricted. View access options
Book part
Publication date: 25 April 2022

Ainarull Assikin Abdul Hadi, Syuhaida Ismail, Nur Izzati Ab Rani and Nur Fatin Syazwani Abu Bakar

In Malaysia, there seems to be no mutual and general agreement among construction industry players and researchers on what the critical success factors (CSFs) of construction

Abstract

In Malaysia, there seems to be no mutual and general agreement among construction industry players and researchers on what the critical success factors (CSFs) of construction projects are since characteristics of construction projects vary across various projects complexity. This chapter thus examines the CSFs for affordable high-rise public housing projects in Malaysia through a thorough review of the literature on the CSFs, which were then contextually customised via a pilot study and presented in the form of Relative Importance Index (RII). Primary data were collected via administration of questionnaire surveys to 170 construction stakeholders of affordable high-rise public housing projects in Malaysia. The findings of this study revealed that the top 10 ranks are good management and supervision at site, good personal behaviour by all participants, good implementation in safety management and practice, high commitment in quality control by management, competent manager/supervisor, good communication and coordination, good and enough material and equipment, experience worker, clear objective and goals and good support by senior employee/management, whereby it is crucial in ensuring the project success of affordable high-rise public housing projects in Malaysia. This chapter provides clear guidelines for the contractors of affordable high-rise public housing projects to be more competitive in the construction industry by illustrating the important factors to be considered while delivering the projects to their respective clients.

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

Keywords

Available. Content available
Book part
Publication date: 25 April 2022

Free Access. Free Access

Abstract

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

Access Restricted. View access options
Article
Publication date: 21 August 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of…

269

Abstract

Purpose

Evaluating project success within the construction industry presents challenges due to the unique characteristics of the sector, the complexity of projects, and the involvement of diverse stakeholders. Conducting a bibliometric analysis, this paper aims to unravel the major research themes and methodologies utilised by researchers in studying the critical success criteria for construction projects, as well as extracting these success criteria.

Design/methodology/approach

The researchers systematically searched and screened 95 papers from Scopus and Web of Science (WoS) databases. This study conducted research focus parallelship network (RFPN) analysis and keywords co-occurrence network (KCON) analysis using BibExcel and Gephi to cluster the papers, illuminate the relationships among keywords within each cluster, and identify the primary research directions.

Findings

Using the RFPN analysis, this study classified the papers into three distinct clusters: infrastructure and public projects success, risk and knowledge management, and contractors and procurement management. Statistical techniques such as structural equation modelling (SEM) and multi-criteria decision-making methods such as analytic hierarchy process (AHP) have been used to analyse project success in the construction industry.

Research limitations/implications

Considering the intensified demand for streamlined digital interactions and the increasing emphasis on sustainability and safety performance, construction companies are recommended to allocate greater investments toward the automation and digitisation of their products and processes. Prioritising modular construction and embracing transformative technologies alongside data science is crucial for enabling well-informed decision-making, and enhancing project success.

Originality/value

This study contributes to the existing body of knowledge by conducting a quantitative and systematic evaluation of the literature on project success criteria in the construction industry and uncovering key research areas. It addresses the pressing need to understand the complexities of construction projects amidst evolving industry dynamics and emerging disruptions. Moreover, by highlighting the implications of digital innovations and modular construction, this study urges deeper exploration into their impact on project performance and stakeholder satisfaction. This research sets a comprehensive framework for investigating the interplay between project complexity, technological advancements, and sustainable practices in the construction sector, paving the way for strategic advancements in the field.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords