Jingbin Hao, Xin Chen, Hao Liu and Shengping Ye
To remanufacture a disused part, a hybrid process needs to be taken in part production. Therefore, a reasonable machining route is necessary to be developed for the hybrid…
Abstract
Purpose
To remanufacture a disused part, a hybrid process needs to be taken in part production. Therefore, a reasonable machining route is necessary to be developed for the hybrid process. This paper aims to develop a novel process planning algorithm for additive and subtractive manufacturing (ASM) system to achieve this purpose.
Design/methodology/approach
First, a skeleton of the model is generated by using thinning algorithm. Then, the skeleton tree is constructed based on topological structure and shape feature. Further, a feature matching algorithm is developed for recognizing the different features between the initial model and the final model based on the skeleton tree. Finally, a reasonable hybrid machining route of the ASM system is generated in consideration of the machining method of each different sub-feature.
Findings
This paper proposes a hybrid process planning algorithm for the ASM system. Further, it generates new process planning insights on the hybrid process service provider market.
Practical implications
The proposed process planning algorithm enables engineers to obtain a proper hybrid machining route before product fabrication. And thereby, it extends the machining capability of the hybrid process to manufacture some parts accurately and efficiently.
Originality/value
This study addresses one gap in the hybrid process literature. It develops the first hybrid process planning strategy for remanufacturing of disused parts based on skeleton tree matching, which generates a more proper hybrid machining route than the currently available hybrid strategy studies. Also, this study provides technical support for the ASM system to repair damaged parts.
Details
Keywords
Jianchun Sun, Shiyong Yang, Shengping Huang, Zhijiang Shang and Weihao Ling
This paper addresses the issue of internal spatial environmental pollution in non-blasting tunnel construction by proposing a comprehensive evaluation model. The model aims to…
Abstract
Purpose
This paper addresses the issue of internal spatial environmental pollution in non-blasting tunnel construction by proposing a comprehensive evaluation model. The model aims to provide a scientific basis for environmental pollution prevention in non-blasting tunnel construction, thereby facilitating green tunnel construction and sustainable development management.
Design/methodology/approach
The study firstly refines and constructs the evaluation index system from the perspective of pollution sources. A novel weight calculation method is introduced by integrating the analytic hierarchy process (AHP) with the ordered weighted averaging (OWA) operator, and a comprehensive evaluation model for internal environmental pollution in non-blasting tunnels is established by incorporating the grey clustering evaluation method. Finally, an empirical study is conducted using the Erbaoshan Tunnel as a case study to verify the feasibility and effectiveness of the model.
Findings
The study develops an evaluation system for internal environmental pollution in non-blasting tunnels and applies it to the Erbaoshan Tunnel. The results classify the pollution level as “general pollution,” confirming the rationality and applicability of the evaluation system and model while also identifying the primary pollution factors.
Originality/value
This study first developed a comprehensive evaluation system for environmental pollution in non-blasting tunnel construction from the pollution source perspective, making the system more comprehensive. Additionally, it innovatively combined AHP–OWA and gray clustering methods to scientifically assess pollution levels, providing valuable scientific guidance for the evaluation and management of non-blasting tunnels and similar underground projects.