Search results

1 – 1 of 1
Per page
102050
Citations:
Loading...
Access Restricted. View access options
Article
Publication date: 13 November 2023

Xiaodi Xu, Shanchao Sun, Yang Fei, Liubin Niu, Xinyu Tian, Zaitian Ke, Peng Dai and Zhiming Liang

This article aims to predict the rapid track geometry change in the short term with a higher detection frequency, and realize the monitoring and maintenance of the railway state.

78

Abstract

Purpose

This article aims to predict the rapid track geometry change in the short term with a higher detection frequency, and realize the monitoring and maintenance of the railway state.

Design/methodology/approach

Firstly, the ABA data needs to be filtered to remove the DC component to reduce the drift due to integration. Secondly, the quadratic integration in frequency domain for concern components of the vertical and lateral ABA needs to be done. Thirdly, the displacement in lateral of the wheelset to rail needs to be calculated. Then the track alignment irregularity needs to be calculated by the integration of lateral ABA and the lateral displacement of the wheelset to rail.

Findings

By comparing with a commercial track geometry measurement system, the high-speed railway application results in different conditions, after removal of the influence of LDWR, identified that the proposed method can produce a satisfactory result.

Originality/value

This article helps realize detection of track irregularity on operating vehicle, reduce equipment production, installation and maintenance costs and improve detection density.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

1 – 1 of 1
Per page
102050