Jamil Sarhan, Bo Xia, Sabrina Fawzia, Azharul Karim and Ayokunle Olanipekun
The purpose of this paper is to identify the barriers to implementing lean construction in the Kingdom of Saudi Arabia (KSA) construction industry and to prioritise the principal…
Abstract
Purpose
The purpose of this paper is to identify the barriers to implementing lean construction in the Kingdom of Saudi Arabia (KSA) construction industry and to prioritise the principal factors that constitute these barriers.
Design/methodology/approach
A literature review was initially used to reveal the global barriers to implementing lean construction. Subsequently, these barriers were incorporated into a structured questionnaire, and a convenience sample of 282 construction professionals in the KSA construction industry was surveyed. The results were analysed using mean item score (MIS), Mann–Whitney U test and principal component analysis (PCA).
Findings
The findings revealed 22 barriers to lean construction implementation in the KSA construction industry. Principal factors that constitute these barriers were found to be traditional practices, client related, technological, performance and knowledge and cost-related barriers in descending order of pervasiveness. The study also proposes solutions to overcome these principal barriers.
Originality/value
This study provides a global overview of the barriers to implementing lean construction. It contributes to the body of knowledge, as it uncovers for the first time the barriers to implementing lean construction in the KSA construction industry with reference to the socio-cultural, economic and operational context of the KSA. Thus, it is relevant to other countries in the Middle East because of their shared similarities to the KSA. Furthermore, the solutions proposed to overcome these barriers in the KSA construction industry can be applied in other countries where similar barriers are identified.
Details
Keywords
Jamil Ghazi Sarhan, Bo Xia, Sabrina Fawzia, Azharul Karim, Ayokunle Olubunmi Olanipekun and Vaughan Coffey
The purpose of this paper is to develop a framework for implementing lean construction and consequently to improve performance levels in the construction industry in the context…
Abstract
Purpose
The purpose of this paper is to develop a framework for implementing lean construction and consequently to improve performance levels in the construction industry in the context of Saudi Arabia. There is currently no framework for implementing lean construction specifically tailored to the Kingdom of Saudi Arabia (KSA) construction industry. Existing lean construction frameworks are focussed on other countries and are less applicable in the KSA due to differences in socio-cultural and operational contexts.
Design/methodology/approach
This study employs the interpretive structural modelling (ISM) technique for data collection and analysis. First, following a survey of 282 construction professionals, 12 critical success factors (CSFs) for implementing lean construction in the KSA construction industry were identified by Sarhan et al. (2016). Second, 16 of these professionals who have 15 years or more experience were exclusively selected to examine the contextual relationship among the 12 CSFs. A row and column questionnaire was used for a pairwise comparison of the CSFs. A matrix of cross-impact multiplications (MICMAC) was applied to analyse the questionnaire data to develop an ISM model that can serve as a framework for implementing lean construction. Third, the framework was subjected to further validation by interviewing five experts to check for conceptual inconsistencies and to confirm the applicability of the framework in the context of the KSA construction industry.
Findings
The findings reveal that the CSFs are divided into four clusters: autonomous, linkage, dependent and driving clusters. Additionally, the findings reveal seven hierarchies of inter-relationships among the CSFs. The order of practical application of the CSFs descends from the seventh hierarchy to the first hierarchy.
Originality/value
The new framework is a significant advancement over existing lean construction frameworks as it employs an ISM technique to specify the hierarchical relationships among the different factors that contribute to the successful implementation of lean construction. The primary value of this study is the development of a new framework that reflects the socio-cultural and operational contexts in the KSA construction industry and can guide the successful implementation of lean construction. Therefore, construction industry operators such as contractors, consultants, government departments and professionals can rely on the framework to implement lean construction more effectively and successfully.