Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered…

Abstract

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered that the Nigerian construction industry is confronted with fragmentation and poor information management. The stakeholders within the Nigerian construction industry proposed the adoption of SCM to overcome the fragmentation and other shenanigans facing the industry. This chapter revealed that construction supply chain (CSC) practices within the Nigerian construction industry focus on waste elimination by adopting the lean concept. The focus on the lean concept could be attributed to the numerous research related to lean or the enormous waste emanating from the Nigerian construction industry. Regardless of the emphasis on lean, the Nigerian CSC is still confronted with fragmentation and heavy waste generation. Thus, this chapter proposed the adoption of principles and technologies driven by the fourth industrial revolution (4IR) is a paradigm shift for the management of CSC in the country. It was discovered in this chapter that Nigerian construction supply stakeholders had not embraced the technologies and principles of the 4IR. The failure to adopt the technologies driven by the 4IR is attributed to the absence of a CSC model that depicts the management of CSC in alignment with the 4IR. This chapter called for developing a SCM model for the Nigerian construction industry in tandem with the principles and technologies of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Available. Content available
Book part
Publication date: 6 November 2023

Abstract

Details

Higher Education in Emergencies: International Case Studies
Type: Book
ISBN: 978-1-83797-345-3

Access Restricted. View access options
Article
Publication date: 12 December 2018

Samson Oluseun Ojekalu, Olatoye Ojo, Timothy Tunde Oladokun, Sumoila Aremu Olabisi and Sunday Samuel Omoniyi

The purpose of this paper is to assess the service quality (SQ) of property managers of shopping complexes in Ibadan with a view to improving management practice.

517

Abstract

Purpose

The purpose of this paper is to assess the service quality (SQ) of property managers of shopping complexes in Ibadan with a view to improving management practice.

Design/methodology/approach

Primary data were used for the study through questionnaire administration. Ibadan was stratified into five axes using existing major roads where shopping complexes were highly concentrated. From each axis, 33, 65, 48, 64 and 66 shopping complexes were identified (Oyo State Ministry of Land, Housing and Survey, 2017), and the systematic sampling technique (20 percent) was adopted to select 57 out of 276 shopping complexes and 192 (10 percent) out of 1919 occupiers of the shopping complexes in the study area. In total, 157 occupiers responded to the questionnaire, and the data were analyzed using mean ranking and stepwise multiple regression.

Findings

This study found that professionalism, tangible, assurance and empathy dimensions of SQ were rated fair, whereas reliability and responsiveness dimensions were rated poor. Also, stepwise multiple regression analysis predicted 78.5 percent overall SQ of property managers, and assurance, professionalism and empathy dimensions contributed significantly to the overall SQ. Hence, reliability and responsiveness dimensions of SQ need to be improved. It is expected that the findings of this study will help property managers to understand the role of various dimensions of SQ for enhanced property management practice.

Originality/value

The study is one of the few studies that assessed the SQ of property managers of shopping complex with a view to improving its management practice.

Details

Property Management, vol. 37 no. 3
Type: Research Article
ISSN: 0263-7472

Keywords

Access Restricted. View access options
Article
Publication date: 21 October 2021

Olatoye Ojo, Daniel Ibrahim Dabara and Michael Tolulope Adeyemi Ajayi

This study examined the performance of commercial and residential real estate investments in the Ibadan property market to provide information for investment decisions.

407

Abstract

Purpose

This study examined the performance of commercial and residential real estate investments in the Ibadan property market to provide information for investment decisions.

Design/methodology/approach

The study used a mixed research design (qualitative and quantitative). Data were obtained employing in-depth interviews with randomly selected sixteen estate surveyors and valuers practising in the Ibadan property market. Data for the study were analysed using the phenomenological thematic content analysis. Similarly, data on rental and capital values were translated to income, capital and holding period returns. The Kwiatkowski–Phillips–Schmidt–Shin (KPSS) and Philip–Perron (PP) models were used for unit root analysis. Ordinary least square (OLS) regression model was used to test for inflation-hedging characteristics, and the Granger causality tests were carried out to analyse the causal relationship between the variables.

Findings

The study revealed that the Ibadan property market is still immature. For the return components, the study found that the Ibadan property market provided mean holding period returns of 10.82%, 14.31 and 8.29% for office, shop and residential property types, respectively. The study also revealed that the selected property types are perverse hedges against inflation. Similarly, the study showed a unidirectional causal relationship between inflation and returns on the selected property types.

Practical implications

Results of this study revealed the peculiar nature of the Ibadan property market; findings from the survey can be used as a guide for investment decisions by foreign and domestic investors. Shrewd investors can take advantage of the high returns provided by the real estate assets in the Ibadan property market (by investing in the property market) to obtain high returns and expand their investment portfolio.

Originality/value

This study is the first to examine, in an eclectic and comparative context, the performance of commercial and residential properties in the Ibadan property market from the perspective of its market maturity level, returns profile, as well as its inflation-hedging characteristics. Findings from the study will equip both individual and institutional investors with valuable information for investment decisions.

Details

Property Management, vol. 40 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Access Restricted. View access options
Article
Publication date: 3 February 2020

Emmanuel Oluwatobi Adebisi, Oluwaseyi Olalekan Alao and Stephen Okunlola Ojo

The continuous failure of construction projects notwithstanding appreciable increase in project management knowledge has necessitated a proactive approach of assessing early…

311

Abstract

Purpose

The continuous failure of construction projects notwithstanding appreciable increase in project management knowledge has necessitated a proactive approach of assessing early warning signs (EWS) of building projects failure. Building projects are expected to show warning signs before experiencing crises, comparable to a patient displaying symptoms of a disease. Thus, this study aims to examine the EWS that predisposed building projects to failure in Nigeria to provide empirical data for enhancing projects delivery.

Design/methodology/approach

Primary data were used for the study. Structured questionnaire was administered to consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of questionnaire were administered and 134 copies (combined response rate of 74.44 per cent) were retrieved. Frequency distribution, percentages, mean item score and Mann–Whitney test were used to analyse the data.

Findings

Most construction professionals applied the EWS approach from project planning and early construction phase. The most significant EWS predisposing building projects to failure were “Management inability and incompetence to proactively detect and manage problems at early project stages”, “Actual expenditure is constantly shooting beyond cost estimates” and “Incurred costs already getting higher than the anticipated benefits”. Project/construction management-related symptoms are most significant to predisposing building projects to failure.

Practical implications

The study provided implications for effective project management of building projects through proactive approach which is very paramount to improving the delivery of building projects in Nigeria.

Originality/value

The study provides implications for proactive management of building projects, thereby enhancing the delivery of building projects.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Access Restricted. View access options
Book part
Publication date: 5 April 2022

Ayodeji Emmanuel Oke, Seyi Segun Stephen, Clinton Ohis Aigbavboa, Deji Rufus Ogunsemi and Isaac Olaniyi Aje

This chapter discusses the involvement of procurement in smart city development. Procurement plays a vital role in the development of strategies in planning, and execution in the…

Abstract

This chapter discusses the involvement of procurement in smart city development. Procurement plays a vital role in the development of strategies in planning, and execution in the construction industry. This is further introduced into smart city to find the best possible methods of bringing the ideas behind smart city into realisation. The common procurement methods are explained along with their involvement in smart city. Common drawbacks to smart cities procurement and measures to challenges in the procurement of smart city are also explicitly explained in the chapter. Through an identified and accepted procurement method into smart city, the processes involved in executing smart city will be the ones with directions and proper planning.

Details

Smart Cities: A Panacea for Sustainable Development
Type: Book
ISBN: 978-1-80382-455-0

Keywords

Access Restricted. View access options
Article
Publication date: 1 October 2006

Aderemi Y. Adeyemi, Stephen O. Ojo, Omotayo O. Aina and Emmanuel A. Olanipekun

Female resource represents about half of Nigeria's human resources. For optimal utilization of human resources, gender equality and equity, it was considered that women should be…

2505

Abstract

Purpose

Female resource represents about half of Nigeria's human resources. For optimal utilization of human resources, gender equality and equity, it was considered that women should be adequately represented in the construction industry which is the prime motivator of the country's economy. A survey was, therefore, conducted to know the level of participation of women in some selected categories of workforce in the industry.

Design/methodology/approach

The research was designed to generate quantitative data on women participation in the construction industry in Nigeria. Data were, therefore, collected from medium and large construction contracting companies on the male/female numerical strength in some selected categories of workforce, the suitability of some construction tasks for women and constraints to female entry into the construction industry using questionnaires, interviews and visits to construction sites.

Findings

The survey revealed that only 16.3 per cent of the sampled companies' workforces were women. Approximately, 50 per cent of these women were employed as labourers, 37.5 per cent as administrative staff, 10 per cent as management staff and 2.5 per cent as craftswomen. Paired t‐test performed on the male/female numerical strength showed that women were underrepresented in the construction industry in Nigeria. The survey also indicated that women preferred office related construction processes to site production.

Originality/value

Findings in this field survey represent the unbiased level of women's participation in Nigeria's construction industry and the data are useful for policy formulation in relation to mainstreaming female into the construction industry.

Details

Women in Management Review, vol. 21 no. 7
Type: Research Article
ISSN: 0964-9425

Keywords

Access Restricted. View access options
Article
Publication date: 19 April 2018

Emmanuel Oluwatobi Adebisi, Stephen Okunola Ojo and Oluwaseyi Olalekan Alao

The failure and abandonment of construction projects have proven to be insurmountable problems incessantly militating against the efficient performance of the construction…

1143

Abstract

Purpose

The failure and abandonment of construction projects have proven to be insurmountable problems incessantly militating against the efficient performance of the construction industry in Nigeria. The complexity, technicality and a host of other project execution issues unique to multi-storey building projects do increase their susceptibility to failure and abandonment. Thus, the purpose of this paper is to examine the factors influencing failure and abandonment of multi-storey building projects in Nigeria. This is with a view to provide inferential empirical data that could enhance successful delivery of multi-storey building projects in Nigeria.

Design/methodology/approach

Primary data were used for the study. A structured questionnaire was administered on consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of the questionnaire were administered ,and 134 copies which represent a combined response rate of 74.4 per cent were retrieved. The data were analysed using frequency distribution and percentages, Mean item score and factor analysis.

Findings

The factors most significant to the failure and abandonment of multi-storey building projects are inadequate funding by the client, improper planning at the pre-construction phase, structural failure in multi-storey building during construction, bankruptcy/business failure of the contractor, improper scheduling of the building project activities and failure to engage qualified professionals with technical expertise and experience. The rated factors clustered under human resources capability, planning and structural quality, contractor selection and variation, insecurity and variation, and force majeure and political risk.

Research limitations/implications

The study was limited to multi-storey building projects in Lagos State, Nigeria. Further studies could focus on specific resuscitation strategies for abandoned multi-storey building projects.

Practical implications

The study provided implications for effective project and contract management of multi-storey building projects which is very paramount to improve the delivery of complex, technical- and capital-intensive building projects in Nigeria.

Originality/value

The study provides specific implications for the management of multi-storey building projects, thereby enhancing the delivery of building projects.

Details

International Journal of Building Pathology and Adaptation, vol. 36 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords

Access Restricted. View access options
Article
Publication date: 1 January 2004

Olaonipekun Henry Olabode

Development runs on a continuum, having traditional, transitional and desired (relative) development stages. Rather than moving on, the continent of Africa has remained…

333

Abstract

Development runs on a continuum, having traditional, transitional and desired (relative) development stages. Rather than moving on, the continent of Africa has remained perpetually transitional due to its inability to strategically position itself globally, and its attendant international maneuvers; as well as its inability to break away from the anti‐development traits of the traditional stage of development and launch into the future. This, has invariably resulted in a ‘Departure‐Arrival’ (from one stage of development to another) crises, and distractions, confusions, and uncertainties, which now pervade the development terrain of Africa.

Details

International Journal of Development Issues, vol. 3 no. 1
Type: Research Article
ISSN: 1446-8956

Access Restricted. View access options
Book part
Publication date: 1 July 2024

Bernard Arthur-Aidoo, Princess Naa Kwarkai Quartey, Perry Ransgreg Nunoo and Alex Kwaku Adzinku

Creating our built environment is largely the responsibility of the dynamic and complex construction industry. This business is made up of a wide range of people who work together…

Abstract

Creating our built environment is largely the responsibility of the dynamic and complex construction industry. This business is made up of a wide range of people who work together to construct buildings and infrastructure projects, from contractors and labourers to architects and engineers. Aside from its observable results, the construction sector has a particular culture and atmosphere that are formed by a special fusion of history, creativity and teamwork. The culture and environment in which the construction industry functions are the main topics of this section of the book.

Details

Breaking Ground
Type: Book
ISBN: 978-1-83549-638-1

Keywords

1 – 10 of over 1000
Per page
102050